“Modernisation of the wastewater treatment plant in Widuchowa” (Q137906): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 13:27, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Modernisation of the wastewater treatment plant in Widuchowa” |
Project in Poland financed by DG Regio |
Statements
2,603,656.41 zloty
0 references
3,767,643.99 zloty
0 references
85.0 percent
0 references
3 September 2018
0 references
31 December 2019
0 references
GMINA WIDUCHOWA
0 references
Projekt obejmował będzie prace bud. dot modern. oczyszczalni ścieków oraz nadzór inwestorski. Moderniz. oczyszczalni ścieków zakłada poprawę stanu techn. i zapewnienie stabilności pracy oczyszcz. oraz zwiększ. przepust. do 2430 RLM. Inwestycja polegała będzie na budowie i modern. następujących obiektów: • Stacji zlewczej ścieków dowożonych; • Zbiornika retencyjnego ścieków dowożonych o poj. 50 m3; • Pompowni ścieków surowych z komorą zasuw; • Stanowiska sitopiaskownika; • Komory rozdziału/selektor; • Reaktora biologicznego; • Osadnika końcowego; • Komory stabilizacji tlenowej osadu; • Stacji dozowania PIX; • Budynku socjalnego/Stacji odwadniania i higienizacji osadu; • Magazynu osadu; • Pomiaru ścieków oczyszczonych. Inwestycja obejmuje również prace z zakresu branży sanit.(instalacje: wodno-kanaliz., c.o., ciepła techno., kotłowni olejowej, wentylacji mechanicznej), drogowej i elektrycznej. Szczegółowe informacje dot. rozwiązań techn. zamieszczono w pkt 4.1.3.2 studium wykonalności. Wnioskodawcą projektu jest Gmina Widuchowa. Za wdrażanie, realizację i rozliczenie niniejszego projektu odpowiedzialni będą pracownicy Urzędu Gminy w Widuchowej. W ramach przedmi. przedsięwzięcia nie planuje się zatrudnienia dodatkowych osób. Omawiany projekt spełnia jeden z podst. warunków otrzymania dofinan., którym jest utrzymanie trwałości projektu przez co najmniej 5 lat od momentu zakończ. jego realizacji. Po zakończeniu realizacji inwest., zarządcą i operatorem będzie zakład budżetowy gminy- ZGK w Widuchowej, co gwarantuje zachowanie celów projektu. Środki na realizację projektu zapewnione zabezpie. zostaną uchwałą budżetową gminy. Niniejsze przeds. jest projektem stacjon. Projekt przewiduje również rozwiąz. zagosp. odpady pościekowe Teren oczyszcz. ścieków wraz z wylotem ścieków do rzeki Odry jest położony na terenie systemu Natura 2000 Dolina Dolnej Odry o kodzie PLB3200. Ponadto sam wylot kanalizacyjny położony jest na terenie systemu Natura 2000 Dolna Odra (Polish)
0 references
The project will include work on the construction of wastewater treatment plants and investment supervision. Moderni. wastewater treatment plants are designed to improve the condition of techn and to ensure the stability of the workforce and to increase the conversion of paragraphs to 2430 p.e.. The investment will consist of the construction and moderation of the following facilities: • Transfer of the water waste water catchment area; • Waste water collection feeder. 50 m³; • Raw waste water pump with the dry chamber; • sitsandstones; • Comoros of distribution/selector; • Bioregulated; • final settlement; • Comoros to stabilise the aerobic sediment; • dosing station PIX; • Social building/drainage and sanitation of the sediment; • sludge; • Measurement of treated waste water. The investment also includes work in the area of the savite sector. (installations: water, engineering, heating, ventilation, mechanical ventilation), road and electricity. Detailed information on technical arrangements is provided in point 4.1.3.2 of the feasibility study. The project applicant is the Municipality of Widuchowa. The staff of the Municipal Office in Widuchowa will be responsible for the implementation, implementation and settlement of this project. The Bill of Action does not plan additional people. The project meets one of the terms of receipt of the project, which is to maintain the project’s sustainability for at least 5 years from the end of the project. After the implementation of the project will be completed, the manager and operator will be the municipal plant of ZZK in Widuchowa, which ensures that the objectives of the project are preserved. The funds for the implementation of the project will be secured by a municipal decision. This foreword is a stackon project. The project also provides for dissolved bed linen Teren waste, together with the effluent from the Odra River to the River Odra, located on the Natura 2000 site of the Lower Oder Valley with code PLB3200. In addition, the sewerage system itself is located on the Natura 2000 site of Lower Oder (English)
0 references
Identifiers
RPZP.03.06.00-32-C005/17
0 references