Preschool of my dreams — construction of a community crèche through the development of nursery school No 1 in Lower Silesia (Q119142): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 12:31, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Preschool of my dreams — construction of a community crèche through the development of nursery school No 1 in Lower Silesia |
Project in Poland financed by DG Regio |
Statements
940,751.23 zloty
0 references
3,493,780.5 zloty
0 references
35.78 percent
0 references
1 March 2016
0 references
29 December 2017
0 references
GMINA USTRZYKI DOLNE
0 references
Projekt obejmuje rozbudowę, budynku Przedszkola nr 1 w Ustrzykach Dolnych. Planowana pow. dydaktyczna nowej części: 190, m 2 . Planowana rozbud. będzie jedno – i dwu kondygnac. łącznik podpiwniczony. Polegać będzie na powiększeniu obiektu od strony południowej o dodatkowe sale dydaktyczne, w tym salę ćwiczeń i gabinet logopedyczny, szatnie i pomieszczenia pomocnicze (o łącznej pow. 754,4 m 2 ). Nowa część budynku zostanie połączona przeszklonym łącznikiem z częścią istniejącą na poziomie obecnego parteru. Przy łączniku powstanie nowa szatnia dla dzieci uczęszczających do przedszkola (do sal w starej i nowej części). Równocześnie powstanie drugie wejście na poziom przyziemia (poziom -1) nowej części i małą szatnię na tym poziomie dla dzieci młodszych. Cały budynek po budowie zostanie dostosowany do nowych wymogów cieplnych oraz będzie dostępny na każdym poziomie dla osób z ograniczoną zdolnością poruszania się, również dla osób na wózku i mam z dziećmi w wózkach. Przed głównym wejściem zostanie dobudowana pochylnia, a w łączniku dźwig osobowy łączący wszystkie kondygnacje nowej i istniejącej części budynku. ZAKRES ROBÓT - Planuje się rozbudowę istniejącego budynku przedszkola na cele powstania żłobka. - Projektowana rozbudowa będzie jedno- i dwukondygnacyjna, łącznik podpiwniczony. - Planowana rozbudowa polegać będzie na powiększeniu obiektu od strony południowej o dodatkowe sale zajęć, szatnie i pomieszczenia pomocnicze. - Planuje się budowę w systemie tradycyjnym (wylewanie betonu na budowie i murowanie): układ konstrukcyjny w oparciu o ściany nośne murowane, uzupełnione miejscowo słupami i podciągami żelbetowymi, stropy monolityczne żelbetowe, dachy dwuspadowe na konstrukcji drewnianej, pokryte blachą dachówkową. - Obecna funkcja budynku rozszerzona o żlobek, przewiduje się stworzenie dodatkowo 3 oddziałów dla dzieci w wieku do lat 3. - Projektuje się malowanie całego nowego budynku. - W wybudowanej części obiektu zastaną wykonane potrzebne instalacje. (Polish)
0 references
The project consists of an extension, of the Pre-School No 1 in the Lower House. The planned teaching strand of the new section: 190, m 2. The building will be expanded and one, and two floors, would be the connecting factor of the podpiwek. This will consist of the extension of the facility from the South to the additional learning rooms, including the exercise room and the speech therapy, changing rooms and the auxiliary facilities (with a combined area). 754.4 m 2). The new part of the building will be combined with a glass link with the part that exists at the level of the current ground floor. A new cloakroom will be created for children attending kindergarten (in old and new parts). At the same time, a second entry will be made at the level (-1) of the new part and the small scale at this level for younger children. The whole building after construction will be adapted to the new thermal requirements and will be available at any level for persons with reduced mobility, also for persons on the trolley and I have a wheelchair. The main entrance will be preceded by the replacement of the ramp and the connecting train connecting all the floors of the new and existing parts of the building. The range of ROBÓT — Planned an extension of the existing nursery school for the creation of a crèche. — The design of the extension will be one and two floors, the connecting factor of the podpiwek. — The planned extension will consist of the extension of the facility from the south to the additional meeting rooms, the changing rooms and the ancillary premises. — It is planned to build in the traditional system (plundering of concrete on construction and masonry): structural layout, based on load-bearing walls based on masonry, supplemented by toppoles and gel-lines, monolithic adjustable beam ceilings, double falling roofs on wooden structures, covered with roof sheet. — The current feature of the building has been extended to include a number of 3 branches for children up to the age of 3. The proposal is to paint a whole new building. — In the built part of the plant, the installations needed will be installed. (English)
0 references
Identifiers
RPPK.06.02.02-18-0009/16
0 references