Improving the functioning of waste water management in the Ruwidnik agglomeration over Sanem through the modernisation of the wastewater treatment plant and the extension of the sanitary sewage system (Q118932): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 12:26, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the functioning of waste water management in the Ruwidnik agglomeration over Sanem through the modernisation of the wastewater treatment plant and the extension of the sanitary sewage system |
Project in Poland financed by DG Regio |
Statements
7,350,435.73 zloty
0 references
11,358,321.84 zloty
0 references
85.0 percent
0 references
28 March 2017
0 references
26 October 2018
0 references
GMINA I MIASTO RUDNIK NAD SANEM
0 references
Celem strategicznym projektu jest poprawa stanu środowiska naturalnego i podniesienie jakości życia mieszkańców na obszarze Gminy i Miasta Rudnik nad Sanem. Przedmiotem podejmowanego projektu jest przebudowa z rozbudową oczyszczalni ścieków w Rudniku nad Sanem wraz z wymaganymi instalacjami i urządzeniami, a także rozbudowa sieci kanalizacji sanitarnej. W ramach projektu przewiduje się prace budowlane i technologiczne w zakresie mechaniczno-biologicznej oczyszczalni ścieków z symultanicznym wspomaganiem usuwania fosforu, pracującej w układzie denitryfikacji wstępnej. Oczyszczalnia ścieków wyposażona zostanie w układ niwelacji ponadnormatywnego napływu ścieków np. w trakcie trwania opadów atmosferycznych. Ponadto przewiduje się montaż instalacji OZE do produkcji energii elektrycznej na potrzeby działania i funkcjonowania oczyszczalni ścieków . Dodatkowo niezbędnym elementem projektu jest rozbudowa działającej sieci kanalizacyjnej na terenie Gminy i Miasta Rudnik nad Sanem (w obszarze aglomeracji Rudnik nad Sanem) o kanalizację grawitacyjną o długości 685 m, kanalizację tłoczną 307 m wraz ze studzienkami 25 szt. oraz budowę przepompowni o średnicy 1500 cm i wysokości 4600 cm. (Polish)
0 references
The strategic objective of the project is to improve the natural environment and to improve the quality of life of the inhabitants of the municipality and of the town of Ruwidk above Sanem. The project is being carried out in connection with the extension of the sewage treatment plant over Sanem with the installations and equipment required, as well as the extension of the sewerage network. The project provides for the construction and technological work of a mechanical and biological waste water treatment plant with simultaneous phosphorus removal, working in a pre-denitrification system. The waste water treatment plant will be equipped with a system of levelling the extra-regulatory flow of wastewater, e.g. in the course of precipitation. In addition, the installation of RES installations for the production of electricity for the operation and operation of the sewage treatment plant is envisaged. In addition, an essential element of the project is the extension of the sewage system in the area of the Ruwidnik Town and City Council over Sanem (in the area of the Ruwidnik agglomeration over Sanem) to gravity sewers with a length of 685 m, a press sewer of 307 m with wells of 25, and the construction of a pumping station with a diameter of 1 500 cm and a height of 4 600 cm. (English)
0 references
Identifiers
RPPK.04.03.01-18-0040/16
0 references