CONSTRUCTION OF A 2-BASED PV FARM (Q101745): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 11:30, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF A 2-BASED PV FARM
Project in Poland financed by DG Regio

    Statements

    0 references
    2,182,585.23 zloty
    0 references
    523,820.45519999997 Euro
    13 January 2020
    0 references
    5,071,873.02 zloty
    0 references
    1,217,249.5247999998 Euro
    13 January 2020
    0 references
    69.0 percent
    0 references
    9 November 2017
    0 references
    30 November 2019
    0 references
    TS WIND SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references

    51°29'55.0"N, 19°9'55.1"E
    0 references
    Projekt obejmuje budowę infrastruktury służącej do produkcji energii elektr. pochodzącej ze źródeł odnawialnych w oparciu o instalację fotowoltaiczną. Beneficjentem i inwestorem proj. będzie TS Wind Sp. z o.o. W wyniku realizacji projektu w miejscowości Malenia Strupiny(Gm. Buczek) powstanie farma fotowoltaiczna wprowadzająca całość wyprodukow. energii do KSE. W ww. miejscowości, na działce nr 147/4 zostaną zamontowane panele fotowolt., zaś przyłącze elektroenergetyczne zostanie zlokalizowane na nieruchom. gruntowej nr 154/1(miejsce wpięcia w linię napowietrzną). Inwestycja składa się z 32 grup zespołów modułów fotowolt. W skład każdej grupy wchodzić będzie zestaw 108 modułów podłączonych do zakupionego inwertera, co łącznie daje 3456 paneli fotowolt.,każdy o mocy 275Wp. Docelowa moc w ramach inwestycji nie będzie przekraczała 0,951MW. Przybliżone parametry techn.paneli fotowolt.: • moc PWp=275Wp • napięcie znamionowe: Un=31,51V • prąd: In=8,72A • prąd zwarciowy: Isc=9,27A • napięcie rozwarcia: Uoc=38,86V • temperaturowy współczynnik mocy:?= -0,39 %/C(Pmpp) • temperaturowy współczynnik prądu:?= +0.060%/C(Isc) • temperaturowy współczynnik napięcia:ß= -0,30%/C(Uoc) • liczba paneli: N=3456 Parametry techn.inwertera: • maksymalna moc: 25550W • maksymalne napięcie wejściowe:1000V • zakres napięcia MPP:390V – 800V • minimalne napięcie wejściowe:150V • znamionowe napięcie wejściowe:600V • zakres napięcia znamionowego AC:160V – 280V • znamionowa częstotliwość sieci:50Hz • znamionowe napięcie sieci:230V Moc pozorna transformatora do którego trafiać będzie energia przetworzona wynosi 800kVA. Beneficjent bezpośrednim jest TS WIND sp. z o.o., pośrednimi są mieszkańcy woj. łódzkiego oraz mieszkańcy RP, będący odbiorcami energii elektrycznej lub jej efektu. Zadania: zad.1–Przygotowanie dokumentacji inwestycyjnej zad.2–Budowa i odbiór instalacji fotowoltaicznej zad.3–Budowa sieci niskiego napięcia -przyłącze do KSE zad.4–Zarządzanie i promocja projektu (Polish)
    0 references
    The project involves the construction of an infrastructure for the production of electricity from renewable sources based on a photovoltaic installation. The beneficiary and the investor would be TS Wind Sp. z o.o. As a result of the project in the town of freezing Stripine (Gm. Buczek), a photovoltaic installation introducing the whole of the energy to the KSE will be created. In the above-mentioned town, a photo bag panel will be installed on plot No 147/4 and the power connection will be located on land no 154/1 (the place of attachment to the line). The investment consists of 32 groups of photo modules. Each group will be composed of a set of 108 modules connected to the inverter purchased, resulting in a total of 3456 photo-fit panels, each with a power of 275Wp. The target capacity of the investment will not exceed 0.951 MW. Indicative parameters for technical photo panels: • Power of PHR = 275Wp• Rated voltage: UN = 31,51V• current: In = 8,72A• short-circuit current: ISC = 9,27A• Distribution voltage: HRS = 38,86V• temperature power factor:? = -0.39 %/C (Pmpp)• Temperature ratio:? = + 0.060 %/C (Isc)• temperature tension factor: ß = -0.30 %/C (UOC)• Number of panels: N = 3456 Converter technical parameters: • Maximum power: 25550W• maximum voltage wejściowe:1000V• MPP voltage range: 390V — 800V• minimum voltage wejściowe:150V• nominal voltage wejściowe:600V• rated voltage• rated AC voltage range 160V — 280V• rated frequency sieci:50Hz• nominal voltage sieci:230V Moc apparent on the transformer to which the processed energy will be transferred is 800kVA. The direct beneficiary is the TS WIND sp. z o.o., indirect residents are residents of Łódzkie Province and residents of the Republic of Poland who are consumers of electricity or have an effect. Tasks: 1 — Preparation of the investment documentation item 2 — Construction and reception of the photovoltaic installation. 3 — Construction of low voltage — connect network to KSE d.4 — Project management and promotion (English)
    0 references

    Identifiers

    RPLD.04.01.02-10-0043/16
    0 references