A modern University of Arts. (Q132886): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 11:28, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | A modern University of Arts. |
Project in Poland financed by DG Regio |
Statements
146,700.24 zloty
0 references
172,588.52 zloty
0 references
85.0 percent
0 references
28 June 2018
0 references
30 September 2018
0 references
POWIAT NIDZICKI
0 references
ZAKRES RZECZOWY Wyposażenie pracowni w szk. Zawod. (ZSZiO w Nidzicy) prowadzonej przez Pow.Nidzicki w nowoczesny sprzęt i pomoce dydakt.,dostosowane do zdiagnoz. potrzeb pracodawców,w tym: Wyposażenie ogólnodydakt.: Komputery nauczyc. i uczniów,urządz. wielofunkc.,rzutnik, wizualizery, tabl.białe z oprzyrząd.,tabl.interaktywne, Wyposażenie specjalist.(zawod.): Plansze dydaktycz.,dalmierze laser.,lasery krzyżowe,niwelatory z łatą,samochodo.testery diagnostycz., Laptop do diagnostyki auta, oprogramow.:do diagnost. i napraw pojazd.,do serwisu pojazd.,do tworzenia kosztorys.i do tworz. harmonogramów budowl.,system do nauczania j.obcych zawodowych SPOSÓB WDRAŻANIA Realizacja, koordynacja i monitoring zadań-zespół projektowy (pracown.Starostwa posiadający niezbędne kompeten.i doświadcz.w realizacji projektów, Dyr.Szkoły). Przygotowanie i przeprowadz.postepowań PZP – zespół projekt.i pracownik merytor.ds. zam.publiczn. Planowane postępowania: 1.Dostawa wyposaż.ogólnodydaktycznego 2. Dostawa wyposaż.specjalist. 3. Dostawa syst. do naucz.j.obcych zawodow. 4.Promocja proj. Rozlicz.proj. i sprawy fin.-księgowe-dział księgowy Starostwa, Gł.księgowa.ZSZiO. Biuro proj.będzie prow.w budynku Starostwa. ETAPY REALIZACJI 1. Analizy przedwdroż.i opracowanie dokument. aplikacyjnej (IV-VII.17) 2. Wybór wykonawcy/dostawcy wyposaż.– zamówienie publ.(IV-VII 2018) 3. Dostawa wyposaż.z montaż.(VII-VIII.2018) 4. Prom.projektu (IV-VIII 2018) 5. Rzecz.i finans.zakończenie realiz.proj.(VIII-IX 2018) REALIZACJA ZAŁOŻEŃ SzOOP RPO WiM OP.9 Proj.swoim zakresem wpisuje się w założ.OP.9 SzOOP, poprzez lepsze dostosow.warunk.kształcenia zawod.do potrzeb ryn.pracy,co przełoży się na: - zainteresowanie tymi form.kształcenia (popraw.atrakcyjności) na ter.Pow.Nidz.; - zwiększ.liczby absolw.ZSZiO w Nidzicy, w tym kontynuuj.naukę dalej; - zwiększenie kwalif.uczniów wchodzących na ryn.pracy,co przełoży się na zmniejsz.odsetka ludn.korzystaj.z pom.społ.i towarzyszący mu spadek bezrob. (Polish)
0 references
Material scope of workshop equipment in the MCS. Zard. (Niedzica) carried out by Po.Niedzice in modern equipment and care equipment, adapted to the needs of the employers, including: General accessories: Teaching computers and students, designed., projector, visualisera, tapbl.white, with apparatus., tapis.interactive, fit for specialisation. (zard.): Didactic planners., rangefinders, peer lasers, patch boards, vehicle diagnostics, vehicle diagnostics, automobile testers, vehicle diagnostics, automobile inspection and repair equipment., vehicle repair and repair, vehicle service., for the creation of costings and to the construction schedules. construction schedules, professional training system for completion, coordination and performance monitoring of the project team (ageing workers with the necessary competence and experienced in the implementation of projects, Doura). Preparation and removal of the PHP — Project Team and meritotor of the Public Procurement Officer. Planned proceedings: 1.Upstream equipment 2. The supply of equipment for the supply of specialist capital 3. The supply of other professional services. 4.Promote proj. Clearance and accounting services by the accounting officer for the Starostwa, Gol.accounts. The support office will be presented in the Starostwa Building. STEPS IN THE IMPLEMENTATION OF THE 1. Pre-implementation analysis and document development (IV-VII.17) 2. Selection of contractor/supplier — procurement — contract public (IV-VII 2018) 3. Delivery of fitting. (VII-VIII.2018) 4. Prodemo (IV-VIII 2018) 5. Completion of the implementing measure. (VIII — 2018) The scope of the ROP WiM OP.9 — The scope of the Programme is to be found in the OPOOP.9. of the OOP, by improving the conditions of education and training, which will translate into: The interest in these forms of education (attractiveness) on the ground. The increase in the number of years higher than those of Niedzica, including the continuation of education; An increase in the eligibility of the pupils entering the labour market, resulting in a reduced proportion of the population. (English)
0 references
Identifiers
RPWM.09.03.01-28-0007/17
0 references