Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 11:16, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Water and wastewater management in the area of Rybino agglomeration
Project in Poland financed by DG Regio

    Statements

    0 references
    1,268,863.18 zloty
    0 references
    304,527.16319999995 Euro
    13 January 2020
    0 references
    1,836,119.66 zloty
    0 references
    440,668.71839999995 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 March 2019
    0 references
    30 September 2020
    0 references
    GMINA RYBNO
    0 references

    53°23'0.6"N, 19°55'45.1"E
    0 references
    W ramach projektu zostaną podjęte działania obejmujące: budowę kanalizacji sanitarnej (oraz wodociągowej) na obszarze aglomeracji Rybno oraz modernizację sieciowych przepompowni ścieków. Zaplanowano wykonanie następujących prac: -budowa kanalizacji sanitarnej z rurociągiem grawitacyjnym z rur PP, DN 200, studnie sieciowe O800 14 szt. – ogółem ok. 300 m sieci; -budowa sieci wodociągowej towarzysząca budowie kanalizacji sanitarnej z rur PVC – ogółem ok. 129 m sieci -przebudowa i modernizacja przepompowni ścieków P1,P2,P3,P4,P5,P6,P7,P8 (wymiana komór na polimerobetonowe; montaż: nowych pomp, nowych pokryw pompowni z włazem ze stali nierdzewnej, nowych szaf sterowniczych wraz z monitoringiem; oczyszczenie istniejących ogrodzeń wraz z malowaniem; montaż lamp oświetleniowych; fundamenty pod żurawie; utwardzenie pompowni i dojazdów (kostka brukowa); obiegi płuczące do zmieszania nieczystości płynnych; sygnalizacja świetlna i dźwiękowa). Produkty projektu to: 1.Sieć kanalizacji sanitarnej o dł. 0,3 km. 2.Sieć wodociągowa o dł. 0,129 km. 3.Zmodernizowane przepompownie ścieków 8 szt. Interesariusze projektu: 4328 mieszkańców aglomeracji Rybno (4299 obecnie korzystających i 29 planowanych do podłączenia) oraz Zakład Przetwórstwa Mięsnego (w ilości ścieków równej 311 RLM). W przeliczeniu na RLM: 4299 osób + 311 RLM przemysłu = 4610 RLM oraz 29 osób planowanych do podłączenia w 2021 r., łącznie 4639 RLM. Ponadto 11 osób zostanie podłączonych do sieci wodociągowej. Projekt kwalifikuje się do dofinansowania zgodnie z założeniami opisanymi w SZOOP jako typ projektu: •budowa i modernizacja systemów kanalizacji sanitarnej (...), •budowa i modernizacja systemów zaopatrzenia w wodę (sieci wodociągowe, ujęcia), (...). Realizacja 1. celu cząstkowego projektu (zapewnienie mieszkańcom aglomeracji Rybno odbioru ścieków za pośrednictwem sieci kanalizacji sanitarnej) przyczyni się do osiągnięcia celu szczegółowego z SZOOP.: „Więcej oczyszczonych ścieków i lepsza jakość wody”. (Polish)
    0 references
    Within the framework of the project, action will be taken to: construction of the sanitary sewage system (and water) in the area of Rybino agglomeration and the modernisation of the network pumping stations. The following works are planned: Construction of sanitary sewage system with gravity pipeline from PP pipes, DN 200, network wells O800 14. — total ca. 300 m networks; Construction of water mains associated with the construction of a sanitary sewerage system from PVC pipes — total ca. 129 m network — reconstruction and upgrading of pumping stations P1, P2, P3, P4, P5, P6, P7, P8 (replacement of chambers on concrete polymers; mounting: new pumps, new covers of stainless steel burglaries, new control cabinets with monitoring; cleaning up the existing fencing with painting; fitting of lighting lamps; cranberry foundations; pumping of pumping stations and travel (brut cube); rinsing fluids to mix non-purity liquid; traffic lights and sound signals). The products of the project are: 1.Length of sanitary sewerage network 0.3 km. 2.Length water supply network 0.129 km. 3.wastewater pumping stations 8 Project stakeholders: 4328 inhabitants of the agglomerations of Rybno (4299 who are today and 29 for connection) and Zakład Przetwórstwa Mięsnego (311 p.e.). Expressed as p.e.: 4299 persons + 311 p.e. of industry = 4610 p.e. and 29 persons planned to be connected in 2021, in total 4639 p.e.. In addition, 11 people will be connected to the water supply network. The project is eligible for funding in line with the assumptions described in the SZOOP as a type of project: • construction and modernisation of sanitary sewerage systems (...)• construction and modernisation of water supply systems (water supply, intake), (...). The implementation of the 1th sub-target of the project (providing waste water to the inhabitants of the agglomerations of Rybnik for waste water through the sanitary sewage system) will contribute to the achievement of the specific objective of the SZOOP. More treated waste water and better water quality. (English)
    0 references

    Identifiers

    RPWM.05.02.00-28-0002/19