Construction of a tram line to Vilnius with the purchase of rolling stock and associated infrastructure. (Q86080): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: Cohesion Fund / rank | |||
Normal rank |
Revision as of 11:03, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a tram line to Vilnius with the purchase of rolling stock and associated infrastructure. |
Project in Poland financed by DG Regio |
Statements
554,638,744.87 zloty
0 references
133,113,298.76879999 Euro
0.24 Euro
13 January 2020
0 references
1,189,989,975.53 zloty
0 references
57.0 percent
0 references
29 January 2014
0 references
31 July 2021
0 references
TRAMWAJE WARSZAWSKIE SP. Z O.O.
0 references
Projekt obejmuje budowę trzech odcinków trasy tramwajowej do Wilanowa. Dwóch odcinków w ciągu ulic Rakowieckiej – Puławskiej – Goworka – Spacerowej – Belwederskiej – Sobieskiego – al. Rzeczpospolitej (wraz z budową odpowiednich terminali czołowych) oraz trzeciego odcinka w ciągu ul. Bitwy Warszawskiej 1920 r. na odcinku od ul. Grójeckiej do Dworca Zachodniego o łącznej długości ok. 11,70 km. Ostateczna długość trasy zostanie ustalona na podstawie opracowanej dokumentacji projektowej. (Polish)
0 references
The project involves the construction of three sections of the tram line to Vilnius.Two sections within the line of Rakowiecka — Pulawy — Govorna — Spacerowa — Belwederska — Sobieski — al.The Republic of Poland (with the construction of the relevant terminals) and the third section on ul.A battle of Warsaw on the section from ul.Grójec to West Denmark, with a total length of ca.11.70 km.The final length of the route will be determined on the basis of the design documentation drawn up. (English)
0 references
Identifiers
POIS.06.01.00-00-0033/16
0 references