“Construction of a biomass boiler in “Łęańska” district heating plant in Krosno. (Q84404): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: Cohesion Fund / rank
 
Normal rank

Revision as of 10:18, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of a biomass boiler in “Łęańska” district heating plant in Krosno.
Project in Poland financed by DG Regio

    Statements

    0 references
    3,321,600.0 zloty
    0 references
    797,184.0 Euro
    13 January 2020
    0 references
    12,463,778.2 zloty
    0 references
    2,991,306.7679999997 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    2 January 2018
    0 references
    31 December 2021
    0 references
    MIEJSKIE PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ - KROŚNIEŃSKI HOLDING KOMUNALNY SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Przedsięwzięcie zostało zlokalizowane w południowo-wschodnim części Gminy Miasta Krosno na obszarze działki ewidencyjnej numerze 2746/1. Działka jest własnością Gminy Krosno, natomiast MPGK Krosno Sp. z o.o. jest jej użytkownikiem wieczystym. Na tym terenie eksploatowana jest Elektrociepłownia Łężańska należąca do Oddziału Energetyki Cieplnej Miejskiego Przedsiębiorstwa Gospodarki Komunalnej w Krośnie Sp. z o.o. Projekt swoim zakres obejmuje budowę kotła wodnego opalanego biomasą w postaci zrębek leśnych (jako paliwa najbardziej dostępnego) o mocy 7 MW. Nowy kocioł biomasowy planowany do realizacji w ramach Przedsięwzięcia zainstalowany będzie na terenie istniejącej kotłowni w hali kotłów węglowych. Zważywszy na fakt, iż nie przewiduje się zwiększenia całkowitej produkcji ciepła w Elektrociepłowni ''Łężańska'', nie przewiduje się również rozbudowy instalacji przygotowania wody sieciowej, odgazowywaczy, przepompowni itp. Nowy kocioł zostanie wpięty do istniejącego systemu równolegle do istniejących kotłów węglowych, co umożliwi zarówno jego samodzielną pracę jak i wspólnie z dowolnym z kotłów. Kocioł na biomasę posiadać będzie odrębną instalację oczyszczania i wyprowadzenia spalin. Przyłącze instalacji odnawialnego źródła energii do sieci zostanie dokonane zgodnie z przepisami ustawy z dnia 10 kwietnia 1997 r. - Prawo energetyczne (Dz. U. z 2012r. poz. 1059, z późn. zm.). Sprawność produkcji ciepła w kotle biomasowym wynosić będzie powyżej 85%. Przedsięwzięcie obejmuje wykonanie: a) kotła wodnego na biomasę o mocy w cieple 7 MWth ; b) układów oczyszczania spalin: bateria cyklonów (opcjonalnie), elektrofiltr, alternatywnie filtr tkaninowy oraz komina o wysokości 30 m.; c) przenośników zasilających kocioł; d) niezbędnych towarzyszących prac budowlanych, związanych z dostosowaniem istniejącej hali do zabudowy nowego kotła wraz z adaptacją istniejących fundamentów pod nowy kocioł i instalację oczyszczania spalin. (Polish)
    0 references
    The project was located in the south-eastern part of Krosno City Council in the area of the cadastral parcel No 2746/1.The parcel is owned by the municipality of Krosno and MPGK Krosno Sp. z o.o. is a perpetual usufructuary.In this area it is operated by Elektrociepłownia Łęańska, which is owned by the Thermal Energy Division of the Municipal Thermal Management Company in Krosno Sp. z o.o., and the project covers the construction of a biomass-fired water boiler in the form of forestry (as the most accessible fuel) with a capacity of 7 MW.The new biomass boiler planned to be carried out within the Undertaking will be installed in the area of the existing boiler in a coal-fired boiler hall.In view of the fact that the total heat production of the ‘Łęańska’ is not expected to be increased, there is no provision for the development of installations for the preparation of network water, gas-switching facilities, pumping stations, etc.The new boiler will be up to the existing system in parallel to the existing coal boilers, which will allow both to work in its own right and in conjunction with any of the boilers.The biomass boiler will have a separate after-treatment and exhaust after-treatment installation.The connection of the installation of the renewable energy source to the grid will be carried out in accordance with the Energy Law Act of 10 April 1997 (Dz.Journal of Laws 2012, item1059, as amended).The efficiency of heat production in a biomass boiler will be above 85 %.The project shall consist of the execution of:a biomass boiler with a heat capacity of 7 MWth;exhaust after-treatment systems:a cycle battery (optional), an electrostatic precipitator, alternatively a fabric filter and a stack of 30 m height.boiler conveyors;the necessary accompanying construction works, linked to the adaptation of the existing facility to the building of the new boiler, including the adaptation of the existing foundations under the new boiler and the after-treatment system. (English)
    0 references

    Identifiers

    POIS.01.01.01-00-0022/17
    0 references