Thermal refurbishment of a building group building at Dąbnica, Rzązawa municipality (Q112222): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 07:15, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal refurbishment of a building group building at Dąbnica, Rzązawa municipality |
Project in Poland financed by DG Regio |
Statements
316,618.86 zloty
0 references
533,068.05 zloty
0 references
60.0 percent
0 references
1 February 2017
0 references
15 December 2017
0 references
GMINA RZEZAWA
0 references
Przedmiotem projektu jest termomodernizacja budynku Zespołu Szkół w Dąbrówce. Obiekt jest zlokalizowany w woj, mał., pow. bocheń., gminie Rzezawa, m. Dąbrówka. Dotychczas opracowano audyt energetyczny, dokumentację techniczną i studium wykonalności. Roboty budowlane nie zostały rozpoczęte. Inwestycja jest przygotowana do realizacji a Wnioskodawca posiada zezwolenie na jej realizację. Projekt stanowi samodzielną jednostkę analizy i obejmuje wszystkie zadania inwestycyjne niezbędne do zapewnienia funkcjonalności i operacyjności infrastruktury zaraz po zakończeniu realizacji zakresu rzeczowego. Dla uruchomienia produktów projektu nie jest wymagana realizacja dodatkowych zadań inwestycyjnych nieuwzględnionych w zakresie rzeczowym. Projekt obejmuje jedno zadanie: Zadanie nr 1 – Termomodernizacja budynku Zespołu Szkół w Dąbrówce. Przyjęte w ramach projektu rozwiązania techniczne, tj.: docieplenie ścian zewnętrznych (SC_ZEW); docieplenie stropu nad ostatnia kondygnacją (STROP_NOK); wymiana okien na energooszczędne o współczynniku U nie większym niż 0,9 [W/m2 K]; wymiana drzwi zewnętrznych na energooszczędne o współczynniku U nie większym niż 1,3 [W/m2 K]; modernizacja c.w.u.; modernizacja instalacji c.o., będą zgodne z normami prawa budowlanego PN-EN ISO oraz Aprobatą Techniczną Instytutu Techniki Budowlanej. Po aktualizacji audytu w trakcie realizacji okazało się, że projekt pozwoli uzyskać oszczędności energi: cieplnej 2 048,60 GJ/rok, tj. 69,62%; zmniejszenie rocznego zużycia energii pierwotnej w budynku 3 349,62 GJ/rok, tj. 70,67%; zmniejszenie rocznego zużycia energii końcowej: 2 049,06 GJ/rok tj. 69,61%. Projekt pozwoli zredukować emisję polutenów do atmosfery: szacowany spadek emisji CO2 wyniesie 114,91 Mg CO2 / rok, tj. 69,62%, a szacowany roczny spadek emisji PM10 1,0241 kgPM10/rok oraz PM2,5 wyniesie 1,0241 kgPM2.5/rok 69,62%. Projekt przedstawia optymalną relację jakości do ceny. Przyjęte rozwiązania odpowiadają na potrzeby i problemy zdiagnozowane w C.1 (Polish)
0 references
The project is a thermo-modernisation of the building group building in DąbEquka. The site is located in Until now, an energy audit, technical documentation and a feasibility study have been developed. The works have not started. The investment is prepared for implementation and the applicant is authorised to do so. The project shall be an independent unit of analysis and shall include all the investment tasks necessary to ensure the functionality and operability of the infrastructure as soon as the realisation of the physical scope of the infrastructure is completed. It is not necessary to carry out additional investment activities that are not included in the substantive scope for the launch of the project. The project involves one of the following tasks: Activity No 1 — Thermomodernisation of the building group building at Dąbnica. Adopted as part of the technical design, i.e.: insulation of external walls (SC_ZEW); upper floors (STROP_NOK); replacing energy efficient windows with a U factor of not more than 0,9 [W/m² K]; the replacement of external doors with energy-efficient ones with a U factor of not more than 1,3 [W/m² K]; modernisation for hot water service; the modernisation of the service provider will be compatible with the standards of building law PN-EN ISO and the technical approval of the Institute of Construction Technology. Once the audit has been updated, it has become apparent that the project will achieve energy savings: 2 048,60 GJ/year, i.e. 69.62 %; reduction of the annual primary energy consumption in the building 3 349,62 GJ/year, i.e. 70.67 %; reducing annual final energy consumption: 2 049,06 GJ/year, i.e. 69.61 %. The project will reduce its emissions to the atmosphere: the estimated decrease in CO2 emissions will be 114,91 Mg CO2/rok, i.e. 69.62 % and the estimated annual reduction for PM10 1,0241 kgPM10/rok and PM2,5 will be 1,0241 kgPM2.5/rok 69.62 %. The project presents the best value for money. Solutions adopted respond to needs and problems diagnosed in C.1 (English)
0 references
Identifiers
RPMP.04.03.02-12-0192/16
0 references