Implementing technology for the production of improved harmonic filters integrated with oil transformers. (Q82298): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 05:57, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Implementing technology for the production of improved harmonic filters integrated with oil transformers.
Project in Poland financed by DG Regio

    Statements

    0 references
    3,074,750.0 zloty
    0 references
    737,940.0 Euro
    13 January 2020
    0 references
    11,499,150.0 zloty
    0 references
    2,759,796.0 Euro
    13 January 2020
    0 references
    35.0 percent
    0 references
    1 October 2018
    0 references
    31 March 2021
    0 references
    ELHAND TRANSFORMATORY SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    Projekt umożliwia wprowadzenie na rynek całkowicie nowych, innowacyjnych produktów powstałych w wyniku przeprowadzonych samodzielnie przez wnioskodawcę prac badawczo-rozwojowych. Nowymi produktami wprowadzonymi na rynek międzynarodowy dzięki realizacji projektu będą filtry harmonicznych zintegrowane z transformatorami olejowymi, zbudowane w oparciu o dławiki rdzeniowe i bezrdzeniowe, przeznaczone do pracy z przekształtnikami wielopulsowymi. Prace badawcze koncentrowały się na optymalizacji konstrukcji i gabarytów oraz optymalizacji doboru elementów pasywnych filtru poprzez eliminację impedancji szeregowej tradycyjnego filtru harmonicznych i zastąpieniu jej impedancją zintegrowanego z filtrem 12-to plusowego transformatora olejowego, stanowiącego nieodłączny element składowy układu napędowego dużej mocy. Na podstawie wyników symulacji obwodowych wykonano wiele obliczeń i kolejnych symulacji elektromagnetycznych oraz termicznych. Pozwoliły one zoptymalizować nowy produkt pod kątem uzyskania znacznie zwiększonej tłumienności wyższych harmonicznych przy jednoczesnym zmniejszeniu zużycia materiałów i potwierdziły zgodność wyników z założeniami projektowymi. Opracowane rozwiązanie stanowi nieopatentowaną wiedzę techniczną i jest własnością naszej firmy. Projekt koncentruje się na dwóch rodzajach działań, dzięki którym zostanie osiągnięty cel projektu: a) przeprowadzenie prac rozwojowych w okresie od 08/2018 do 12/2020, gdzie będą prowadzone prace B+R w zakresie projektowania całej rodziny filtrów harmonicznych zintegrowanych z transformatorami olejowymi; b) zakup środków trwałych, pozwalający na uruchomienie linii produkcyjnej innowacyjnego produktu. Termin realizacji 10/2018 – 03/2021. Zarówno do realizacji projektu, jak i do późniejszego wdrożenia produktu na rynek Wniosk nie musi uzyskać jakich. pozwoleń zezwoleń/koncesji. Wdroż. innow. produktu na rynek nastąpi już w kolej. kw. po zakoń. real. i projektu, tj. II kw. 2021.SA 42799(2015/X), art. 13 rozp.651/2014. (Polish)
    0 references
    The project makes it possible to place on the market entirely new innovative products resulting from the research and development carried out independently by the applicant.The new products placed on the international market through the implementation of the project will be harmonic filters integrated with the oil transformers, which are built on spinal and core reactors, and are designed to work with multipulse converters.The focus of research has been on optimising the design and size and optimising the elements of the passive filter elements by removing the serial data impedance of the traditional harmonics filter and replaced it by an integrated device with a 12-to plugin with an oil transformer as an integral part of the high power transmission system.Many calculations and subsequent electromagnetic and thermal simulations have been performed based on the results of the circumferential simulation.These have allowed to optimise the new product for significantly increased attenuation of higher harmonics while reducing material consumption and confirming the conformity of the results with design assumptions.The solution developed is unpatented technical knowledge and is owned by our company.The project focuses on two types of action to achieve the aim of the project:a) development work over the period from 08/2018 to 12/2020, where R & D work on the design of the entire family of harmonic filters integrated with oil transformers will be carried out;purchase of fixed assets to allow the production of an innovative production line for the product.Deadline 10/2018 03/2021.Both the project and the subsequent implementation of the product on the market do not have to obtain any authorisation/licence.The product will be placed on the market in the next quarter of the year.2nd quarter2021.SA 42799 (2015/X), Article 13 rozp.651/2014. (English)
    0 references

    Identifiers

    POIR.03.02.01-24-0007/18
    0 references