Supporting low-carbon strategies in the City and Municipality of Szamotuły through the construction of the Integrated Interchange Node in Szamotuła, Memorial and Baborik together with infrastructure. (Q134929): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed label, description and/or aliases in lv, it, da, sk, lt, ro, sl, pt, fi, sv, de, hr, fr, et, hu, bg, el, mt, nl, cs, es, ga, and other parts)
label / frlabel / fr
Soutenir les stratégies à faibles émissions de carbone dans la zone de la ville et de la municipalité de Szamotuły par la construction du nœud de transport intégré à Szamotuła, Pamiątków et Babortok, ainsi que des infrastructures.
Soutenir des stratégies sobres en carbone dans la zone de la ville et de la commune de Szamotuła par la construction d’un nœud de transition intégré à Szamotuły, Souvenirs et Baborówek, ainsi que des infrastructures.
label / delabel / de
Unterstützung kohlenstoffarmer Strategien im Bereich der Stadt und Gemeinde Szamotuły durch den Bau des Integrierten Transmissionsknotens in Szamotuła, Pamiątków und Babortok sowie Infrastruktur.
Unterstützung kohlenstoffarmer Strategien im Bereich der Stadt Szamotuła und der Kommune durch den Bau eines integrierten Übergangsknotens in Szamotuły, Souvenirs und Baborówek sowie Infrastruktur.
label / nllabel / nl
Ondersteuning van koolstofarme strategieën in het gebied van de stad en de gemeente Szamotuły door de bouw van het geïntegreerde transmissieknooppunt in Szamotuła, Pamiątków en Babortok, samen met infrastructuur.
Ondersteuning van koolstofarme strategieën op het gebied van stad en gemeente Szamotuła door de bouw van een geïntegreerd overgangsknooppunt in Szamotuły, Souvenirs en Baborówek, samen met infrastructuur.
label / itlabel / it
Sostenere strategie a basse emissioni di carbonio nella zona della città e del comune di Szamotuły attraverso la costruzione del nodo integrato di trasmissione a Szamotuła, Pamiątków e Babortok insieme alle infrastrutture.
Sostenere strategie a basse emissioni di carbonio nell'area della città di Szamotuła e del comune attraverso la costruzione di un nodo di transizione integrato a Szamotuły, Souvenirs e Baborówek insieme alle infrastrutture.
label / eslabel / es
Apoyar estrategias hipocarbónicas en el área de la ciudad y el municipio de Szamotuły mediante la construcción del Nodo de Transmisión Integrado en Szamotuła, Pamiątków y Babortok, junto con la infraestructura.
Apoyar estrategias hipocarbónicas en el área de la ciudad y la comuna de Szamotuła a través de la construcción de un Nodo de Transición Integrado en Szamotuły, Souvenirs y Baborówek junto con la infraestructura.
label / dalabel / da
Støtte lavemissionsstrategier i byen og kommunen SzamotuÅy gennem opførelsen af det integrerede knudepunkt i SzamotuÅa, Memorial og Baborik sammen med infrastruktur.
Støtte til lavemissionsstrategier i by- og kommuneområdet Szamotuła gennem opførelse af et integreret overgangsknudepunkt i Szamotuły, Souvenirs og Baborówek sammen med infrastruktur.
label / ellabel / el
Στήριξη στρατηγικών χαμηλών εκπομπών διοξειδίου του άνθρακα στην πόλη και τον δήμο SzamotuÅy μέσω της κατασκευής του ολοκληρωμένου κόμβου ανταλλαγής στη SzamotuÅa, Memorial και Baborik μαζί με υποδομές.
Στήριξη στρατηγικών χαμηλών εκπομπών διοξειδίου του άνθρακα στην περιοχή Szamotuła City και Commune μέσω της κατασκευής ενός ολοκληρωμένου κόμβου μετάβασης στο Szamotuły, στα Souvenirs και στο Baborówek μαζί με υποδομές.
label / hrlabel / hr
Podupiranje niskougljičnih strategija u gradu i općini SzamotuÅy kroz izgradnju Integriranog čvora međurazmjenice u SzamotuÅi, Memorialu i Baboriku zajedno s infrastrukturom.
Podupiranje strategija za niske emisije ugljika u području grada Szamotułe i općine izgradnjom integriranog tranzicijskog čvora u Szamotułyu, Souvenirsu i Baboróweku zajedno s infrastrukturom.
label / rolabel / ro
Sprijinirea strategiilor cu emisii reduse de dioxid de carbon în orașul și municipalitatea SzamotuÅy prin construirea nodului interschimb integrat în SzamotuÅa, Memorial și Baborik, împreună cu infrastructura.
Sprijinirea strategiilor cu emisii scăzute de dioxid de carbon în zona orașului și comunei Szamotuła prin construirea unui nod de tranziție integrată în Szamotuły, Souvenirs și Baborówek, împreună cu infrastructura.
label / sklabel / sk
Podpora nízkouhlíkových stratégií v meste a obci SzamotuÅy prostredníctvom výstavby integrovaného výmenného uzla v Szamotuá, Memoriale a Baboriku spolu s infraštruktúrou.
Podpora nízkouhlíkových stratégií v oblasti mesta Szamotuła a obce prostredníctvom výstavby integrovaného prechodného uzla v Szamotuły, Souvenirs a Baborówek spolu s infraštruktúrou.
label / mtlabel / mt
L-appoġġ ta’ strateġiji b’livell baxx ta’ karbonju fil-Belt u l-Muniċipalità ta’ SzamotuÅy permezz tal-kostruzzjoni ta’ Nodu ta’ Interkambju Integrat f’SzamotuÅa, Memorial u Baborik flimkien mal-infrastruttura.
Appoġġ għal strateġiji b’livell baxx ta’ karbonju fiż-żona tal-Belt u l-Komun ta’ Szamotuła permezz tal-bini ta’ Nodu ta’ Tranżizzjoni Integrata fi Szamotuły, Souvenirs u Baborówek flimkien mal-infrastruttura.
label / ptlabel / pt
Apoiar estratégias hipocarbónicas na cidade e no município de SzamotuÅy através da construção do nó de intercâmbio integrado em SzamotuÅa, Memorial e Baborik, juntamente com infraestruturas.
Apoiar estratégias hipocarbónicas na área da cidade de Szamotuła e da Comuna através da construção de um nó de transição integrado em Szamotuły, Lembranças e Baborówek, juntamente com infraestruturas.
label / filabel / fi
Tuetaan vähähiilisiä strategioita SzamotuÅyn kaupungissa ja kunnassa rakentamalla integroitu siirtosolmu SzamotuÅaan, Memorialiin ja Baborikiin infrastruktuurin kanssa.
Tuetaan vähähiilisiä strategioita Szamotułan kaupungin ja kunnan alueella rakentamalla integroitu siirtymäsolmu Szamotułyyn, matkamuistoihin ja Baborówekiin yhdessä infrastruktuurin kanssa.
label / sllabel / sl
Podpora nizkoogljičnim strategijam v mestu in občini SzamotuÅy z izgradnjo integriranega medfranšiznega vozlišča v Szamotuži, Memorialu in Baboriku skupaj z infrastrukturo.
Podpiranje nizkoogljičnih strategij na območju mesta in občine Szamotuła z izgradnjo integriranega prehodnega vozlišča v Szamotułyju, spominkih in Baboróweku skupaj z infrastrukturo.
label / cslabel / cs
Podpora nízkouhlíkových strategií ve městě a obci SzamotuÅy prostřednictvím výstavby integrovaného mezibankovního uzlu ve SzamotuÅa, Memorial a Baborik spolu s infrastrukturou.
Podpora nízkouhlíkových strategií v oblasti města Szamotuła a obce prostřednictvím výstavby integrovaného přechodového uzlu ve Szamotuły, Souvenirs a Baborówek spolu s infrastrukturou.
label / ltlabel / lt
Remti mažo anglies dioksido kiekio technologijų strategijas Szamotujaus mieste ir savivaldybėje, kartu su infrastruktūra statant integruotą mainų mazgą Szamotujoje, Memoriale ir Baborike.
Remti mažo anglies dioksido kiekio technologijų strategijas Szamotuła miesto ir komunos srityje, tiesiant integruoto perėjimo mazgą Szamotuły, Suuvenirs ir Baborówek mieste, taip pat infrastruktūrą.
label / lvlabel / lv
Atbalstīt zema oglekļa satura stratēģijas SzamotuÅy pilsētā un pašvaldībā, kopā ar infrastruktūru būvējot integrēto apmaiņas mezglu SzamotuÅa, Memorial un Baborik.
Atbalstīt zemu oglekļa emisiju stratēģijas Szamotuła City un komūnā, izveidojot integrētu pārejas mezglu Szamotuły, suvenīros un Baborówek kopā ar infrastruktūru.
label / bglabel / bg
Подкрепа за нисковъглеродни стратегии в града и община SzamotuÅy чрез изграждането на интегрирания възел за обмен в SzamotuÅa, Memorial и Baborik заедно с инфраструктурата.
Подкрепа за нисковъглеродни стратегии в района на град Szamotuła и община чрез изграждането на интегриран преходен възел в Szamotuły, Souvenirs и Baborówek заедно с инфраструктурата.
label / hulabel / hu
Az alacsony szén-dioxid-kibocsátással járó stratégiák támogatása SzamotuÅy városában és településén az Integrált Interchange Node megépítésével SzamotuÅában, Memorialban és Baborikban az infrastruktúrával együtt.
Az alacsony szén-dioxid-kibocsátású stratégiák támogatása Szamotuła város és község területén egy integrált átállási csomópont megépítésével Szamotułyban, ajándéktárgyakban és Baborówekben, valamint infrastruktúrával.
label / galabel / ga
Tacú le straitéisí ísealcharbóin i gCathair agus i Bardas SzamotuÅy tríd an Nód Idirmhalartaithe Comhtháite a thógáil i SzamotuÅa, Memorial agus Baborik mar aon le bonneagar.
Tacú le straitéisí ísealcharbóin i réimse Chathair Szamotuła agus Commune trí Nód Aistrithe Comhtháite a thógáil i Szamotuły, Souvenirs agus Baborówek mar aon le bonneagar.
label / svlabel / sv
Stödja strategier för låga koldioxidutsläpp i staden och kommunen SzamotuÅy genom byggandet av den integrerade växelnoden i SzamotuÅa, Memorial och Baborik tillsammans med infrastruktur.
Stödja koldioxidsnåla strategier i området Szamotuła stad och kommun genom att bygga en integrerad övergångsnod i Szamotuły, Souvenirs och Baborówek tillsammans med infrastruktur.
label / etlabel / et
Vähese CO2-heitega strateegiate toetamine SzamotuÅy linnas ja omavalitsuses, ehitades koos taristuga SzamotuÅas, Memorialis ja Baborikis integreeritud vahetussõlme.
Vähese CO2-heitega strateegiate toetamine Szamotuła linna ja kommuuni piirkonnas integreeritud üleminekusõlme ehitamise kaudu Szamotułys, suveniirites ja Baborówekis koos taristuga.
Property / summaryProperty / summary
Proj.realizo. fera partie de 5 tâches et comprendra la construction de 3 nœuds de transfert intégrés (ZWP) à partir de infrastrukturą:1.Budowa ZWP à Szamotuła (travaux de préparation et de démolition, surfaces de la zone frontalière, bus de la baie, wafer, dr.manewr.-1 056 m², parking Pamp;R(83msc dont 2pour p.m. partiel-1 047,5 m²), Bamp;R(60msc), reconstruction du réseau d’assainissement pluie.,entrées, routes cyclables.-500 m², trottoirs-674 m², éclairage-8pcs.,passenger inf. panneau-1pcs., mondes de bicyclettes, arrêts d’autobus, planches.conduite, carte stylographique de la station, tableaux de guidage, inventaire et projet vert, finition des travaux, supervision de la construction).2.Construction de ZWP à Pamiątków(Rob.préparation et démolition, surface de béton,dr. accès-840 m²,Pampe de stationnement;R(21seat-345 m²),Ramp;R20m), Pro.avec zone de drainage, routes cyclables.-412,5 m², promenade-43,75 m², marche-ride-train-1 006,5 m², éclairage-1pcs,inf.passage board, world bike., arrêt de bus.,tabl.departures, carte stylographique de la station, plaques de guidage, inventaire et projection verte, finition des robots. pro. avec zone de déshydratation, vélo de route-1 155 m², promenades, éclairage-1pcs, inf.passenger board, monde de vélos, arrêt de bus., table dépliant. voyages, carte typographique de la station, plaques de guidage, inventaire et projection verte, finition des travaux.)4.Achat de vélos de ville avec équipement,5.Promotion et produits d’informationProj.(année de réalisation-2018)•Construit en lb. ZWP-3pcs •Lb construction d’objets "park and drive" -3 pcs •Lb places de stationnement dans des objets construits "park and drive" -115pcs.•Lb places de stationnement pour les personnes sous-préparées dans des objets construits "park and drive"-4pcs •Lb d’objets Bikeamp construits; ride"-3pcs •Lb s’arrête dans "Bikeamp;Ride" construit — 100pcs •Pour l’infrastructure supportée du vélo — 1,01 km•Lb actions et campagnes de promotion-1pcs•Lb nouveau/moder.points de lumière-10pcs. (French)
Proj.realizo. fera partie de 5 tâches et comprendra la construction de 3 échangeurs intégrés (ZWP) de infrastrukturą:1.Budowa ZWP à Szamotuły (ouvrages de préparation et de démolition, surfaces de K.granitowa, bus de baie.,paski,dr.manewr.-1 056 m², parcs Pamp;R(83msc dont 2pour handicaps-1 047,5 m²), Bamp;R(60msc), reconstruction du réseau de canaux de pluie., entrées, routes cyclables.-500 m², trottoirs-674 m², éclairage-8pcs,passager inf.-1pc., mondes de vélo, arrêt de bus, tableaux de bord, plantif de la station, plaques de plomb, greens d’inventaire et de projection, finition robots., supervision de construction).2.Construction du ZWP à Souvenir (Rob.prépared. et démolition,surfaces en béton,dr. drive-840 m², Pamp;R parcs(21 places-345 m²),Bamp;R(20msc), Proj.avec zone de déshydratation, vélo de route.-412,5 m², allée-43,75 m², promenade-voyage-1 006,5 m², éclairage-1 pcs, planche inf.passage.,vélo du monde., arrêt de bus.,tabl.départements, plantif de la station, plaques guides, inventaire et projection, finition des travaux.)3.Bâtiment ZPW à Baborówk (Préparation et démolition, 888 m², stationnement:Pamp;R(11cms, y compris 2pour handicapés-147,5 m²),Bamp;R(20msc),proj.avec déshydratation de la zone, vélo de route-1 155 m², trottoirs, éclairage-1 pc,inf.passenger, monde du vélo, arrêt de bus.,table.detours, cartetiflographique de la gare, planches de guidage, inventaire et projet vert, finition robots.)4.Achat de vélos de ville avec équipement,5.Journal promotionnel et d’informationProduits (année de réalisation-2018)•Lb construction. ZWP-3pcs.•Lb installations ‘park and drive’–3 pcs.•Lb places de stationnement dans les installations construites ‘parc et conduite’–15pcs.•Lb places de stationnement pour personnes handicapées dans les installations construites ‘parc et voiture’-4pcs.•Lb des installations construites ‘Bikeamp; ride"-3pcs•Lb se trouve dans les installations construites’Bikeamp;Ride’–100pcs.•Long support infrastructure.- 1,01 km•Lb actions et campagnes de promotion-1pcs•Lb new/moder. light points-10pcs. (French)
Property / summaryProperty / summary
Proj.realizo. wird Teil von 5 Aufgaben sein und umfasst den Bau von 3 integrierten Transferknoten (ZWP) von infrastrukturą:1.Budowa ZWP in Szamotuła (Vorbereitungs- und Abbrucharbeiten, Oberflächen aus dem Grenzgebiet, Buchtbus., Wafer, dr.manewr.-1 056 m², Parkplatz Pamp;R(83 msc einschließlich 2für partielles pm-1 047,5 m²), Bamp;R(60msc), Rekonstruktion des Kanalisationsnetzes Regen.,Eingänge, Fahrradstraßen.-500 m², Gehwege-674 m², Beleuchtung-8pcs., Passagier inf. Panel-1pcs.,Fahrradwelten, Bushaltestellen,boards.driving,tyflographische Karte der Station,Leittafeln, Inventar und Projekt grün, Bauausführung, Bauaufsicht).2.Bau von ZWP in Pamiątków(Rob.Präparation und Abriss, Oberfläche aus Beton, Zugang-840 m², Parken Pamp;R(21seat-345 m²), Bamp; R(20msc), pro.mit Drainagebereich, Fahrradstraßen.-412,5 m², Gehweg-43,75 m², Geh-Fahrt-Bahn-1 006,5 m², Beleuchtung-1pcs,inf.passage Board, Weltfahrrad., Bushaltestelle.,tabl.departures,tyflographische Karte der Station, Führungsplatten, Inventar und grüne Projektion, Roboter Finish.)3.Bau von ZPW in Babork(Rob.Vorbereitung und Abriss, Oberflächen aus Beton, Weg Manöver.-888 m²,Parkingi:Pamp;R(11msc, einschließlich 2für Teil-pr.-147,5 m²), Bamp; R(20msc), Pro. mit Dehydrationsbereich, Rennrad-1 155 m², Gehwege, Beleuchtung-1pcs, Inf.passenger Board, Fahrradwelt, Bushaltestelle., Tisch entfalten. Reisen, typographische Karte der Station, Führerplatten, Inventar und grüne Projektion, Ausführung.)4.Kauf von Stadtfahrrädern mit Ausrüstung,5.Förder- und InformationsprodukteProj.(Jahr der Leistung-2018)•Lb Bau. ZWP-3pcs •Lb Bau von "Park-und Laufwerk"-Objekten -3 Stück •Lb-Stellplätze in gebauten Objekten "Park und Antrieb" -115pcs.•Lb Parkplätze für Personen, die in gebauten Objekten "park and drive"-4pcs unterbereitet sind •Lb von gebauten Bikeamp-Objekten; Fahrt"-3pcs •Lb stoppt in gebauten "Bikeamp;Ride" – 100pcs •Für die unterstützte Infrastruktur des Fahrrads – 1,01 km•Lb Aktionen und Werbekampagnen-1pcs•Lb neu/moder.Punkte von Licht-10pcs. (German)
Proj.realizo. wird Teil von 5 Aufgaben sein und umfasst den Bau von 3 integrierten Austauschstellen (ZWP)von infrastrukturą:1.Budowa ZWP in Szamotuły (Vor- und Abbrucharbeiten, Oberflächen von K.granitowa, Buchtbus.,paski,dr.manewr.-1 056 m², Parks Pamp;R(83msc einschließlich 2für Handicap-1 047,5 m²), Bamp;R(60msc), Rekonstruktion des Regenkanalnetzes.,Einrichtungen, Fahrradstraßen.-500 m², Gehwege-674 m², Beleuchtung-8pcs,Fahrgast-Inf.-1pc.,Fahrradwelten, Bushaltestelle,tabl. Armaturenbretter,tiflographische Karte der Station, Bleiplatten, Inventar und Projektionsgrün, Roboter Finish., Bauüberwachung).2.Bau der ZWP in Souvenir (Rob. vorbereitet. und Abbruch, Oberflächen aus Beton,Trockenantrieb-840 m², Pamp;R Parks(21 Plätze-345 m²),Bamp; R(20mscsc), proj.mit Dehydrationsfläche, Rennrad.-412,5 m², Gehweg-43,75 m², Gehweg-1 006,5 m², Beleuchtung-1pcs, Board inf.passage.,world bike.,bus stop.,tabl.departments,tiflographische Karte der Station, Führungsplatten, Inventar und Projektion, Arbeitsende.)3.Bauen ZPW in Baborówk(Rob.Vorbereitung und Abbruch, 888 m², Parken:Pamp;R(11msc, einschließlich 2für Behinderte-147,5 m²),Bamp; R(20msc), Proj.mit Dehydrierung der Gegend, Straßenfahrrad-1 155 m², Gehwege, Beleuchtung-1pc,inf.Passenger, Fahrradwelt, Bushaltestelle.,table.detours,tiflographische Karte des Bahnhofs, Führung Bretter, Inventar und Projekt grün, Roboter Finish.)4.Kauf von Stadtfahrrädern mit Ausrüstung,5.Werbe- und InformationszeitschriftProdukte(Jahr der Leistung-2018)•Lb-Bau. ZWP-3 Stk.•Lb Einrichtungen‚Park und Antrieb‘–3 Stk.•Lb Parkplätze in den gebauten Einrichtungen‚Park und Antrieb‘–15 Stk.•Lb Parkplätze für Behinderte in den gebauten Einrichtungen‚Park und Antrieb‘–4pcs•Lb der gebauten Einrichtungen„Bikeamp; Ride“ – 3pcs•Lb steht in den gebauten Einrichtungen‚Bikeamp;Ride‘–100pcs•Long unterstützte Infrastruktur.- 1,01 km•Lb Aktionen und Werbekampagnen-1pcs•Lb neu/moder Lichtpunkte-10 Stk. (German)
Property / summaryProperty / summary
Proj.realizo. maakt deel uit van 5 taken en omvat de bouw van 3 geïntegreerde overdrachtsknooppunten (ZWP) van infrastrukturą:1.Budowa ZWP in Szamotuła (voorbereidings- en sloopwerkzaamheden, oppervlakken van het grensgebied, baaibus., wafer, dr.manewr.-1 056 m², Parking Pamp;R(83msc inclusief 2voor gedeeltelijke pm-1 047,5 m²), Bamp;R(60msc), wederopbouw van het rioleringsnetwerk regen., ingangen, fietswegen.-500 m², wandelingen-674 m², verlichting-8pcs., passagier inf. paneel-1pcs., fietswerelden, bushaltes,boards.driving,tyflografische kaart van het station, geleidende borden,inventaris en project groen, werken afwerking, bouwtoezicht).2.Bouw van ZWP in Pamiątków (Rob.preparation en sloop, oppervlakte van beton, dr. toegang-840 m², parkeren Pamp;R(21seat-345 m²),Bamp;R(20 m),sc, Pro.with drainage gebied, fietswegen.-412,5 m², lopen-43,75 m², lopen-ride-trein-1 006,5 m², verlichting-1pcs, inf.passage board, wereld fiets., bushalte.,tabl.departures,tyflografische kaart van het station, gids platen, inventaris en groene projectie, robots afwerking.)3.Bouw van ZPW in Babork (Rob.preparation en sloop, oppervlakken van beton, wegmanoeuvre.-888 m²,Parkingi:Pamp;R(11msc, inclusief 2voor part-pr.-147,5 m²),Bamp;R(20msc), Pro. met uitdroging gebied, racefiets-1 155 m², wandelingen, verlichting-1pcs,inf.passagiers board, fietswereld, bushalte., tafel ontvouwen. reizen, typografische kaart van het station, gids platen, inventaris en groene projectie, werken afwerking.)4.Aankoop van stadsfietsen met apparatuur,5. Promotie en informatie productenProj. (jaar van prestatie-2018)•Lb bouw. ZWP-3pcs •Lb bouw van "park and drive" objecten -3 stuks •Lb parkeerplaatsen in gebouwde objecten "park and drive" -115pcs.•Lb parkeerplaatsen voor personen onder-voorbereid in gebouwde objecten "park en drive"-4pcs •Lb gebouwde Bikeamp objecten; rit"-3pcs •Lb stopt in gebouwde "Bikeamp;Ride" — 100pcs •Voor de ondersteunde infrastructuur van de fiets — 1,01 km•Lb acties en promotiecampagnes-1pcs•Lb nieuwe/moder.points van licht-10pcs. (Dutch)
Proj.realizo. zal deel uitmaken van 5 taken en omvat de bouw van 3 geïntegreerde wisselingen (ZWP)van infrastrukturą:1.Budowa ZWP in Szamotuły(Voorbereiding en sloopwerkzaamheden, oppervlakken van K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parken Pamp;R(83msc inclusief 2for handicaps-1 047,5 m²), Bamp;R(60msc), reconstructie van het regenkanaal netwerk.,entries,bike wegen.-500 m², trottoirs-674 m², verlichting-8pcs, passagiers inf.-1pc.,bike werelden, bushalte, tabl. dashboards,tiflografische kaart van het station, loodplaten, inventaris en projectie greens, robots afwerking., bouw supervisie).2.Bouw van de ZWP in Souvenir (Rob.prepared. en demolition, oppervlaktes gemaakt van beton, dr. rijden-840 m², Pamp;R parken(21 plaatsen-345 m²),Bamp;R(20 m), oppervlakten gemaakt van beton, rijden-840 m², Pamp;R parken(21 plaatsen-345 m²),Bamp;R(20 m), Proj.with uitdroging gebied, racefiets.-412,5 m², walkway-43,75 m², walking-travel-1 006,5 m², verlichting-1 stks, board inf.passage.,world bike.,bus stop.,tabl.departments,tiflografische kaart van het station, gidsplaten, inventaris en projectie, werken afwerking.)3.Building ZPW in Baborówk(Rob.preparation and smolition, 888 m², parkeren:Pamp;R(11msc, inclusief 2for gehandicapten-147,5 m²), Bamp;R(20msc), Proj.with uitdroging van het gebied, racefiets-1 155 m², trottoirs, verlichting-1pc, inf.passagiers, fietswereld, bushalte.,table.detours,tiflografische kaart van het station, begeleidingsborden, inventaris en projectgroen, robots eindigen.)4.Aankoop van stadsfietsen met apparatuur,5.Promotioneel en informatiedagboekProducten (jaar van prestatie-2018)•Lb-bouw. ZWP-3pcs.•Lb-parkeerplaatsen voor gehandicapten in de gebouwde faciliteiten „park en drive”–4pcs.•Lb van de gebouwde faciliteiten„Bikeamp; ride”–3pcs•Lb staat in de gebouwde faciliteiten„Bikeamp;Ride”–100pcs.•Lb ondersteunde infrastructuur. fiets.- 1,01 km•Lb acties en promotiecampagnes-1pcs•Lb nieuw/moder. lichtpunten-10 st. (Dutch)
Property / summaryProperty / summary
Proj.realizo. farà parte di 5 compiti e comprenderà la costruzione di 3 nodi di trasferimento integrati (ZWP) da infrastrukturą:1.Budowa ZWP a Szamotuła (lavori di preparazione e demolizione, superfici dalla zona di confine, autobus di baia., wafer, dr.manewr.-1 056 m², parcheggio Pamp; R(83msc di cui 2per parziale pm-1 047,5 m²), Bamp; R (60msc), ricostruzione della rete fognaria pioggia., ingressi, piste ciclabili.-500 m², passeggiate-674 m², illuminazione-8pcs.,passeggeri inf. pannello-1pcs., mondi di bicicletta, fermate degli autobus, boards.driving, mappa tiflografica della stazione, tavole guida, inventario e progetto verde, finitura lavori, supervisione della costruzione).2.Costruzione di ZWP a Pamiątków (Rob.preparazione e demolizione, superficie dal calcestruzzo, dr. accesso-840 m²,parcheggio Pamp;R(21seat-345 m²), Bamp; R (20msc), pro.with area di drenaggio, piste ciclabili.-412,5 m², passeggiata-43,75 m², marciapiede-treno-1 006,5 m², illuminazione-1pcs,inf.passage board, moto del mondo., fermata dell'autobus.,tabl.departures, mappa tiflografica della stazione, targhe di guida, inventario e proiezione verde, finitura robot.)3.Costruzione di ZPW a Babork (Rob.preparation e demolition, superfici da calcestruzzo, manovra di via.-888 m²,Parkingi:Pamp;R(11msc, compreso 2 per parte-pr.-147,5) Bamp; R (20msc), pro. con area di disidratazione, bici da strada-1 155 m², passeggiate, illuminazione-1pcs, bordo ininf.passenger, mondo della bicicletta, fermata dell'autobus., tavolo disfolding. viaggi, mappa tipografica della stazione, targhe di guida, inventario e proiezione verde, finitura dei lavori.)4.Acquisto di biciclette della città con attrezzature, 5.Promozione e prodotti informativiProj. (anno di realizzazione-2018)•Lb costruzione. ZWP-3pcs •Lb costruzione di oggetti "parco e azionamento" -3 pezzi •Lb posti auto in oggetti costruiti "parco e guida" -115pcs.•Lb posti auto per persone poco preparate in oggetti costruiti "parcheggio e guida"-4pcs •Lb di oggetti Bikeamp costruiti; corsa"-3pcs •Lb si ferma in costruito "Bikeamp;Ride" — 100pcs •Per l'infrastruttura supportata della bicicletta — 1,01 km•Lb azioni e campagne promozionali-1pcs•Lb nuovo/moder.punti di luce-10pcs. (Italian)
Proj.realizo. farà parte di 5 compiti e comprenderà la costruzione di 3 interscambi integrati (ZWP) da infrastrukturą:1.Budowa ZWP a Szamotuły(Lavori di preparazione e demolizione, superfici da K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parchi Pamp;R(83msc di cui 2 per gli handicap-1 047,5 m²), Bamp;R(60msc), ricostruzione della rete del canale della pioggia.,entri, strade ciclabili.-500 m², pavimentazioni-674 m², illuminazione-8 pz,passeggero inf.-1pc.,modi di moto, fermata dell'autobus, cruscotti tabl., cartina tiflografica della stazione,piastre guida,verdi di inventario e proiezione, finitura robot., supervisione della costruzione).2.Costruzione dello ZWP a Souvenir (Rob.prepared. e demolition,superfici in calcestruzzo, azionamento 840 m², Pamp;R parchi(21 posti-345 m²),Bamp;R(20cms), Proj.con area disidratazione, bici da strada.-412,5 m², passerella-43,75 m², viaggio a piedi-1 006,5 m², illuminazione-1 pz, bordo inf.passage.,world bike., fermata bus.,tabl.departments, mappa tiflografica della stazione, targhe guida, inventario e proiezione, finitura lavori.)3.Building ZPW a Baborówk(Rob.preparazione e demolizione, 888 m²,parcheggio:Pamp;R(11msc, inclusi 2 per disabili-147,5 m²),Bamp;R(20msc), Proj.con disidratazione della zona, bici da strada-1 155 m², marciapiedi, illuminazione-1pc,inf.passeggero, mondo della bicicletta, fermata dell'autobus.,table.detours, mappa tiflografica della stazione,piscine guida, inventario e progetto verde, robot finitura.)4.Acquisto di biciclette da città con attrezzature,5.Diario promozionale e informativoProdotti (anno di realizzazione-2018)•Lb costruzione. ZWP-3pcs.•Lb facilities'parcheggio and drive'–3 pz.•Lb parcheggi nelle strutture costruite'parco e guida'–15pcs.•Lb parcheggi per disabili nelle strutture costruite ‘parco e guida'–4pcs.•Lb delle strutture costruite "Bikeamp; ride"–3pcs•Lb si trova nelle strutture costruite "Bikeamp;Ride"–100pcs.•Lb infrastrutture.- 1,01 km•Azioni e campagne promozionali Lb-1pcs•Lb nuovi/moder. punti luce-10pcs. (Italian)
Property / summaryProperty / summary
Proj.realizo. formará parte de 5 tareas e incluirá la construcción de 3 nodos de transferencia integrados (ZWP) desde infrastrukturą:1.Budowa ZWP en Szamotuła (trabajos de preparación y demolición, superficies de la zona fronteriza, bay bus., oblea, dr.manewr.-1 056 m², Parking Pamp; R(83msc incluyendo 2para parcial pm-1 047,5 m²), Bamp; R(60msc), la reconstrucción de la lluvia de la red de alcantarillado., entradas, carreteras de bicicleta.-500 m², paseos-674 m², iluminación-8pcs., pasajeros inf. panel-1pcs., mundos de bicicleta, paradas de autobús,boards.driving,tyflographic map de la estación, tableros guía, inventario y proyecto verde, construcción de ZWP en Pamiątków (Rob.preparación y demolición, superficie desde hormigón,dr. acceso-840 m²,parking Pamp; R(21 asientos-345 m²),Bamp; R(20msc), pro.con área de drenaje, carreteras bici.-412,5 m², caminata-43,75 m², Walking-ride-tren-1 006,5 m², iluminación-1pcs,inf.passage board, world bike., parada de autobús., tabl.departures, mapa tiflográfico de la estación, placas guía, inventario y proyección verde, acabado robots.)3.Construcción de ZPW en Babork (Rob.preparación y demolición, superficies de hormigón, maniobra de carretera.-888 m²,Parkingi:Pamp;R(11msc, incluyendo 2para parte-pr.-147,5 m²), Bamp; R(20msc), pro. con área de deshidratación, bicicleta de carretera-1 155 m², paseos, iluminación-1pcs, tablero de pasajeros inf., mundo de bicicletas, parada de autobús., mesa de despliegue. viajes, mapa tipográfico de la estación, placas de guía, inventario y proyección verde, acabado de obras.)4.Compra de bicicletas de ciudad con equipo, 5.Promoción y productos de informaciónProj.(año de logro-2018)• Construcción de Lb. ZWP-3pcs •Lb construcción de objetos "parque y impulsión" -3 pcs •Lb plazas de aparcamiento en objetos construidos "parque y unidad" -115pcs.•Lb plazas de estacionamiento para personas debajo de la preparación de objetos construidos "parque y unidad"-4pcs •Lb de objetos construidos Bikeamp; paseo"-3pcs •Lb se detiene en "Bikeamp;Ride" — 100pcs •Para la infraestructura soportada de la bicicleta — 1,01 km•Lb acciones y campañas de promoción-1pcs•Lb nuevo/moder.puntos de luz-10pcs. (Spanish)
Proj.realizo. formará parte de 5 tareas e incluirá la construcción de 3 intercambiadores integrados (ZWP) de infrastrukturą:1.Budowa ZWP en Szamotuły(Trabajos de preparación y demolición, superficies de K.granitowa, bay bus., paski,dr.manewr.-1 056 m², parques Pamp;R(83msc incluyendo 2para handicaps-1 047,5 m²), Bamp;R(60msc),reconstrucción de la red de canales de lluvia.,entries,carreteras de bicicletas.-500 m², pavimentos-674 m²,iluminación-8pcs,pasajeros inf.-1pc.,mundos de bicicletas,parada de autobús,tabl. tableros, mapa gráfico de la estación, placas de plomo, invernaderos de inventario y proyección, acabado de robots, supervisión de la construcción).2.Construcción del ZWP en Souvenir (Rob.prepared y demolición, superficies hechas de hormigón, unidad de recorrido-840 m², Pamp;R Parks(21 lugares), 345 m²),reconstrucción de la red de canales de lluvia.,entradas, caminos de bicicletas.-500 m², pavimentos-674 m²,iluminarias, placas de plomo, verdes de proyección e inventario, acabado de robots, supervisión de la construcción).2.Construcción de la ZWP en Souvenir (Rob.prepared y demolición, superficies hechas de hormigón, dirección: 840 m², Pamp;R. Bamp;R(20msc),proj.con área de deshidratación, bicicleta de carretera.-412,5 m², pasarela-43,75 m², paseo-viaje-1 006,5 m², iluminación-1pcs,board inf.passage.,world bike., parada de autobús,tabl.departments, mapa gráfico de la estación, placas de guía, inventario y proyección, acabado de obras.)3.Construir ZPW en Baborówk(Rob.preparation y demolición, 888 m², estacionamiento:Pamp;R(11msc, incluidos 2 incapacitados-147,5 m²), proj. Bamp;R(20msc),proj.con deshidratación de la zona, bicicleta de carretera-1 155 m², pavimentos, iluminación-1pc,inf.passenger, mundo de la bicicleta, parada de autobús.,table.detours, mapa gráfico de la estación, tablas de guía, inventario y proyecto verde, robots acabados.)4.Compra de bicicletas de ciudad con equipo,5.Diario promocional e informativoProductos(año de logro-2018)•Lb construcción. ZWP-3pcs.•Lbpar y conducir’–3 pcs.•Lb plazas de aparcamiento en las instalaciones construidas‘parque y coche’–15pcs.•Lb plazas de aparcamiento para discapacitados en el parque y la conducción de las instalaciones construidas-4pcs.•Lb de las instalaciones construidas‘Bikeamp; ride"–3pcs•Lb se encuentra en las instalaciones construidas‘Bikeamp;Ride’–100pcs.•Infraestructura soportada larga.- 1,01 km•Lb acciones y campañas de promoción-1pcs•Lb nuevo/moder. puntos de luz-10pcs. (Spanish)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Danish)
Proj.realizo. vil være en del af 5 opgaver og vil omfatte opførelse af 3 integrerede udvekslinger (ZWP)fra infrastrukturą:1.Budowa ZWP i Szamotuły (Forberedelses- og nedrivningsarbejder, overflader fra K.granitowa, bugtbus.,paski,dr.manewr.-1 056 m², parker Pamp;R(83msc herunder 2for handicap-1 047,5 m²), Bamp;R(60msc),genopbygning af regnkanalen netværk.,entries, cykelveje.-500 m², fortove-674 m², belysning-8pcs, passager inf.-1pc., cykel verdener,bus stop,tabl. dashboards,tiflografisk kort over stationen, blyplader, fortegnelse og projektion greens, robotter finish.,konstruktion overvågning).2.Konstruktion af ZWP i Souvenir (Rob.prepared. og nedrivning,overflader lavet af beton,dr. drev-840 m², Pamp;R parker(21 steder-345 m²), rekonstruktion af regnkanalen netværk.,entries, cykelveje.-500 m², fortovelser-674 m², fortove-874 m², belysning-8pc, passagerinventar inf.-1pc., cykel verdener, bus stop,tabl. dashboards,tiflografisk kort over stationen, blyplader, fortegnelse og projektion greener, robotter finish., konstruktion overvågning).2.Construktion af ZWP i Souvenir (Rob.forbered. og nedrivning,overflader lavet af beton,dr. drive-840 m², Pamp;R parker(21 steder-345 m²), rekonstruktion af regnkanalen netværk., veje, cykelveje.-500 m², fortoveringer 674 m², fortovering-874 m², belysning 840 m², fortov af ZWP i Souvenir (Rob. forberedt. og nedrivning,overflader lavet af beton,dr. drev-840 m², Pamp;R(21 steder-345 m²), rekonstruktion af regnkanalen netværk.,entries, cykelveje.-veje.-500 m², fortovelser-674 m², belysning-874 m², kørsel 840 m², cykelverdener, cykel-stop, busstoppested, fortov,tiflografisk kort over stationen, blyplader, fortegnelser og projektion greener, robotter finish Bamp;R(20msc), proj. med dehydrering område, vejcykel.-412,5 m², gangbro-43,75 m², gang-rejse-1 006,5 m², belysning-1 stk.,board inf.passage., verden cykel., busstoppested.,tabl.departments,tiflografisk kort over stationen, styreplader, opgørelse og projektion, arbejde finish.)3.Building ZPW i Baborówk (Rob.preparation og nedrivning, 888 m²,parkering:Pamp;R(11msc, herunder 2for handicappede-147,5 m²), proj. Bamp;R(20msc), proj. med dehydrering af området, landevejscykel-1 155 m², fortove, belysning-1pc,inf.passenger, cykel verden, busstoppested.,table.detours,tiflografisk kort over stationen,guiding boards, inventar og projekt grøn, robotter finish.)4.Køb af bycykler med udstyr,5.Promotional og information journalProducts(år for præstation-2018)•Lb konstruktion. ZWP-3pcs.•Lb faciliteter'parkering og kørsel"–3 pcs.•Lb parkeringspladser i den bebyggede faciliteter'park og kørsel"–15pcs.•Lb parkeringspladser for handicappede i bebyggede faciliteter "parkering og kørsel"–4pcs.•Lb af de byggede faciliteter"Bikeamp; ride"–3pcs•Lb står i de byggede faciliteter "Bikeamp;Ride'–100pcs.•Lang understøttet infrastruktur. cykel.- 1,01 km•Lb aktioner og kampagner 1pcs•Lb nye/moderne. lyspunkter-10pcs. (Danish)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Greek)
Το Proj.realizo. θα αποτελεί μέρος 5 εργασιών και θα περιλαμβάνει την κατασκευή 3 ολοκληρωμένων κόμβων (ZWP)από το infrastrukturą:1.Budowa ZWP στο Szamotuły (έργα προετοιμασίας και κατεδάφισης, επιφάνειες από K.granitowa, λεωφορείο κόλπου.,paski,dr.manewr.-1 056 m², πάρκα Pamp;R(83msc συμπεριλαμβανομένων 2 για μειονεκτήματα-1 047,5 m²), Bamp & R (60msc), ανακατασκευή του δικτύου καναλιών βροχής., καταχωρήσεις, δρόμοι ποδηλάτων.-500 m², πεζοδρόμια-674 m², φωτισμός-8pcs, επιβάτες inf.-1pc., κόσμοι ποδηλάτων, στάση λεωφορείου, ταμπλό. ταμπλό, τιφλογραφικός χάρτης του σταθμού, πλάκες μολύβδου, απογραφή και πράσινο προβολής, τα ρομπότ τελειώνουν., επίβλεψη κατασκευής).2.Κατασκευή του ZWP στο σουβενίρ (Rob.prepared. και κατεδάφιση, επιφάνειες φιαγμένα από σκυρόδεμα,dr. drive-840 m², πάρκα Pamp &R (21 θέσεις-345 m²), Bamp &R (20msc),proj.με περιοχή αφυδάτωσης, οδικό ποδήλατο.-412,5 m², διάδρομος-43,75 m², περπάτημα-ταξίδι-1 006,5 m², φωτισμός-1pcs, πίνακας inf.passage., παγκόσμιο ποδήλατο., στάση λεωφορείου.,tabl.departments, τιφλογραφικός χάρτης του σταθμού, πινακίδες οδηγών, κατάλογος και προβολή, τελειώνουν οι εργασίες.)3.Building ZPW στο Baborówk (Rob.preparation και κατεδάφιση, 888 m², πάρκο: Pamp;R (11msc, συμπεριλαμβανομένων 2 για άτομα με ειδικές ανάγκες-147,5 m²), Bamp & R (20msc), proj.with αφυδάτωση της περιοχής, οδικό ποδήλατο-1 155 m², πεζοδρόμια, φωτισμός-1pc, inf.passenger, κόσμος ποδηλάτων, στάση λεωφορείου.,table.detours, τιφλογραφικός χάρτης του σταθμού, καθοδηγώντας πίνακες, απογραφή και πράσινο έργο, τα ρομπότ τελειώνουν.)4.Αγορά των ποδηλάτων πόλεων με τον εξοπλισμό, 5.Προωθητικό και ενημερωτικό περιοδικόΠροϊόντα (έτος επίτευξης-2018)•Lb κατασκευή. ZWP-3pcs.•Lb εγκαταστάσεις “park and drive”–3 τμχ.•Lb θέσεις στάθμευσης στις χτισμένες εγκαταστάσεις “park and drive”–15τμχ.•Lb θέσεις στάθμευσης για άτομα με ειδικές ανάγκες στο κτιστό πάρκο και οδήγηση’–4τμχ.•Lb των κτισμένων εγκαταστάσεων“Bikeamp; ride”––3pcs•Lb περίπτερα στις κτισμένες εγκαταστάσεις“Bikeamp &Ride”–100pcs.•Lb υποδομή.- 1,01 km•Lb δράσεις και εκστρατείες προώθησης-1pcs•Lb new/moder. light points-10pcs. (Greek)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Croatian)
Proj.realizo. će biti dio 5 zadataka i uključivat će izgradnju 3 integrirana čvorišta (ZWP)od infrastrukturą:1.Budowa ZWP u Szamotuły (priprema i rušenje radova, površine iz K.granitowa, uvala bus.,paski,dr.manewr.-1 056 m², parkovi Pamp;R(83msc uključujući 2za hendikepe-1 047,5 m²), Bamp;R(60msc), rekonstrukcija mreže kišnog kanala., ulaz, biciklističke ceste.-500 m², pločnici-674 m², rasvjetna tijela-8pcs, putnici inf.-1pc. svjetovi bicikla, autobusna stanica, tablu. nadzorne ploče, tiflografska karta stanice, glavne ploče, inventar i projekcijsko zelenilo, završetak robota.,nadzor izgradnje).2. Izgradnja ZWP-a u Souveniru (Rob.pripremljeno. i rušenje, površine od betona,dr. drive-840 m², Pamp;R parkovi(21 mjesta-345 m²), Bamp;R(20msc),proj.s dehidracijskom površinom, cestovni bicikl.-412,5 m², šetnica-43,75 m², hodanje-putovanje-1 006,5 m², rasvjeta-1pcs, inf.passage.,svjetski bicikl., autobusno stajalište.,tabl.departmani, tiflografska karta stanice, vodilice, inventar i projekcija, radovi.) 3. Izgradnja ZPW-a u Baborówku (Rob.priprema i rušenje, 888 m², parkiranje:Pamp;R(11msc,uključujući 2za osobe s invaliditetom-147,5 m²), Bamp;R(20msc),proj.s dehidracijom područja,cest bicikl-1 155 m², pločnici, rasvjeta-1pc, inf.passenger, biciklistički svijet, autobusna stanica.,table.detours, tifografska karta stanice, vodičske ploče, inventar i projekt zeleni, roboti završiti.)4.Nabava gradskih bicikala s opremom, 5.Promocijski i informacijski časopisProizvodi (godina postignuća-2018) •Lb izgradnja. ZWP-3pcs.●Lb objekti „park i pogon” – 3 kom. •Lb parkirna mjesta u izgrađenim objektima „park i pogon” – 15 kom. •Lb parkirna mjesta za osobe s invaliditetom u izgrađenim objektima „park i pogon” – 4pcs.-Lb izgrađenih objekata „Bikeamp; ride” – 3pcs„Lb stoji u izgrađenim objektima ‚Bikeamp;Ride’ – 100pcs. -Long podržana infrastruktura.- 1,01 km„Lb akcije i promotivne kampanje – 1pcs •Lb novi/moder. light point-10pcs. (Croatian)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Romanian)
Proj.realizo. va face parte din 5 sarcini și va include construirea a 3 interschimburi integrate (ZWP) de la infrastrukturą:1.Budowa ZWP în Szamotuły (lucrări de pregătire și demolare, suprafețe din K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parcuri Pamp;R(83msc inclusiv 2pentru handicapuri-1 047,5 m²), Bamp;R(60msc),reconstrucția rețelei canalului de ploaie., intrări, drumuri pentru biciclete.-500 m², trotuare-674 m²,lighting-8pcs, Inf. 1 buc., lumi de biciclete, stații de autobuz, tabl. tablouri de bord, harta tiflografică a stației, plăci de plumb, inventar și proiecție verdes, finisaj roboți.,supraveghere de construcție).2.Construirea ZWP în Souvenir (Rob.prepared. și demolări, suprafețe din beton, dr. drive-840 m², parcuri Pamp;R(21 locuri-345 m²), Bamp;R(20msc), proj.cu zonă de deshidratare, motocicletă.-412,5 m², Walkway-43,75 m², mers pe jos-călătorie-1 006,5 m², iluminat-1buc, bord inf.passage.,world bike.,bus stop.,tabl.departments, harta tiflografică a stației, plăcuțe de ghidare, inventar și proiecție, finisaj lucrări.)3.Construirea ZPW în Baborówk (Rob.prepararea și demolarea, 888 m², parcare:Pamp;R(11msc, inclusiv 2pentru persoane cu handicap-147,5 m²), Bamp;R(20msc),proj.cu deshidratarea zonei, motocicleta rutiera-1 155 m², trotuare,lighting-1pc,inf.passenger, lumea bicicletelor, statia de autobuz.,table.detours, harta tiflografica a statiei, placi de ghidare, inventar si proiect verde, finisaj roboti.)4.Aprovizionarea bicicletelor urbane cu echipamente,5. Revista de promovare si informareProduse(anul realizarii 2018)•Construirea Lb. ZWP-3pcs.•Locuri de parcare pentru persoanele cu handicap în parcarea și conducerea spațiilor construite.•Locuri de parcare în spațiile construite „Bikeamp; ride”-3pcs.•Locuri de parcare pentru persoanele cu handicap în spațiile construite„Bikeamp;Ride”-100pcs.•Infrastructură susținută pe scară largă. biciclete.- 1,01 km•Acțiuni Lb și campanii de promovare-1pcs•Lb nou/moder. (Romanian)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Slovak)
Proj.realizo. bude súčasťou 5 úloh a bude zahŕňať výstavbu 3 integrovaných výmen (ZWP) od infrastrukturą:1.Budowa ZWP v Szamotuły(Prípravné a demolačné práce, povrchy z K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parky Pamp;R(83msc vrátane 2 pre znevýhodnenia-1 047,5 m²), Bamp;R(60msc),rekonštrukcia siete dažďového kanála.,entries,bike road.-500 m², chodníky-674 m², osvetlenie-8ks, cestujúci inf.-1pc.,bicyklové svety, autobusová zastávka,tabl. palubné dosky, tiflografická mapa stanice, olovené dosky, inventár a projekcia zelených, 2.výstavba ZWP v Souvenir (Rob.pripravený. a demolácia,povrch z betónu,dr. drive-840 m², Pamp;R parky(21 miest – 345 m²),Bamp;R(20msc),proj. s dehydratáciou, cestné bicykle.-412,5 m², chodník-43,75 m², chôdza-cestovanie-1 006,5 m², osvetlenie-1ks, board inf.passage.,world bike., autobusová zastávka.,tabl.oddelenia, tiflografická mapa stanice, vodiace dosky, inventár a projekcia, práce dokončiť.)3.Building ZPW v Baborówk(Rob.príprava a demolácia, 888 m²,parkovanie:Pamp;R(11msc, vrátane 2 pre zdravotne postihnutých – 147,5 m²), Bamp;R(20msc),proj.s dehydratáciou oblasti, cestný bicykel-1 155 m², chodníky, osvetlenie-1pc, inflenger, cyklistický svet, autobusová zastávka.,table.detours, tiflografická mapa stanice, usmerňovacie dosky, inventár a projekt zelená, roboty dokončiť.)4.Nákup mestských bicyklov s vybavením,5.Promotional a informačný časopisProdukty (rok dosiahnutia-2018)•Lb konštrukcia. ZWP-3pcs.•Lb zariadenia „park a pohon“ – 3 ks.•Lb parkovacie miesta v zastavanom zariadení „parkovisko a pohon“ – 15ks.•Lb parkovacie miesta pre osoby so zdravotným postihnutím v zastavanom zariadení„park a pohon“ – 4ks.•Lb zabudované zariadenia „Bikeamp; ride“–3pcs•Lb nové/moderové svetelné body „Bikeamp;Ride“ – 100 ks.•Dlhá podporovaná infraštruktúra. bicykel.- 1,01 km•Lb akcie a propagačné kampane-1pcs•Lb nové/moderové svetelné body-10pcs. (Slovak)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Maltese)
Proj.realizo. se jkun parti minn 5 kompiti u se jinkludi l-kostruzzjoni ta’ 3 interskambji integrati (ZWP) minn infrastrukturą:1.Budowa ZWP fi Szamotuły (Xogħlijiet ta’ tħejjija u demolizzjoni, uċuħ minn K.granitowa, xarabank tal-bajja.,paski, dr.manewr.-1 056 m², parks Pamp;R(83msc inkluż 2għal żvantaġġi-1 047.5 m²), Bamp; R (60msc), kostruzzjoni tan-netwerk tal-kanal tax-xita., entries, toroq bike.-500 m², bankini-674 m², dawl-8pcs, passiġġier inf.-1pc., Dinjiet tar-rota, stop bus,tabl. dashboards, mappa finitura tal-istazzjon, pjanċi taċ-ċomb, aħdar tal-inventarju u tal-projezzjoni, robots finitura., kostruzzjoni superviżjoni).2.Kostruzzjoni tal-ZWP fil Souvenir (Rob.preparat. u demolizzjoni, uċuħ magħmula minn konkrit, dr. drive-840 m², parks Pamp; R (21 postijiet-345 m²),Bamp; R (20msc), Proj.with żona deidrazzjoni, bike triq.-412.5 m², walkway-43.75 m², mixi-vjaġġ-1 006.5 m², dawl-1pcs, abbord inf.passage., bike dinja., stop bus.,tabl.departments, mappa tiflografika ta ‘l-istazzjon, pjanċi gwida, inventarju u projezzjoni, xogħlijiet finitura.)3.Building ZPW fil Baborówk (Rob.preparation u demolizzjoni, 888 m², parkeġġ: Pamp; R(11msc, inklużi 2 għal b’diżabilità-147.5 m²), Bamp; R(20msc), proj.with deidratazzjoni taż-żona, triq bike-1 155 m², bankini, dawl-1pc,inf.passenger, dinja biċikletta, bus stop.,table.detours, mappatifografika tal-istazzjon, bordijiet gwida, inventarju u l-proġett aħdar, robots finitura.)4.Purchase ta ‘roti belt b’tagħmir,5.Il-ġurnal tal-promozzjoni u l-informazzjoni Produtturi (sena tal-kisba-2018)•Kostruzzjoni Lb. ZWP-3pcs.•Lb faċilitajiet“park and drive”-3pcs.•Spazji ta’ parkeġġ Lb fil-faċilitajiet mibnija “park and drive” 15pcs.•Spazji ta’ parkeġġ għal persuni b’diżabilità fil-faċilitajiet mibnija “park and drive”–4pcs.•Lb tal-faċilitajiet mibnija “Bikeamp; ride”-3pcs•Lb stands fil-faċilitajiet mibnija “Bikeamp;Ride”–100pcs.•Infrastruttura kbira appoġġjata. bike.- 1.01 km•Azzjonijiet Lb u kampanji ta’ promozzjoni-1pcs•Lb ġdid/moder. punti tad-dawl-10pcs. (Maltese)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Portuguese)
Proj.realizo. fará parte de 5 tarefas e incluirá a construção de 3 intercâmbios integrados (ZWP) a partir de infrastrukturą:1.Budowa ZWP em Szamotuły (trabalhos de preparação e demolição, superfícies de K.granitowa, autocarro de baía.,paski,dr.manewr.-1 056 m², parques Pamp; R(83msc incluindo 2para desvantagens-1 047,5 m²), Bamp;R (60msc), reconstrução da rede de canais de chuva., entradas, estradas de bicicleta.-500 m², pavimentos-674 m², iluminação-8pcs, passageiros inf.-1pc., mundos de bicicleta, parada de Autocarros, tabl. dashboards, mapatiflográfico da estação, placas de chumbo,verdes de inventário e projeção, acabamento de robôs., supervisão de construção).2.Construção do ZWP em Souvenir (Rob.preparado. e demolição,superfícies feitas de concreto,dr. drive-840 m², Pamp;R parques(21 lugares-345 m²), Bamp; R (20msc), proj.com área de desidratação, bicicleta de estrada.-412,5 m², passarela-43,75 m², andar-viagem1006,5 m², iluminação-1pcs, bordo inf.passage., bicicleta mundial., parada de Autocarros., tabl.departments, mapa tiflográfico da estação, placas guia, inventário e projeção, acabamento de obras.)3.Building ZPW em Baborówk (Rob.preparação e demolição, 888 m²,parking:Pamp;R (11 msc, incluindo 2 para deficientes-147,5 m²), Bamp; R (20msc), proj.com desidratação da área, bicicleta de estrada-1 155 m², pavimentos, iluminação-1pc, inf.passageiro, mundo da bicicleta, parada de Autocarros.,table.detours, mapa tiflográfico da estação, placas guiadas, inventário e projeto verde, robôs terminar.)4.Comprar de bicicletas da cidade com equipamentos, 5.Promocional e jornal de informaçãoProdutos (ano de realização-2018)•Lb construção. ZWP-3pcs.•Lb instalações‘parque e drive’–3 pcs.•Lb lugares de parque nas instalações construídas ‘parque e drive’–15pcs.•Lb lugares de parque para pessoas com deficiência no parque de instalações construídas e drive‘–4pcs.•Lb das instalações construídas’Bikeamp; passeio"–3pcs•Lb está nas instalações construídas‘Bikeamp; Ride’–100pcs.•Infraestrutura suportada longa. bicicleta.- 1,01 km•Ações Lb e campanhas de promoção-1pcs•Lb novo/moder. pontos de luz-10pcs. (Portuguese)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Finnish)
Proj.realizo. on osa viittä tehtävää, ja siihen kuuluu kolmen integroidun vaihdon (ZWP) rakentaminen infrastrukturą:1.Budowa ZWP Szamotułyssa (valmistelu- ja purkutyöt, pinnat K.granitowasta, Bay bus.,paski,dr.manewr.-1 056 m², puistot Pamp;R(83msc mukaan lukien 2 tasoitus-1 047,5 m²), Bamp;R(60msc), sadekanavaverkon rekonstruointi., entries, pyörätiet.-500 m², jalkakäytävät-674 m², valaistus-8kpl, matkustaja inf.-1pc., pyörämaailmot, bussipysäkki, tabl. kojelautat, asemantiflografinen kartta, lyijylevyt, inventaario ja projektio vihreät, robottien viimeistely., rakennusvalvonta).2.ZWP: n rakentaminen matkamuistoihin (Rob.valmistettu ja purku, betonista valmistetut pinnat, dr. drive-840 m², Pamp;R-puistot (21 paikkaa-345 m²), Bamp;R(20msc),proj.with dehydration area, road bike.-412,5 m², kävelytie-43,75 m², kävely-travel-1 006,5 m², valaistus-1kpl, laiva inf.passage.,world bike.,bus stop.,tabl.departments,tiflographic kartta aseman, opaslevyt, inventaario ja projektio, töiden viimeistely.)3.Rakentaminen ZPW Baborówk (Rob.valmistelu ja purku, 888 m², parkkipaikka:Pamp;R(11msc, mukaan lukien 2 vammaisille-147,5 m²), Bamp;R(20msc),proj.with dehydration of the area,road bike-1 155 m², jalkakäytävät, valaistus-1pc, inf.passenger, polkupyörän maailma, bussipysäkki.,table.detours,tiflografinen kartta aseman, opastaulut, inventaario ja projektin vihreä, robotit viimeistely.)4.Osto kaupunkipyöriä laitteilla,5.Promotional and information journalTuotteet(saavutusten vuosi-2018)•Lb rakentaminen. ZWP-3pcs.•Lb facilities’park and drive’–3 kpl.•Lb-pysäköintipaikat rakennettujen tilojen puistossa ja asema- 15pcs.•Lb-pysäköintipaikat rakennetuissa tiloissa ”pysäköinti ja ajaminen”-4pcs.•Lb rakennettujen tilojen ’Bikeamp; ride”–3pcs•Lb seisoo rakennetuissa tiloissa’Bikeamp;Ride’–100pcs.•Pong tuettu infrastruktuuri. pyörä.- 1,01 km•Lb-toimet ja myynninedistämiskampanjat-1pcs•Lb uudet/moderi. valopisteet-10pcs. (Finnish)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Slovenian)
Proj.realizo. bo del 5 nalog in bo vključeval gradnjo 3 integriranih izmenjav (ZWP) iz infrastrukturą:1.Budowa ZWP v Szamotułyju (priprava in rušenje, površine iz K.granitowa, zalivski avtobus.,paski,dr.manewr.-1 056 m², parki Pamp;R(83 msc, vključno z 2 za invalide-1 047,5 m²), Bamp;R(60msc),rekonstrukcija deževnega kanala omrežja.,entries, kolesarske ceste.-500 m², pločniki-674 m², razsvetljave-8pcs, Potnik inf.-1pc., Bike svetovi,bus stop, Tabl. armaturne plošče, Tiflografski zemljevid postaje, svinčene plošče, inventar in projekcija zelenice, izdelava ZWP v spominu (Rob. priprava in rušenje, površine iz betona,dr. pogon-840 m², Pamp;R parki (21 mest-345 m²), Bamp;R(20msc),proj. z dehidracijsko površino, cestno kolo.-412,5 m², pešpot-43,75 m², hoja-pot-1 006,5 m², razsvetljava-1pcs, krovu inf.passage.,World kolo.,bus postajališča,tabl.departments,tiflografski zemljevid postaje, vodilne plošče, inventar in projekcija, dela konča.)3.graditev ZPW v Baborówk (Rob.priparacija in rušenje, 888 m²,parkiranje:Pamp;R(11msc, vključno z 2za invalide 147,5 m²), Bamp;R(20msc),proj.z dehidracijo območja, cestno kolo-1 155 m², pločniki, osvetlitev-1pc,inf.potnik, kolesarski svet, avtobusno postajališče.,table.detours, tiflografski zemljevid postaje,vodilne deske,inventar in projekt zeleno, roboti končajo.)4.Nakup mestnih koles z opremo,5.Promocijski in informacijski časopisProducts(leto dosežka-2018)•Lb gradnja. ZWP-3pcs.•Lb parkirna mesta za invalide v zgrajenih objektih‚park and drive‘-3 kos.•Lb parkirna mesta za invalide v zgrajenih objektih‚park in pogon‘-4pcs.•Lb zgrajenih objektov„Bikeamp; vožnja"–3pcs•Lb stoji v grajenih objektih„Bikeamp;Ride’–100pcs.•Dolga podprta infrastruktura.- 1,01 km•Lb akcije in promocijske kampanje-1pcs•Lb nove/moder. svetlobne točke-10pcs. (Slovenian)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Czech)
Proj.realizo. bude součástí 5 úkolů a bude zahrnovat výstavbu 3 integrovaných výměn (ZWP) z infrastrukturą:1.Budowa ZWP ve Szamotuły(Preparační a demoliční práce, povrchy z K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parky Pamp;R(83msc včetně 2pro handicapy-1 047,5 m²), Bamp;R(60msc),rekonstrukce sítě dešťových kanálů.,vstupy, cyklistické silnice.-500 m², chodníky-674 m², osvětlení-8ks, pasažér inf.-1pc.,bike světy, autobusová zastávka,tabl. dashboards, tiflografické mapy stanice, vedení desek, inventář a projekce zeleně, dokončení robotů.,výstavba ZWP v Souveniru (Rob.připraveno. a demolice,povrchy z betonu,dr. drive-840 m², Pamp;R parky(21 míst-345 m²),Bamp;R(20msc),proj. s dehydratační plochou, silniční kolo.-412,5 m², chodník-43,75 m², chůze-cestování-1 006,5 m², osvětlení-1ks, palubní inf.passage.,světové kolo., zastávka autobusu.,tabl.departments, tiflografické mapy stanice, vodicí desky, inventář a projekce, dokončení prací.)3.Budování ZPW v Baborówk(Rob. Příprava a demolice, 888 m²,parkování:Pamp;R(11msc, včetně 2 pro handicapované 145,5 m²), Bamp;R(20msc),proj.s dehydratací oblasti,road bike-1 155 m², chodníky,lighting-1ks,inf.passenger, cyklistický svět, autobusová zastávka.,table.detours,tiflographic map of the station,guiding boards,inventory and project green, roboti finish.)4.Výkup městských kol s vybavením,5.Propagační a informační deníkProdukty(rok úspěchů-2018)•Lb konstrukce. ZWP-3ks.•Lb zařízení’park a pohon’–3 ks.•Lb parkovací místa v parku a pohonu’–15pcs.•Lb parkovací místa pro osoby se zdravotním postižením v zastavěném zařízení’parku a pohon’–4ks.•Lb postavených zařízení„Bikeamp; jízda“–3ks•Lb stojí v zastavěném zařízení„Bikeamp; Ride’–100pcs.•Dlouhá podporovaná infrastruktura. kolo.- 1,01 km•Lb akce a propagační kampaně-1ks•Lb nové/moder. lehké body-10ks. (Czech)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Lithuanian)
Proj.realizo. bus 5 užduočių dalis ir apims 3 integruotų mainų (ZWP) statybą iš infrastrukturą:1.Budowa ZWP Szamotuły (parengimo ir griovimo darbai, paviršiai iš K.granitowa, įlanka autobusas.,paski,dr.manewr.-1 056 m², parkai Pamp;R(83msc įskaitant 2 neįgaliesiems-1 047,5 m²), Bamp;R(60msc), rekonstrukcija lietaus kanalų tinklą., įėjimai, dviračių keliai.-500 m², šaligatviai-674 m², apšvietimas-8pcs,keleivis inf.-1pc., Dviračių pasauliai, autobusų stotelė, TABL. prietaisų skydeliai, Tiflografinis žemėlapis stoties, švino plokštės, inventorius ir projekcijos žalumynai, robotų apdaila., statybos priežiūra).2. ZWP statyba suvenyruose (Rob.pared. ir griovimas, paviršiai iš betono,dr. drive-840 m², Pamp;R parkai(21 vieta – 345 m²),Bamp;R(20msc), proj.su dehidratacijos plotu, kelio dviratis.-412,5 m², pėsčiųjų takas-43,75 m², vaikščiojimas-kelionė-1 006,5 m², apšvietimas-1vnt, borto inf.passage., pasaulis dviratis., autobusų stotelė., tabl.departments, Tifl.departments, Tiflografinis žemėlapis stoties, kreipiamosios plokštės, inventorius ir projekcija, darbų apdaila.)3.Pastatymas ZPW Baborówk(Rob. paruošimas ir griovimas, 888 m², stovėjimo aikštelė:Pamp;R(11msc, įskaitant 2 neįgaliesiems-147,5 m²), Bamp;R(20msc),proj.su dehidratacija plotas, kelių dviratis-1 155 m², šaligatviai, apšvietimas-1pc,inf.passenger, dviračių pasaulis, autobusų stotelė.,table.detours, Tifografinis žemėlapis stoties, orientavimo lentos, inventorius ir projektas žalia, robotai apdaila.)4.Pirkimas miesto dviračių su įranga,5.Promocinis ir informacinis žurnalasProducts(metai pasiekimų-2018)•Lb statyba. ZWP-3pcs.•Lb įrenginiai’parkas ir pavara’-3 vnt.•Lb stovėjimo vietos pastatytuose įrenginiuose’parkas ir pavara’-15vnt.•Lb stovėjimo vietos neįgaliems asmenims pastatytuose įrenginiuose’parkas ir pavara’-4vnt.•Lb pastatytų įrenginių’Bikeamp; ride" – 3pcs•Lb stovi pastatytuose įrenginiuose’Bikeamp;Ride’-100pcs.•Ilgo palaikomos infrastruktūros.- 1,01 km•Lb veiksmai ir skatinimo kampanijos-1pcs•Lb. šviesos taškai-10pcs. (Lithuanian)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Latvian)
Proj.realizo. būs daļa no 5 uzdevumiem un ietvers 3 integrētu apmaiņas (ZWP) būvniecību no infrastrukturą:1.Budowa ZWP Szamotuły (Sagatavošanas un nojaukšanas darbi, virsmas no K.granitowa, lauru autobuss.,paski,dr.manewr.-1 056 m², parki Pamp;R(83msc ieskaitot 2 par nelabvēlīgiem apstākļiem-1 047,5 m²), Bamp;R(60msc), lietus kanālu tīkla rekonstrukcija., novietnes, velosipēdu ceļi.-500 m², brusas-674 m², apgaismojums-8pcs, pasažieru inf.-1pc., velosipēdu pasaulēm, autobusu pietura, tabl. infopaneļi, stacijas plāksnītes, svina plāksnes, inventāra un projekcijas zaļumi, roboti apdare., būvuzraudzība).2.ZWP būvniecība suvenīros (Rob.gatavots un nojaukšana,betona virsmas, dr. drive-840 m², Pamp;R parki(21 vieta-345 m²), Siena;R(20msc),proj.ar dehidratācijas platību, ceļa velosipēdu.-412,5 m², celiņš-43,75 m², pastaigu taka-1 006,5 m², apgaismojums-1gab, borta inf.passage., pasaules velosipēds., autobusu pietura., tabl.departmenti, stacijas plāksnītes, inventārs un projekcija, darbu apdare.) 3.Bilding ZPW in Baborówk (Rob.preparācija un nojaukšana, 888 m², autostāvvieta:Pamp;R(11msc, ieskaitot 2 invalīdiem-147,5 m²), Bamp;R(20msc),proj.ar dehidratāciju jomā, ceļa velosipēds-1 155 m², brusas, apgaismojums-1pc, inf.pasažieris, velosipēdu pasaule, autobusa pietura.,table.detours,tiflographic karte stacijas, vadošie dēļi, inventārs un projekts zaļš, roboti apdare.) 4.Purchase pilsētas velosipēdiem ar aprīkojumu, 5.Promotional un informācijas žurnālsProducts(gads sasniegums-2018)• Lb būvniecība. ZWP-3pcs.•Lb iekārtas“parks un disks”–3 gab.•Lb autostāvvietas iebūvēto iekārtu “parks un disks”–15 gab.•Lb stāvvietas invalīdiem iebūvēto iekārtu “parks un disks”–4 gab.•Lb no būvētajām iekārtām “Bikeamp; braukt”– 3 gab•Lb statīvi būvētajās telpās “Bikeamp; Ride”–100pcs.•Long atbalstītā infrastruktūra. velosipēds.- 1,01 km•Lb pasākumi un veicināšanas kampaņas-1pcs•Lb jauns/moder. gaismas punkti-10pcs. (Latvian)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Bulgarian)
Proj.realizo. ще бъде част от 5 задачи и ще включва изграждането на 3 интегрирани обмена (ZWP) от infrastrukturą:1.Budowa ZWP в Szamotuły (Подготовка и разрушаване, повърхности от K.granitowa, залив автобус.,paski,dr.manewr.-1 056 m², паркове Pamp;R(83msc включително 2 за увреждания-1 047,5 m²), Bamp;R(60msc), реконструкция на мрежата от дъждовни канали., входове, колоездачни пътища.-500 m², тротоари-674 m², осветление-8pcs, пътници inf.-1pc., велосипеди светове, автобусна спирка, табла. табла, тифлографска карта на станцията, водещи плочи, инвентаризация и проекционни зелени, роботи завършват., строителен надзор).2.Изграждане на ZWP в Сувенир (Rob. подготвени. и разрушаване, повърхности, изработени от бетон, д-р шофиране-840 m², Pamp;R паркове(21 места-345 m²), Bamp;R(20msc),proj. с площ за дехидратация, шосеен велосипед.-412,5 m², пешеходна пътека-43,75 m², пешеходно пътуване-1 006,5 m², осветление-1бр, бордови inf.passage., световен велосипед., автобусна спирка.,tabl.departments, тифлографска карта на станцията, указателни табели, инвентаризация и проекция, завършване на работите.)3.Строителство ZPW в Baborówk(Rob.препарат и разрушаване, 888 m², паркинг:Pamp;R(11msc, включително 2 за инвалиди-147,5 m²), Bamp;R(20msc),proj.proj.с дехидратация на района, пътно колело-1 155 m², тротоари, осветление-1pc, inf.passenger, велосипед свят, автобусна спирка.,table.detours, тифлографска карта на станцията, насочващи дъски, инвентаризация и проект зелено, роботи завърши.)4.Покупка на градски велосипеди с оборудване,5.Промоционални и информационни списанияПродукти (година на постижението-2018) •Lb строителство. ZWP-3pcs. •Lb места за паркиране и шофиране„–3 бр. •Lb паркоместа в изградените съоръжения' парк и задвижване'–15бр. •Lb паркоместа за хора с увреждания в изградените съоръжения' парк и шофиране'–4бр. •Lb на изградените съоръжения„Bikeamp; езда„–3pcs •Lb стои в изградените съоръжения„Bikeamp;Ride“–100pcs. •Дълга поддържана инфраструктура. — 1,01 km •Lb действия и промоционални кампании-1pcs •Lb new/moder. (Bulgarian)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Hungarian)
A Proj.realizo. része lesz 5 feladatnak, és magában foglalja 3 integrált csomópont (ZWP) építését a infrastrukturą:1.Budowa ZWP-től Szamotułyban (előkészítési és bontási munkák, K.granitowa felületei, öbölbusz., paski, dr.manewr.-1 056 m², parkok Pamp;R(83 msc beleértve 2 a hátrány-1 047,5 m²), Bamp;R(60msc), rekonstrukciója az esőcsatorna hálózat., belépések, kerékpár utak.-500 m², járdák-674 m², világítás-8db, utas inf.-1db, kerékpár világok, buszmegálló, tabl. műszerfalak, tiflográfiai térkép az állomás, ólomlemezek, leltár és vetítés zöldek, robotok befejez., építési felügyelet).2.A ZWP építése Souvenirben (Rob.kész. és bontás, felületek betonból, dr. drive-840 m², Pamp;R parkok(21 férőhely-345 m²),Bamp;R(20msc), proj. dehidrációs terület, közúti kerékpár.-412,5 m², Walway-43,75 m², séta-travel-1 006,5 m², világítás-1db, fedélzeti inf.passage., világkerékpár., busz megálló., tabl.departments, teflográfiai térkép az állomásról, vezetőlemezek, leltár és vetítés, befejeződik.)3.ZPW építése Baborówkban(Rob. előkészítés és bontás, 888 m²,parkolás:Pamp;R(11msc, beleértve 2 a fogyatékkal élők számára-147,5 m²), Bamp;R(20msc),proj.a terület kiszáradásával, közúti kerékpár-1 155 m², járdák, világítás-1pc,inf.utas, kerékpár világ, buszmegálló.,table.detours, tiflográfiai térkép az állomásról, útmutató táblák, leltár és projekt zöld, robotok befejeződnek.)4. Városi kerékpárok beszerzése felszereléssel,5.Promotional és információs folyóiratTermékek(a teljesítmény éve-2018)•Lb építés. ZWP-3pcs.•Lb létesítmények parkja és vezetése 3 db.•Lb parkolóhelyek az épített létesítmények parkjában és vezetésében 15db.•Lb parkolóhelyek fogyatékkal élők számára az épített létesítmények parkjában és hajtásában -4pcs.•Az épített létesítmények’Bikeamp; ride" 3pcs•Lb áll az épített létesítményekben’Bikeamp;Ride’--100pcs.•Támogatott infrastruktúra.- 1,01 km•Lb akciók és promóciós kampányok-1pcs•Lb new/moder. light point-10dcs. (Hungarian)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Irish)
Beidh an Proj.realizo mar chuid de 5 thasc agus áireofar leis tógáil 3 idirmhalartú comhtháite (ZWP) ó infrastrukturą:1.Budowa ZWP in Szamotuły (oibreacha ullmhúcháin agus scartála, dromchlaí ó K.granitowa, bus bá.,Paski,dr.manewr.-1 056 m², páirceanna Pamp;R(83msc lena n-áirítear 2 do mhíbhuntáistí-1 047.5 m²), BAMP; R(60msc), atógáil an líonra cainéal báistí., iontrálaithe, bóithre rothar.-500 m², cosáin-674 m², solas-8pcs, inf.-1pc paisinéirí., saol rothar, stad bus, Tabl. dashboards, léarscáil thflographic an stáisiúin, plátaí luaidhe, greens fardal agus teilgean, críochnaigh robots., maoirseacht tógála).2.Tógáil an ZWP i cuimhneacháin (Rob.prepared. agus scartáil, dromchlaí déanta as coincréit, tiomáint tiomáint-840 m², Pamp; páirceanna R(21 áiteanna-345 m²),BAMP;R(20msc), proj.with limistéar díhiodráitithe, rothar bóthair.-412.5 m², siúlbhealach-43.75 m², siúl-taisteal-1 006.5 m², soilsiú-1pcs, inf.passage ar bord., rothar domhanda., stad bus., Tabl.departments, léarscáil thalfagrafach an stáisiúin, plátaí treorach, fardal agus teilgean, bailchríoch oibreacha.)3.Tógáil ZPW i Baborówk (Rob.preparation agus scartáil, 888 m², páirceáil:Pamp;R(11msc, lena n-áirítear 2 do dhaoine faoi mhíchumas-147.5 m²),BAMP;R(20msc),proj.with dehydration an cheantair, rothar bóthair-1 155 m², cosáin, solas-1pc, inf.passenger, inf.passenger, domhan rothar, stad bus.,table.detours, léarscáil thflographic an stáisiúin, cláir treorach, fardal agus tionscadal glas, críochnaíonn robots.)4.Ceannach rothair cathrach le trealamh,5. Áiseanna ZWP-3pcs.•Lb ‘chlós agus tiomáint’ — 3 ríomhaire.•Lb spásanna páirceála i bpáirceáil agus tiomáint na n-áiseanna tógtha’–15pcs.•Lb spásanna páirceála do dhaoine faoi mhíchumas sna saoráidí tógtha ‘chlós agus tiomáint’ — 4pcs.•Lb de na saoráidí tógtha ‘Bikeamp; ride’ –3pcs•Lb seastáin sna saoráidí tógtha ‘Bikeamp;Ride’–100pcs.•Infreastruchtúr a dtugtar tacaíocht dó. rothar.- 1.01 km•Lb Gníomhaíochtaí agus feachtais chur chun cinn-1pcs•Lb new/moder. pointí solais-10pcs. (Irish)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Swedish)
Proj.realizo. kommer att ingå i 5 uppgifter och kommer att omfatta byggandet av 3 integrerade utbyten (ZWP)från infrastrukturą:1.Budowa ZWP i Szamotuły(Förberedelse- och rivningsarbeten, ytor från K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parker Pamp;R(83msc inklusive 2för handikapp-1 047,5 m²). Bamp;R(60msc),rekonstruktion av regnkanalnätet., varor, cykelvägar.-500 m², trottoarer-674 m², belysning-8st, passagerare inf.-1pc., cykelvärldar, busshållplats, tabl. instrumentpaneler,tiflografisk karta över stationen, blyplattor, inventering och projektionsgröna, robotar finish., konstruktionsövervakning).2.Konstruktion av ZWP i Souvenir (Rob.prepared. och rivning,ytor av betong, dr. drive-840 m², Pamp;R parker(21 platser-345 m²),Bamp;R(20msc),proj. med uttorkningsområde, vägcykel.-412,5 m², gångväg-43,75 m². gång-resa-1 006,5 m², belysning-1st, ombord inf.passage., världscykel., busshållplats.,tabl.departments,tiflografisk karta över stationen, styrplattor, inventering och projektion, arbete finish.)3.Byggning ZPW i Baborówk (Rob.preparation och rivning, 888 m², parkering:Pamp;R(11msc,inklusive 2för funktionshindrade-147,5 m²), Bamp;R(20msc),proj. med uttorkning av området, vägcykel-1 155 m², trottoarer, belysning-1pc,inf.passagerare, cykelvärld, busshållplats.,table.detours,tiflografisk karta över stationen, styrbrädor, inventering och projektgrön, robotar slut.)4.Inköp av stadscyklar med utrustning,5.Promotions- och informationstidskriftProdukter(år av prestation-2018)•Lb konstruktion. ZWP-3pcs.•Lb-anläggningarnas park och körning’–3 st.•Lb parkeringsplatser i de byggda anläggningarnas park och kör’-15st.•Lb parkeringsplatser för personer med funktionsnedsättning i den byggda anläggningens park och körning’–4pcs.•Lb i de byggda anläggningarna ”Bikeamp; ride”–3pcs•Lb står i de byggda anläggningarna ’Bikeamp;Ride’–100pcs.•Long understödd infrastruktur.- 1,01 km•Lb-åtgärder och marknadsföringskampanjer-1pcs•Lb nya/moder. (Swedish)
Property / summaryProperty / summary
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (Estonian)
Proj.realizo. on osa viiest ülesandest ja hõlmab kolme integreeritud vahetuste (ZWP) ehitamist: infrastrukturą:1.Budowa ZWP Szamotułys (Ettevalmistus- ja lammutustööd, K.granitowa pinnad, lahe bus.,paski,dr.manewr.-1 056 m², pargid Pamp;R(83 msc, sealhulgas 2 puude puhul-1 047,5 m²), Bamp;R(60msc),ehitamine vihmakanali võrk., kanded, jalgrattateed.-500 m², kõnniteed 674 m², valgustamine-8pcs, sõitja inf.-1pc., mootorratta maailmad, bussipeatus,tabl. armatuurlauad,tiflograafiline kaart jaama, juhtivad plaadid, inventuuri ja projektsioon rohelised, robotite viimistlus., ehitusjärelevalve).2.ZWP ehitamine Suveniiris (Rob.valmistatud ja lammutus, betoonist valmistatud pinnad,dr. drive-840 m², Pamp;R pargid (21 kohta-345 m²),Bamp;R(20msc), proj. dehüdratsioonialaga, teeratas.-412,5 m², kõnnitee-43,75 m², jalutuskäik – 16,5 m², valgustus-1tk, pardasisene läbisõit.,world bike.,bus stop.,tabl.departments, jaamatiflograafiline kaart, juhtplaadid, inventuur ja projektsioon, tööde viimistlus.)3.Building ZPW Baborówkis (Rob.ettevalmistamine ja lammutamine, 888 m², parkimine:Pamp;R(11msc, kaasa arvatud 2 puuetega 147,5 m²), Bamp;R(20msc), proj.with dehüdratsioon ala,road bike-1 155 m², kõnniteed, valgustus-1pc,inf.passenger, jalgratta maailm, bussipeatus.,table.detours,tiflograafiline kaart jaama, giidi lauad, inventuuri ja projekti roheline, robotid viimistlus.)4.Uurimine linna jalgrattad seadmetega,5.Promotsionaalne ja infoajakiriProducts(aasta saavutus-2018)•Lb ehitus. ZWP-3pcs.•Lb rajatised’park ja drive’ –3 tk.•Lb parkimiskohad ehitatud rajatistes’park ja drive’-15pcs.•Lb parkimiskohad puuetega inimestele ehitatud rajatiste pargis ja sõita’–4tk.•Lb ehitatud rajatistest’Bikeamp; ride’–3pcs•Lb seisab ehitatud rajatistes’Bikeamp;Ride’–100pcs.•Pikk toetatud infrastruktuur. bike.- 1,01 km•Lb tegevused ja müügiedenduskampaaniad-1pcs•Lb uus/moder. valguspunktid-10pcs. (Estonian)

Revision as of 20:27, 2 March 2023

Project Q134929 in Poland
Language Label Description Also known as
English
Supporting low-carbon strategies in the City and Municipality of Szamotuły through the construction of the Integrated Interchange Node in Szamotuła, Memorial and Baborik together with infrastructure.
Project Q134929 in Poland

    Statements

    0 references
    2,960,713.1 zloty
    0 references
    658,166.52 Euro
    13 January 2020
    0 references
    3,483,191.89 zloty
    0 references
    774,313.56 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 March 2017
    0 references
    29 December 2017
    0 references
    MIASTO I GMINA SZAMOTUŁY
    0 references
    0 references

    52°35'2.08"N, 16°28'42.49"E
    0 references
    Proj.realizo. będzie w ramach 5 zadań i będzie obejmo. budowę 3 zintegrowanych węzłów przesiadkowych(ZWP)z infrastrukturą:1.Budowa ZWP w Szamotułach(Roboty przygotow. i rozbiórkowe, nawierzchnie z k.granitowej,zatoka autobus.,opaski,dr.manewr.-1056m2,parkingi Pamp;R(83msc w tym 2dla niepełnospr.-1047,5m2),Bamp;R(60msc),przebudowa sieci kanaliz. deszcz.,wjazdy, drogi rower.-500m2,chodniki-674 m2,oświetlenie-8szt.,tabl. inf. pasażerskiej-1szt.,wiaty rowerowe,przystanek autobusowy,tabl. rozkł. jazdy,tyflograficzna mapa stacji,płyty prowadzące,inwentaryzacja i proj.zieleni,roboty wykończ.,nadzór budowlany).2.Budowa ZWP w Pamiątkowie(Rob.przygotow. i rozbiórkowe,nawierzchnie z k.betonowej,dr.dojazd-840m2,parkingi Pamp;R(21miejsc-345m2),Bamp;R(20msc),proj.z odwodnieniem pow.,drogi rower.-412,5m2,chodnik-43,75m2,ciąg piesz-jezdny-1006,5m2,oświetlenie-1szt,tablica inf.pasaż.,wiata rower.,przystanek autobus.,tabl. rozkł.jazdy,tyflograficzna mapa stacji, płyty prowadzące,inwentaryzacja i proj.zieleni, roboty wykończ.)3.Budowa ZPW w Baborówku(Rob.przygotow. i rozbiórkowe,nawierzchnie z k.betonowej,droga manewr.-888m2,parkingi:Pamp;R(11msc,w tym 2dla niepełnospr.-147,5m2),Bamp;R(20msc),proj.z odwodnieniem pow.,drogi rower-1155m2,chodniki,oświetlenie-1szt,tabl. inf.pasażerskiej,wiata rowerowa,przystanek autobus.,tablica rozkł.jazdy,tyflograficzna mapa stacji,płyty prowadzące,inwentaryzacja i proj.zieleni, roboty wykończ.)4.Zakup rowerów miejskich z wyposażeniem,5.Dz.promocyjno-informacyjneProdukty proj.(rok osiągnięcia-2018)•Lb wybudowa. ZWP–3szt.•Lb wybudowa. obiektów„parkuj i jedź”–3 szt.•Lb miejsc postoj. w wybudowanych obiektach„parkuj i jedź”–115szt.•Lb miejsc postoj. dla os. niepełnospra. w wybudowanych obiektach„parkuj i jedź”–4szt.•Lb wybudowanych obiektów„Bikeamp;Ride”–3szt.•Lb stanowisk postoj. w wybudowanych obiektach„Bikeamp;Ride”–100szt.•Dł wspartej infrastru. rowero.- 1,01 km•Lb akcji i kampanii informacyjno-promocyjnych–1szt.•Lb nowych/zmoder.pkt świetlnych-10szt. (Polish)
    0 references
    X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (English)
    21 October 2020
    0 references
    Proj.realizo. fera partie de 5 tâches et comprendra la construction de 3 échangeurs intégrés (ZWP) de infrastrukturą:1.Budowa ZWP à Szamotuły (ouvrages de préparation et de démolition, surfaces de K.granitowa, bus de baie.,paski,dr.manewr.-1 056 m², parcs Pamp;R(83msc dont 2pour handicaps-1 047,5 m²), Bamp;R(60msc), reconstruction du réseau de canaux de pluie., entrées, routes cyclables.-500 m², trottoirs-674 m², éclairage-8pcs,passager inf.-1pc., mondes de vélo, arrêt de bus, tableaux de bord, plantif de la station, plaques de plomb, greens d’inventaire et de projection, finition robots., supervision de construction).2.Construction du ZWP à Souvenir (Rob.prépared. et démolition,surfaces en béton,dr. drive-840 m², Pamp;R parcs(21 places-345 m²),Bamp;R(20msc), Proj.avec zone de déshydratation, vélo de route.-412,5 m², allée-43,75 m², promenade-voyage-1 006,5 m², éclairage-1 pcs, planche inf.passage.,vélo du monde., arrêt de bus.,tabl.départements, plantif de la station, plaques guides, inventaire et projection, finition des travaux.)3.Bâtiment ZPW à Baborówk (Préparation et démolition, 888 m², stationnement:Pamp;R(11cms, y compris 2pour handicapés-147,5 m²),Bamp;R(20msc),proj.avec déshydratation de la zone, vélo de route-1 155 m², trottoirs, éclairage-1 pc,inf.passenger, monde du vélo, arrêt de bus.,table.detours, cartetiflographique de la gare, planches de guidage, inventaire et projet vert, finition robots.)4.Achat de vélos de ville avec équipement,5.Journal promotionnel et d’informationProduits (année de réalisation-2018)•Lb construction. ZWP-3pcs.•Lb installations ‘park and drive’–3 pcs.•Lb places de stationnement dans les installations construites ‘parc et conduite’–15pcs.•Lb places de stationnement pour personnes handicapées dans les installations construites ‘parc et voiture’-4pcs.•Lb des installations construites ‘Bikeamp; ride"-3pcs•Lb se trouve dans les installations construites’Bikeamp;Ride’–100pcs.•Long support infrastructure.- 1,01 km•Lb actions et campagnes de promotion-1pcs•Lb new/moder. light points-10pcs. (French)
    2 December 2021
    0 references
    Proj.realizo. wird Teil von 5 Aufgaben sein und umfasst den Bau von 3 integrierten Austauschstellen (ZWP)von infrastrukturą:1.Budowa ZWP in Szamotuły (Vor- und Abbrucharbeiten, Oberflächen von K.granitowa, Buchtbus.,paski,dr.manewr.-1 056 m², Parks Pamp;R(83msc einschließlich 2für Handicap-1 047,5 m²), Bamp;R(60msc), Rekonstruktion des Regenkanalnetzes.,Einrichtungen, Fahrradstraßen.-500 m², Gehwege-674 m², Beleuchtung-8pcs,Fahrgast-Inf.-1pc.,Fahrradwelten, Bushaltestelle,tabl. Armaturenbretter,tiflographische Karte der Station, Bleiplatten, Inventar und Projektionsgrün, Roboter Finish., Bauüberwachung).2.Bau der ZWP in Souvenir (Rob. vorbereitet. und Abbruch, Oberflächen aus Beton,Trockenantrieb-840 m², Pamp;R Parks(21 Plätze-345 m²),Bamp; R(20mscsc), proj.mit Dehydrationsfläche, Rennrad.-412,5 m², Gehweg-43,75 m², Gehweg-1 006,5 m², Beleuchtung-1pcs, Board inf.passage.,world bike.,bus stop.,tabl.departments,tiflographische Karte der Station, Führungsplatten, Inventar und Projektion, Arbeitsende.)3.Bauen ZPW in Baborówk(Rob.Vorbereitung und Abbruch, 888 m², Parken:Pamp;R(11msc, einschließlich 2für Behinderte-147,5 m²),Bamp; R(20msc), Proj.mit Dehydrierung der Gegend, Straßenfahrrad-1 155 m², Gehwege, Beleuchtung-1pc,inf.Passenger, Fahrradwelt, Bushaltestelle.,table.detours,tiflographische Karte des Bahnhofs, Führung Bretter, Inventar und Projekt grün, Roboter Finish.)4.Kauf von Stadtfahrrädern mit Ausrüstung,5.Werbe- und InformationszeitschriftProdukte(Jahr der Leistung-2018)•Lb-Bau. ZWP-3 Stk.•Lb Einrichtungen‚Park und Antrieb‘–3 Stk.•Lb Parkplätze in den gebauten Einrichtungen‚Park und Antrieb‘–15 Stk.•Lb Parkplätze für Behinderte in den gebauten Einrichtungen‚Park und Antrieb‘–4pcs•Lb der gebauten Einrichtungen„Bikeamp; Ride“ – 3pcs•Lb steht in den gebauten Einrichtungen‚Bikeamp;Ride‘–100pcs•Long unterstützte Infrastruktur.- 1,01 km•Lb Aktionen und Werbekampagnen-1pcs•Lb neu/moder Lichtpunkte-10 Stk. (German)
    9 December 2021
    0 references
    Proj.realizo. zal deel uitmaken van 5 taken en omvat de bouw van 3 geïntegreerde wisselingen (ZWP)van infrastrukturą:1.Budowa ZWP in Szamotuły(Voorbereiding en sloopwerkzaamheden, oppervlakken van K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parken Pamp;R(83msc inclusief 2for handicaps-1 047,5 m²), Bamp;R(60msc), reconstructie van het regenkanaal netwerk.,entries,bike wegen.-500 m², trottoirs-674 m², verlichting-8pcs, passagiers inf.-1pc.,bike werelden, bushalte, tabl. dashboards,tiflografische kaart van het station, loodplaten, inventaris en projectie greens, robots afwerking., bouw supervisie).2.Bouw van de ZWP in Souvenir (Rob.prepared. en demolition, oppervlaktes gemaakt van beton, dr. rijden-840 m², Pamp;R parken(21 plaatsen-345 m²),Bamp;R(20 m), oppervlakten gemaakt van beton, rijden-840 m², Pamp;R parken(21 plaatsen-345 m²),Bamp;R(20 m), Proj.with uitdroging gebied, racefiets.-412,5 m², walkway-43,75 m², walking-travel-1 006,5 m², verlichting-1 stks, board inf.passage.,world bike.,bus stop.,tabl.departments,tiflografische kaart van het station, gidsplaten, inventaris en projectie, werken afwerking.)3.Building ZPW in Baborówk(Rob.preparation and smolition, 888 m², parkeren:Pamp;R(11msc, inclusief 2for gehandicapten-147,5 m²), Bamp;R(20msc), Proj.with uitdroging van het gebied, racefiets-1 155 m², trottoirs, verlichting-1pc, inf.passagiers, fietswereld, bushalte.,table.detours,tiflografische kaart van het station, begeleidingsborden, inventaris en projectgroen, robots eindigen.)4.Aankoop van stadsfietsen met apparatuur,5.Promotioneel en informatiedagboekProducten (jaar van prestatie-2018)•Lb-bouw. ZWP-3pcs.•Lb-parkeerplaatsen voor gehandicapten in de gebouwde faciliteiten „park en drive”–4pcs.•Lb van de gebouwde faciliteiten„Bikeamp; ride”–3pcs•Lb staat in de gebouwde faciliteiten„Bikeamp;Ride”–100pcs.•Lb ondersteunde infrastructuur. fiets.- 1,01 km•Lb acties en promotiecampagnes-1pcs•Lb nieuw/moder. lichtpunten-10 st. (Dutch)
    17 December 2021
    0 references
    Proj.realizo. farà parte di 5 compiti e comprenderà la costruzione di 3 interscambi integrati (ZWP) da infrastrukturą:1.Budowa ZWP a Szamotuły(Lavori di preparazione e demolizione, superfici da K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parchi Pamp;R(83msc di cui 2 per gli handicap-1 047,5 m²), Bamp;R(60msc), ricostruzione della rete del canale della pioggia.,entri, strade ciclabili.-500 m², pavimentazioni-674 m², illuminazione-8 pz,passeggero inf.-1pc.,modi di moto, fermata dell'autobus, cruscotti tabl., cartina tiflografica della stazione,piastre guida,verdi di inventario e proiezione, finitura robot., supervisione della costruzione).2.Costruzione dello ZWP a Souvenir (Rob.prepared. e demolition,superfici in calcestruzzo, azionamento 840 m², Pamp;R parchi(21 posti-345 m²),Bamp;R(20cms), Proj.con area disidratazione, bici da strada.-412,5 m², passerella-43,75 m², viaggio a piedi-1 006,5 m², illuminazione-1 pz, bordo inf.passage.,world bike., fermata bus.,tabl.departments, mappa tiflografica della stazione, targhe guida, inventario e proiezione, finitura lavori.)3.Building ZPW a Baborówk(Rob.preparazione e demolizione, 888 m²,parcheggio:Pamp;R(11msc, inclusi 2 per disabili-147,5 m²),Bamp;R(20msc), Proj.con disidratazione della zona, bici da strada-1 155 m², marciapiedi, illuminazione-1pc,inf.passeggero, mondo della bicicletta, fermata dell'autobus.,table.detours, mappa tiflografica della stazione,piscine guida, inventario e progetto verde, robot finitura.)4.Acquisto di biciclette da città con attrezzature,5.Diario promozionale e informativoProdotti (anno di realizzazione-2018)•Lb costruzione. ZWP-3pcs.•Lb facilities'parcheggio and drive'–3 pz.•Lb parcheggi nelle strutture costruite'parco e guida'–15pcs.•Lb parcheggi per disabili nelle strutture costruite ‘parco e guida'–4pcs.•Lb delle strutture costruite "Bikeamp; ride"–3pcs•Lb si trova nelle strutture costruite "Bikeamp;Ride"–100pcs.•Lb infrastrutture.- 1,01 km•Azioni e campagne promozionali Lb-1pcs•Lb nuovi/moder. punti luce-10pcs. (Italian)
    15 January 2022
    0 references
    Proj.realizo. formará parte de 5 tareas e incluirá la construcción de 3 intercambiadores integrados (ZWP) de infrastrukturą:1.Budowa ZWP en Szamotuły(Trabajos de preparación y demolición, superficies de K.granitowa, bay bus., paski,dr.manewr.-1 056 m², parques Pamp;R(83msc incluyendo 2para handicaps-1 047,5 m²), Bamp;R(60msc),reconstrucción de la red de canales de lluvia.,entries,carreteras de bicicletas.-500 m², pavimentos-674 m²,iluminación-8pcs,pasajeros inf.-1pc.,mundos de bicicletas,parada de autobús,tabl. tableros, mapa gráfico de la estación, placas de plomo, invernaderos de inventario y proyección, acabado de robots, supervisión de la construcción).2.Construcción del ZWP en Souvenir (Rob.prepared y demolición, superficies hechas de hormigón, unidad de recorrido-840 m², Pamp;R Parks(21 lugares), 345 m²),reconstrucción de la red de canales de lluvia.,entradas, caminos de bicicletas.-500 m², pavimentos-674 m²,iluminarias, placas de plomo, verdes de proyección e inventario, acabado de robots, supervisión de la construcción).2.Construcción de la ZWP en Souvenir (Rob.prepared y demolición, superficies hechas de hormigón, dirección: 840 m², Pamp;R. Bamp;R(20msc),proj.con área de deshidratación, bicicleta de carretera.-412,5 m², pasarela-43,75 m², paseo-viaje-1 006,5 m², iluminación-1pcs,board inf.passage.,world bike., parada de autobús,tabl.departments, mapa gráfico de la estación, placas de guía, inventario y proyección, acabado de obras.)3.Construir ZPW en Baborówk(Rob.preparation y demolición, 888 m², estacionamiento:Pamp;R(11msc, incluidos 2 incapacitados-147,5 m²), proj. Bamp;R(20msc),proj.con deshidratación de la zona, bicicleta de carretera-1 155 m², pavimentos, iluminación-1pc,inf.passenger, mundo de la bicicleta, parada de autobús.,table.detours, mapa gráfico de la estación, tablas de guía, inventario y proyecto verde, robots acabados.)4.Compra de bicicletas de ciudad con equipo,5.Diario promocional e informativoProductos(año de logro-2018)•Lb construcción. ZWP-3pcs.•Lbpar y conducir’–3 pcs.•Lb plazas de aparcamiento en las instalaciones construidas‘parque y coche’–15pcs.•Lb plazas de aparcamiento para discapacitados en el parque y la conducción de las instalaciones construidas-4pcs.•Lb de las instalaciones construidas‘Bikeamp; ride"–3pcs•Lb se encuentra en las instalaciones construidas‘Bikeamp;Ride’–100pcs.•Infraestructura soportada larga.- 1,01 km•Lb acciones y campañas de promoción-1pcs•Lb nuevo/moder. puntos de luz-10pcs. (Spanish)
    18 January 2022
    0 references
    Proj.realizo. vil være en del af 5 opgaver og vil omfatte opførelse af 3 integrerede udvekslinger (ZWP)fra infrastrukturą:1.Budowa ZWP i Szamotuły (Forberedelses- og nedrivningsarbejder, overflader fra K.granitowa, bugtbus.,paski,dr.manewr.-1 056 m², parker Pamp;R(83msc herunder 2for handicap-1 047,5 m²), Bamp;R(60msc),genopbygning af regnkanalen netværk.,entries, cykelveje.-500 m², fortove-674 m², belysning-8pcs, passager inf.-1pc., cykel verdener,bus stop,tabl. dashboards,tiflografisk kort over stationen, blyplader, fortegnelse og projektion greens, robotter finish.,konstruktion overvågning).2.Konstruktion af ZWP i Souvenir (Rob.prepared. og nedrivning,overflader lavet af beton,dr. drev-840 m², Pamp;R parker(21 steder-345 m²), rekonstruktion af regnkanalen netværk.,entries, cykelveje.-500 m², fortovelser-674 m², fortove-874 m², belysning-8pc, passagerinventar inf.-1pc., cykel verdener, bus stop,tabl. dashboards,tiflografisk kort over stationen, blyplader, fortegnelse og projektion greener, robotter finish., konstruktion overvågning).2.Construktion af ZWP i Souvenir (Rob.forbered. og nedrivning,overflader lavet af beton,dr. drive-840 m², Pamp;R parker(21 steder-345 m²), rekonstruktion af regnkanalen netværk., veje, cykelveje.-500 m², fortoveringer 674 m², fortovering-874 m², belysning 840 m², fortov af ZWP i Souvenir (Rob. forberedt. og nedrivning,overflader lavet af beton,dr. drev-840 m², Pamp;R(21 steder-345 m²), rekonstruktion af regnkanalen netværk.,entries, cykelveje.-veje.-500 m², fortovelser-674 m², belysning-874 m², kørsel 840 m², cykelverdener, cykel-stop, busstoppested, fortov,tiflografisk kort over stationen, blyplader, fortegnelser og projektion greener, robotter finish Bamp;R(20msc), proj. med dehydrering område, vejcykel.-412,5 m², gangbro-43,75 m², gang-rejse-1 006,5 m², belysning-1 stk.,board inf.passage., verden cykel., busstoppested.,tabl.departments,tiflografisk kort over stationen, styreplader, opgørelse og projektion, arbejde finish.)3.Building ZPW i Baborówk (Rob.preparation og nedrivning, 888 m²,parkering:Pamp;R(11msc, herunder 2for handicappede-147,5 m²), proj. Bamp;R(20msc), proj. med dehydrering af området, landevejscykel-1 155 m², fortove, belysning-1pc,inf.passenger, cykel verden, busstoppested.,table.detours,tiflografisk kort over stationen,guiding boards, inventar og projekt grøn, robotter finish.)4.Køb af bycykler med udstyr,5.Promotional og information journalProducts(år for præstation-2018)•Lb konstruktion. ZWP-3pcs.•Lb faciliteter'parkering og kørsel"–3 pcs.•Lb parkeringspladser i den bebyggede faciliteter'park og kørsel"–15pcs.•Lb parkeringspladser for handicappede i bebyggede faciliteter "parkering og kørsel"–4pcs.•Lb af de byggede faciliteter"Bikeamp; ride"–3pcs•Lb står i de byggede faciliteter "Bikeamp;Ride'–100pcs.•Lang understøttet infrastruktur. cykel.- 1,01 km•Lb aktioner og kampagner 1pcs•Lb nye/moderne. lyspunkter-10pcs. (Danish)
    2 July 2022
    0 references
    Το Proj.realizo. θα αποτελεί μέρος 5 εργασιών και θα περιλαμβάνει την κατασκευή 3 ολοκληρωμένων κόμβων (ZWP)από το infrastrukturą:1.Budowa ZWP στο Szamotuły (έργα προετοιμασίας και κατεδάφισης, επιφάνειες από K.granitowa, λεωφορείο κόλπου.,paski,dr.manewr.-1 056 m², πάρκα Pamp;R(83msc συμπεριλαμβανομένων 2 για μειονεκτήματα-1 047,5 m²), Bamp & R (60msc), ανακατασκευή του δικτύου καναλιών βροχής., καταχωρήσεις, δρόμοι ποδηλάτων.-500 m², πεζοδρόμια-674 m², φωτισμός-8pcs, επιβάτες inf.-1pc., κόσμοι ποδηλάτων, στάση λεωφορείου, ταμπλό. ταμπλό, τιφλογραφικός χάρτης του σταθμού, πλάκες μολύβδου, απογραφή και πράσινο προβολής, τα ρομπότ τελειώνουν., επίβλεψη κατασκευής).2.Κατασκευή του ZWP στο σουβενίρ (Rob.prepared. και κατεδάφιση, επιφάνειες φιαγμένα από σκυρόδεμα,dr. drive-840 m², πάρκα Pamp &R (21 θέσεις-345 m²), Bamp &R (20msc),proj.με περιοχή αφυδάτωσης, οδικό ποδήλατο.-412,5 m², διάδρομος-43,75 m², περπάτημα-ταξίδι-1 006,5 m², φωτισμός-1pcs, πίνακας inf.passage., παγκόσμιο ποδήλατο., στάση λεωφορείου.,tabl.departments, τιφλογραφικός χάρτης του σταθμού, πινακίδες οδηγών, κατάλογος και προβολή, τελειώνουν οι εργασίες.)3.Building ZPW στο Baborówk (Rob.preparation και κατεδάφιση, 888 m², πάρκο: Pamp;R (11msc, συμπεριλαμβανομένων 2 για άτομα με ειδικές ανάγκες-147,5 m²), Bamp & R (20msc), proj.with αφυδάτωση της περιοχής, οδικό ποδήλατο-1 155 m², πεζοδρόμια, φωτισμός-1pc, inf.passenger, κόσμος ποδηλάτων, στάση λεωφορείου.,table.detours, τιφλογραφικός χάρτης του σταθμού, καθοδηγώντας πίνακες, απογραφή και πράσινο έργο, τα ρομπότ τελειώνουν.)4.Αγορά των ποδηλάτων πόλεων με τον εξοπλισμό, 5.Προωθητικό και ενημερωτικό περιοδικόΠροϊόντα (έτος επίτευξης-2018)•Lb κατασκευή. ZWP-3pcs.•Lb εγκαταστάσεις “park and drive”–3 τμχ.•Lb θέσεις στάθμευσης στις χτισμένες εγκαταστάσεις “park and drive”–15τμχ.•Lb θέσεις στάθμευσης για άτομα με ειδικές ανάγκες στο κτιστό πάρκο και οδήγηση’–4τμχ.•Lb των κτισμένων εγκαταστάσεων“Bikeamp; ride”––3pcs•Lb περίπτερα στις κτισμένες εγκαταστάσεις“Bikeamp &Ride”–100pcs.•Lb υποδομή.- 1,01 km•Lb δράσεις και εκστρατείες προώθησης-1pcs•Lb new/moder. light points-10pcs. (Greek)
    2 July 2022
    0 references
    Proj.realizo. će biti dio 5 zadataka i uključivat će izgradnju 3 integrirana čvorišta (ZWP)od infrastrukturą:1.Budowa ZWP u Szamotuły (priprema i rušenje radova, površine iz K.granitowa, uvala bus.,paski,dr.manewr.-1 056 m², parkovi Pamp;R(83msc uključujući 2za hendikepe-1 047,5 m²), Bamp;R(60msc), rekonstrukcija mreže kišnog kanala., ulaz, biciklističke ceste.-500 m², pločnici-674 m², rasvjetna tijela-8pcs, putnici inf.-1pc. svjetovi bicikla, autobusna stanica, tablu. nadzorne ploče, tiflografska karta stanice, glavne ploče, inventar i projekcijsko zelenilo, završetak robota.,nadzor izgradnje).2. Izgradnja ZWP-a u Souveniru (Rob.pripremljeno. i rušenje, površine od betona,dr. drive-840 m², Pamp;R parkovi(21 mjesta-345 m²), Bamp;R(20msc),proj.s dehidracijskom površinom, cestovni bicikl.-412,5 m², šetnica-43,75 m², hodanje-putovanje-1 006,5 m², rasvjeta-1pcs, inf.passage.,svjetski bicikl., autobusno stajalište.,tabl.departmani, tiflografska karta stanice, vodilice, inventar i projekcija, radovi.) 3. Izgradnja ZPW-a u Baborówku (Rob.priprema i rušenje, 888 m², parkiranje:Pamp;R(11msc,uključujući 2za osobe s invaliditetom-147,5 m²), Bamp;R(20msc),proj.s dehidracijom područja,cest bicikl-1 155 m², pločnici, rasvjeta-1pc, inf.passenger, biciklistički svijet, autobusna stanica.,table.detours, tifografska karta stanice, vodičske ploče, inventar i projekt zeleni, roboti završiti.)4.Nabava gradskih bicikala s opremom, 5.Promocijski i informacijski časopisProizvodi (godina postignuća-2018) •Lb izgradnja. ZWP-3pcs.●Lb objekti „park i pogon” – 3 kom. •Lb parkirna mjesta u izgrađenim objektima „park i pogon” – 15 kom. •Lb parkirna mjesta za osobe s invaliditetom u izgrađenim objektima „park i pogon” – 4pcs.-Lb izgrađenih objekata „Bikeamp; ride” – 3pcs„Lb stoji u izgrađenim objektima ‚Bikeamp;Ride’ – 100pcs. -Long podržana infrastruktura.- 1,01 km„Lb akcije i promotivne kampanje – 1pcs •Lb novi/moder. light point-10pcs. (Croatian)
    2 July 2022
    0 references
    Proj.realizo. va face parte din 5 sarcini și va include construirea a 3 interschimburi integrate (ZWP) de la infrastrukturą:1.Budowa ZWP în Szamotuły (lucrări de pregătire și demolare, suprafețe din K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parcuri Pamp;R(83msc inclusiv 2pentru handicapuri-1 047,5 m²), Bamp;R(60msc),reconstrucția rețelei canalului de ploaie., intrări, drumuri pentru biciclete.-500 m², trotuare-674 m²,lighting-8pcs, Inf. 1 buc., lumi de biciclete, stații de autobuz, tabl. tablouri de bord, harta tiflografică a stației, plăci de plumb, inventar și proiecție verdes, finisaj roboți.,supraveghere de construcție).2.Construirea ZWP în Souvenir (Rob.prepared. și demolări, suprafețe din beton, dr. drive-840 m², parcuri Pamp;R(21 locuri-345 m²), Bamp;R(20msc), proj.cu zonă de deshidratare, motocicletă.-412,5 m², Walkway-43,75 m², mers pe jos-călătorie-1 006,5 m², iluminat-1buc, bord inf.passage.,world bike.,bus stop.,tabl.departments, harta tiflografică a stației, plăcuțe de ghidare, inventar și proiecție, finisaj lucrări.)3.Construirea ZPW în Baborówk (Rob.prepararea și demolarea, 888 m², parcare:Pamp;R(11msc, inclusiv 2pentru persoane cu handicap-147,5 m²), Bamp;R(20msc),proj.cu deshidratarea zonei, motocicleta rutiera-1 155 m², trotuare,lighting-1pc,inf.passenger, lumea bicicletelor, statia de autobuz.,table.detours, harta tiflografica a statiei, placi de ghidare, inventar si proiect verde, finisaj roboti.)4.Aprovizionarea bicicletelor urbane cu echipamente,5. Revista de promovare si informareProduse(anul realizarii 2018)•Construirea Lb. ZWP-3pcs.•Locuri de parcare pentru persoanele cu handicap în parcarea și conducerea spațiilor construite.•Locuri de parcare în spațiile construite „Bikeamp; ride”-3pcs.•Locuri de parcare pentru persoanele cu handicap în spațiile construite„Bikeamp;Ride”-100pcs.•Infrastructură susținută pe scară largă. biciclete.- 1,01 km•Acțiuni Lb și campanii de promovare-1pcs•Lb nou/moder. (Romanian)
    2 July 2022
    0 references
    Proj.realizo. bude súčasťou 5 úloh a bude zahŕňať výstavbu 3 integrovaných výmen (ZWP) od infrastrukturą:1.Budowa ZWP v Szamotuły(Prípravné a demolačné práce, povrchy z K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parky Pamp;R(83msc vrátane 2 pre znevýhodnenia-1 047,5 m²), Bamp;R(60msc),rekonštrukcia siete dažďového kanála.,entries,bike road.-500 m², chodníky-674 m², osvetlenie-8ks, cestujúci inf.-1pc.,bicyklové svety, autobusová zastávka,tabl. palubné dosky, tiflografická mapa stanice, olovené dosky, inventár a projekcia zelených, 2.výstavba ZWP v Souvenir (Rob.pripravený. a demolácia,povrch z betónu,dr. drive-840 m², Pamp;R parky(21 miest – 345 m²),Bamp;R(20msc),proj. s dehydratáciou, cestné bicykle.-412,5 m², chodník-43,75 m², chôdza-cestovanie-1 006,5 m², osvetlenie-1ks, board inf.passage.,world bike., autobusová zastávka.,tabl.oddelenia, tiflografická mapa stanice, vodiace dosky, inventár a projekcia, práce dokončiť.)3.Building ZPW v Baborówk(Rob.príprava a demolácia, 888 m²,parkovanie:Pamp;R(11msc, vrátane 2 pre zdravotne postihnutých – 147,5 m²), Bamp;R(20msc),proj.s dehydratáciou oblasti, cestný bicykel-1 155 m², chodníky, osvetlenie-1pc, inflenger, cyklistický svet, autobusová zastávka.,table.detours, tiflografická mapa stanice, usmerňovacie dosky, inventár a projekt zelená, roboty dokončiť.)4.Nákup mestských bicyklov s vybavením,5.Promotional a informačný časopisProdukty (rok dosiahnutia-2018)•Lb konštrukcia. ZWP-3pcs.•Lb zariadenia „park a pohon“ – 3 ks.•Lb parkovacie miesta v zastavanom zariadení „parkovisko a pohon“ – 15ks.•Lb parkovacie miesta pre osoby so zdravotným postihnutím v zastavanom zariadení„park a pohon“ – 4ks.•Lb zabudované zariadenia „Bikeamp; ride“–3pcs•Lb nové/moderové svetelné body „Bikeamp;Ride“ – 100 ks.•Dlhá podporovaná infraštruktúra. bicykel.- 1,01 km•Lb akcie a propagačné kampane-1pcs•Lb nové/moderové svetelné body-10pcs. (Slovak)
    2 July 2022
    0 references
    Proj.realizo. se jkun parti minn 5 kompiti u se jinkludi l-kostruzzjoni ta’ 3 interskambji integrati (ZWP) minn infrastrukturą:1.Budowa ZWP fi Szamotuły (Xogħlijiet ta’ tħejjija u demolizzjoni, uċuħ minn K.granitowa, xarabank tal-bajja.,paski, dr.manewr.-1 056 m², parks Pamp;R(83msc inkluż 2għal żvantaġġi-1 047.5 m²), Bamp; R (60msc), kostruzzjoni tan-netwerk tal-kanal tax-xita., entries, toroq bike.-500 m², bankini-674 m², dawl-8pcs, passiġġier inf.-1pc., Dinjiet tar-rota, stop bus,tabl. dashboards, mappa finitura tal-istazzjon, pjanċi taċ-ċomb, aħdar tal-inventarju u tal-projezzjoni, robots finitura., kostruzzjoni superviżjoni).2.Kostruzzjoni tal-ZWP fil Souvenir (Rob.preparat. u demolizzjoni, uċuħ magħmula minn konkrit, dr. drive-840 m², parks Pamp; R (21 postijiet-345 m²),Bamp; R (20msc), Proj.with żona deidrazzjoni, bike triq.-412.5 m², walkway-43.75 m², mixi-vjaġġ-1 006.5 m², dawl-1pcs, abbord inf.passage., bike dinja., stop bus.,tabl.departments, mappa tiflografika ta ‘l-istazzjon, pjanċi gwida, inventarju u projezzjoni, xogħlijiet finitura.)3.Building ZPW fil Baborówk (Rob.preparation u demolizzjoni, 888 m², parkeġġ: Pamp; R(11msc, inklużi 2 għal b’diżabilità-147.5 m²), Bamp; R(20msc), proj.with deidratazzjoni taż-żona, triq bike-1 155 m², bankini, dawl-1pc,inf.passenger, dinja biċikletta, bus stop.,table.detours, mappatifografika tal-istazzjon, bordijiet gwida, inventarju u l-proġett aħdar, robots finitura.)4.Purchase ta ‘roti belt b’tagħmir,5.Il-ġurnal tal-promozzjoni u l-informazzjoni Produtturi (sena tal-kisba-2018)•Kostruzzjoni Lb. ZWP-3pcs.•Lb faċilitajiet“park and drive”-3pcs.•Spazji ta’ parkeġġ Lb fil-faċilitajiet mibnija “park and drive” 15pcs.•Spazji ta’ parkeġġ għal persuni b’diżabilità fil-faċilitajiet mibnija “park and drive”–4pcs.•Lb tal-faċilitajiet mibnija “Bikeamp; ride”-3pcs•Lb stands fil-faċilitajiet mibnija “Bikeamp;Ride”–100pcs.•Infrastruttura kbira appoġġjata. bike.- 1.01 km•Azzjonijiet Lb u kampanji ta’ promozzjoni-1pcs•Lb ġdid/moder. punti tad-dawl-10pcs. (Maltese)
    2 July 2022
    0 references
    Proj.realizo. fará parte de 5 tarefas e incluirá a construção de 3 intercâmbios integrados (ZWP) a partir de infrastrukturą:1.Budowa ZWP em Szamotuły (trabalhos de preparação e demolição, superfícies de K.granitowa, autocarro de baía.,paski,dr.manewr.-1 056 m², parques Pamp; R(83msc incluindo 2para desvantagens-1 047,5 m²), Bamp;R (60msc), reconstrução da rede de canais de chuva., entradas, estradas de bicicleta.-500 m², pavimentos-674 m², iluminação-8pcs, passageiros inf.-1pc., mundos de bicicleta, parada de Autocarros, tabl. dashboards, mapatiflográfico da estação, placas de chumbo,verdes de inventário e projeção, acabamento de robôs., supervisão de construção).2.Construção do ZWP em Souvenir (Rob.preparado. e demolição,superfícies feitas de concreto,dr. drive-840 m², Pamp;R parques(21 lugares-345 m²), Bamp; R (20msc), proj.com área de desidratação, bicicleta de estrada.-412,5 m², passarela-43,75 m², andar-viagem1006,5 m², iluminação-1pcs, bordo inf.passage., bicicleta mundial., parada de Autocarros., tabl.departments, mapa tiflográfico da estação, placas guia, inventário e projeção, acabamento de obras.)3.Building ZPW em Baborówk (Rob.preparação e demolição, 888 m²,parking:Pamp;R (11 msc, incluindo 2 para deficientes-147,5 m²), Bamp; R (20msc), proj.com desidratação da área, bicicleta de estrada-1 155 m², pavimentos, iluminação-1pc, inf.passageiro, mundo da bicicleta, parada de Autocarros.,table.detours, mapa tiflográfico da estação, placas guiadas, inventário e projeto verde, robôs terminar.)4.Comprar de bicicletas da cidade com equipamentos, 5.Promocional e jornal de informaçãoProdutos (ano de realização-2018)•Lb construção. ZWP-3pcs.•Lb instalações‘parque e drive’–3 pcs.•Lb lugares de parque nas instalações construídas ‘parque e drive’–15pcs.•Lb lugares de parque para pessoas com deficiência no parque de instalações construídas e drive‘–4pcs.•Lb das instalações construídas’Bikeamp; passeio"–3pcs•Lb está nas instalações construídas‘Bikeamp; Ride’–100pcs.•Infraestrutura suportada longa. bicicleta.- 1,01 km•Ações Lb e campanhas de promoção-1pcs•Lb novo/moder. pontos de luz-10pcs. (Portuguese)
    2 July 2022
    0 references
    Proj.realizo. on osa viittä tehtävää, ja siihen kuuluu kolmen integroidun vaihdon (ZWP) rakentaminen infrastrukturą:1.Budowa ZWP Szamotułyssa (valmistelu- ja purkutyöt, pinnat K.granitowasta, Bay bus.,paski,dr.manewr.-1 056 m², puistot Pamp;R(83msc mukaan lukien 2 tasoitus-1 047,5 m²), Bamp;R(60msc), sadekanavaverkon rekonstruointi., entries, pyörätiet.-500 m², jalkakäytävät-674 m², valaistus-8kpl, matkustaja inf.-1pc., pyörämaailmot, bussipysäkki, tabl. kojelautat, asemantiflografinen kartta, lyijylevyt, inventaario ja projektio vihreät, robottien viimeistely., rakennusvalvonta).2.ZWP: n rakentaminen matkamuistoihin (Rob.valmistettu ja purku, betonista valmistetut pinnat, dr. drive-840 m², Pamp;R-puistot (21 paikkaa-345 m²), Bamp;R(20msc),proj.with dehydration area, road bike.-412,5 m², kävelytie-43,75 m², kävely-travel-1 006,5 m², valaistus-1kpl, laiva inf.passage.,world bike.,bus stop.,tabl.departments,tiflographic kartta aseman, opaslevyt, inventaario ja projektio, töiden viimeistely.)3.Rakentaminen ZPW Baborówk (Rob.valmistelu ja purku, 888 m², parkkipaikka:Pamp;R(11msc, mukaan lukien 2 vammaisille-147,5 m²), Bamp;R(20msc),proj.with dehydration of the area,road bike-1 155 m², jalkakäytävät, valaistus-1pc, inf.passenger, polkupyörän maailma, bussipysäkki.,table.detours,tiflografinen kartta aseman, opastaulut, inventaario ja projektin vihreä, robotit viimeistely.)4.Osto kaupunkipyöriä laitteilla,5.Promotional and information journalTuotteet(saavutusten vuosi-2018)•Lb rakentaminen. ZWP-3pcs.•Lb facilities’park and drive’–3 kpl.•Lb-pysäköintipaikat rakennettujen tilojen puistossa ja asema- 15pcs.•Lb-pysäköintipaikat rakennetuissa tiloissa ”pysäköinti ja ajaminen”-4pcs.•Lb rakennettujen tilojen ’Bikeamp; ride”–3pcs•Lb seisoo rakennetuissa tiloissa’Bikeamp;Ride’–100pcs.•Pong tuettu infrastruktuuri. pyörä.- 1,01 km•Lb-toimet ja myynninedistämiskampanjat-1pcs•Lb uudet/moderi. valopisteet-10pcs. (Finnish)
    2 July 2022
    0 references
    Proj.realizo. bo del 5 nalog in bo vključeval gradnjo 3 integriranih izmenjav (ZWP) iz infrastrukturą:1.Budowa ZWP v Szamotułyju (priprava in rušenje, površine iz K.granitowa, zalivski avtobus.,paski,dr.manewr.-1 056 m², parki Pamp;R(83 msc, vključno z 2 za invalide-1 047,5 m²), Bamp;R(60msc),rekonstrukcija deževnega kanala omrežja.,entries, kolesarske ceste.-500 m², pločniki-674 m², razsvetljave-8pcs, Potnik inf.-1pc., Bike svetovi,bus stop, Tabl. armaturne plošče, Tiflografski zemljevid postaje, svinčene plošče, inventar in projekcija zelenice, izdelava ZWP v spominu (Rob. priprava in rušenje, površine iz betona,dr. pogon-840 m², Pamp;R parki (21 mest-345 m²), Bamp;R(20msc),proj. z dehidracijsko površino, cestno kolo.-412,5 m², pešpot-43,75 m², hoja-pot-1 006,5 m², razsvetljava-1pcs, krovu inf.passage.,World kolo.,bus postajališča,tabl.departments,tiflografski zemljevid postaje, vodilne plošče, inventar in projekcija, dela konča.)3.graditev ZPW v Baborówk (Rob.priparacija in rušenje, 888 m²,parkiranje:Pamp;R(11msc, vključno z 2za invalide 147,5 m²), Bamp;R(20msc),proj.z dehidracijo območja, cestno kolo-1 155 m², pločniki, osvetlitev-1pc,inf.potnik, kolesarski svet, avtobusno postajališče.,table.detours, tiflografski zemljevid postaje,vodilne deske,inventar in projekt zeleno, roboti končajo.)4.Nakup mestnih koles z opremo,5.Promocijski in informacijski časopisProducts(leto dosežka-2018)•Lb gradnja. ZWP-3pcs.•Lb parkirna mesta za invalide v zgrajenih objektih‚park and drive‘-3 kos.•Lb parkirna mesta za invalide v zgrajenih objektih‚park in pogon‘-4pcs.•Lb zgrajenih objektov„Bikeamp; vožnja"–3pcs•Lb stoji v grajenih objektih„Bikeamp;Ride’–100pcs.•Dolga podprta infrastruktura.- 1,01 km•Lb akcije in promocijske kampanje-1pcs•Lb nove/moder. svetlobne točke-10pcs. (Slovenian)
    2 July 2022
    0 references
    Proj.realizo. bude součástí 5 úkolů a bude zahrnovat výstavbu 3 integrovaných výměn (ZWP) z infrastrukturą:1.Budowa ZWP ve Szamotuły(Preparační a demoliční práce, povrchy z K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parky Pamp;R(83msc včetně 2pro handicapy-1 047,5 m²), Bamp;R(60msc),rekonstrukce sítě dešťových kanálů.,vstupy, cyklistické silnice.-500 m², chodníky-674 m², osvětlení-8ks, pasažér inf.-1pc.,bike světy, autobusová zastávka,tabl. dashboards, tiflografické mapy stanice, vedení desek, inventář a projekce zeleně, dokončení robotů.,výstavba ZWP v Souveniru (Rob.připraveno. a demolice,povrchy z betonu,dr. drive-840 m², Pamp;R parky(21 míst-345 m²),Bamp;R(20msc),proj. s dehydratační plochou, silniční kolo.-412,5 m², chodník-43,75 m², chůze-cestování-1 006,5 m², osvětlení-1ks, palubní inf.passage.,světové kolo., zastávka autobusu.,tabl.departments, tiflografické mapy stanice, vodicí desky, inventář a projekce, dokončení prací.)3.Budování ZPW v Baborówk(Rob. Příprava a demolice, 888 m²,parkování:Pamp;R(11msc, včetně 2 pro handicapované 145,5 m²), Bamp;R(20msc),proj.s dehydratací oblasti,road bike-1 155 m², chodníky,lighting-1ks,inf.passenger, cyklistický svět, autobusová zastávka.,table.detours,tiflographic map of the station,guiding boards,inventory and project green, roboti finish.)4.Výkup městských kol s vybavením,5.Propagační a informační deníkProdukty(rok úspěchů-2018)•Lb konstrukce. ZWP-3ks.•Lb zařízení’park a pohon’–3 ks.•Lb parkovací místa v parku a pohonu’–15pcs.•Lb parkovací místa pro osoby se zdravotním postižením v zastavěném zařízení’parku a pohon’–4ks.•Lb postavených zařízení„Bikeamp; jízda“–3ks•Lb stojí v zastavěném zařízení„Bikeamp; Ride’–100pcs.•Dlouhá podporovaná infrastruktura. kolo.- 1,01 km•Lb akce a propagační kampaně-1ks•Lb nové/moder. lehké body-10ks. (Czech)
    2 July 2022
    0 references
    Proj.realizo. bus 5 užduočių dalis ir apims 3 integruotų mainų (ZWP) statybą iš infrastrukturą:1.Budowa ZWP Szamotuły (parengimo ir griovimo darbai, paviršiai iš K.granitowa, įlanka autobusas.,paski,dr.manewr.-1 056 m², parkai Pamp;R(83msc įskaitant 2 neįgaliesiems-1 047,5 m²), Bamp;R(60msc), rekonstrukcija lietaus kanalų tinklą., įėjimai, dviračių keliai.-500 m², šaligatviai-674 m², apšvietimas-8pcs,keleivis inf.-1pc., Dviračių pasauliai, autobusų stotelė, TABL. prietaisų skydeliai, Tiflografinis žemėlapis stoties, švino plokštės, inventorius ir projekcijos žalumynai, robotų apdaila., statybos priežiūra).2. ZWP statyba suvenyruose (Rob.pared. ir griovimas, paviršiai iš betono,dr. drive-840 m², Pamp;R parkai(21 vieta – 345 m²),Bamp;R(20msc), proj.su dehidratacijos plotu, kelio dviratis.-412,5 m², pėsčiųjų takas-43,75 m², vaikščiojimas-kelionė-1 006,5 m², apšvietimas-1vnt, borto inf.passage., pasaulis dviratis., autobusų stotelė., tabl.departments, Tifl.departments, Tiflografinis žemėlapis stoties, kreipiamosios plokštės, inventorius ir projekcija, darbų apdaila.)3.Pastatymas ZPW Baborówk(Rob. paruošimas ir griovimas, 888 m², stovėjimo aikštelė:Pamp;R(11msc, įskaitant 2 neįgaliesiems-147,5 m²), Bamp;R(20msc),proj.su dehidratacija plotas, kelių dviratis-1 155 m², šaligatviai, apšvietimas-1pc,inf.passenger, dviračių pasaulis, autobusų stotelė.,table.detours, Tifografinis žemėlapis stoties, orientavimo lentos, inventorius ir projektas žalia, robotai apdaila.)4.Pirkimas miesto dviračių su įranga,5.Promocinis ir informacinis žurnalasProducts(metai pasiekimų-2018)•Lb statyba. ZWP-3pcs.•Lb įrenginiai’parkas ir pavara’-3 vnt.•Lb stovėjimo vietos pastatytuose įrenginiuose’parkas ir pavara’-15vnt.•Lb stovėjimo vietos neįgaliems asmenims pastatytuose įrenginiuose’parkas ir pavara’-4vnt.•Lb pastatytų įrenginių’Bikeamp; ride" – 3pcs•Lb stovi pastatytuose įrenginiuose’Bikeamp;Ride’-100pcs.•Ilgo palaikomos infrastruktūros.- 1,01 km•Lb veiksmai ir skatinimo kampanijos-1pcs•Lb. šviesos taškai-10pcs. (Lithuanian)
    2 July 2022
    0 references
    Proj.realizo. būs daļa no 5 uzdevumiem un ietvers 3 integrētu apmaiņas (ZWP) būvniecību no infrastrukturą:1.Budowa ZWP Szamotuły (Sagatavošanas un nojaukšanas darbi, virsmas no K.granitowa, lauru autobuss.,paski,dr.manewr.-1 056 m², parki Pamp;R(83msc ieskaitot 2 par nelabvēlīgiem apstākļiem-1 047,5 m²), Bamp;R(60msc), lietus kanālu tīkla rekonstrukcija., novietnes, velosipēdu ceļi.-500 m², brusas-674 m², apgaismojums-8pcs, pasažieru inf.-1pc., velosipēdu pasaulēm, autobusu pietura, tabl. infopaneļi, stacijas plāksnītes, svina plāksnes, inventāra un projekcijas zaļumi, roboti apdare., būvuzraudzība).2.ZWP būvniecība suvenīros (Rob.gatavots un nojaukšana,betona virsmas, dr. drive-840 m², Pamp;R parki(21 vieta-345 m²), Siena;R(20msc),proj.ar dehidratācijas platību, ceļa velosipēdu.-412,5 m², celiņš-43,75 m², pastaigu taka-1 006,5 m², apgaismojums-1gab, borta inf.passage., pasaules velosipēds., autobusu pietura., tabl.departmenti, stacijas plāksnītes, inventārs un projekcija, darbu apdare.) 3.Bilding ZPW in Baborówk (Rob.preparācija un nojaukšana, 888 m², autostāvvieta:Pamp;R(11msc, ieskaitot 2 invalīdiem-147,5 m²), Bamp;R(20msc),proj.ar dehidratāciju jomā, ceļa velosipēds-1 155 m², brusas, apgaismojums-1pc, inf.pasažieris, velosipēdu pasaule, autobusa pietura.,table.detours,tiflographic karte stacijas, vadošie dēļi, inventārs un projekts zaļš, roboti apdare.) 4.Purchase pilsētas velosipēdiem ar aprīkojumu, 5.Promotional un informācijas žurnālsProducts(gads sasniegums-2018)• Lb būvniecība. ZWP-3pcs.•Lb iekārtas“parks un disks”–3 gab.•Lb autostāvvietas iebūvēto iekārtu “parks un disks”–15 gab.•Lb stāvvietas invalīdiem iebūvēto iekārtu “parks un disks”–4 gab.•Lb no būvētajām iekārtām “Bikeamp; braukt”– 3 gab•Lb statīvi būvētajās telpās “Bikeamp; Ride”–100pcs.•Long atbalstītā infrastruktūra. velosipēds.- 1,01 km•Lb pasākumi un veicināšanas kampaņas-1pcs•Lb jauns/moder. gaismas punkti-10pcs. (Latvian)
    2 July 2022
    0 references
    Proj.realizo. ще бъде част от 5 задачи и ще включва изграждането на 3 интегрирани обмена (ZWP) от infrastrukturą:1.Budowa ZWP в Szamotuły (Подготовка и разрушаване, повърхности от K.granitowa, залив автобус.,paski,dr.manewr.-1 056 m², паркове Pamp;R(83msc включително 2 за увреждания-1 047,5 m²), Bamp;R(60msc), реконструкция на мрежата от дъждовни канали., входове, колоездачни пътища.-500 m², тротоари-674 m², осветление-8pcs, пътници inf.-1pc., велосипеди светове, автобусна спирка, табла. табла, тифлографска карта на станцията, водещи плочи, инвентаризация и проекционни зелени, роботи завършват., строителен надзор).2.Изграждане на ZWP в Сувенир (Rob. подготвени. и разрушаване, повърхности, изработени от бетон, д-р шофиране-840 m², Pamp;R паркове(21 места-345 m²), Bamp;R(20msc),proj. с площ за дехидратация, шосеен велосипед.-412,5 m², пешеходна пътека-43,75 m², пешеходно пътуване-1 006,5 m², осветление-1бр, бордови inf.passage., световен велосипед., автобусна спирка.,tabl.departments, тифлографска карта на станцията, указателни табели, инвентаризация и проекция, завършване на работите.)3.Строителство ZPW в Baborówk(Rob.препарат и разрушаване, 888 m², паркинг:Pamp;R(11msc, включително 2 за инвалиди-147,5 m²), Bamp;R(20msc),proj.proj.с дехидратация на района, пътно колело-1 155 m², тротоари, осветление-1pc, inf.passenger, велосипед свят, автобусна спирка.,table.detours, тифлографска карта на станцията, насочващи дъски, инвентаризация и проект зелено, роботи завърши.)4.Покупка на градски велосипеди с оборудване,5.Промоционални и информационни списанияПродукти (година на постижението-2018) •Lb строителство. ZWP-3pcs. •Lb места за паркиране и шофиране„–3 бр. •Lb паркоместа в изградените съоръжения' парк и задвижване'–15бр. •Lb паркоместа за хора с увреждания в изградените съоръжения' парк и шофиране'–4бр. •Lb на изградените съоръжения„Bikeamp; езда„–3pcs •Lb стои в изградените съоръжения„Bikeamp;Ride“–100pcs. •Дълга поддържана инфраструктура. — 1,01 km •Lb действия и промоционални кампании-1pcs •Lb new/moder. (Bulgarian)
    2 July 2022
    0 references
    A Proj.realizo. része lesz 5 feladatnak, és magában foglalja 3 integrált csomópont (ZWP) építését a infrastrukturą:1.Budowa ZWP-től Szamotułyban (előkészítési és bontási munkák, K.granitowa felületei, öbölbusz., paski, dr.manewr.-1 056 m², parkok Pamp;R(83 msc beleértve 2 a hátrány-1 047,5 m²), Bamp;R(60msc), rekonstrukciója az esőcsatorna hálózat., belépések, kerékpár utak.-500 m², járdák-674 m², világítás-8db, utas inf.-1db, kerékpár világok, buszmegálló, tabl. műszerfalak, tiflográfiai térkép az állomás, ólomlemezek, leltár és vetítés zöldek, robotok befejez., építési felügyelet).2.A ZWP építése Souvenirben (Rob.kész. és bontás, felületek betonból, dr. drive-840 m², Pamp;R parkok(21 férőhely-345 m²),Bamp;R(20msc), proj. dehidrációs terület, közúti kerékpár.-412,5 m², Walway-43,75 m², séta-travel-1 006,5 m², világítás-1db, fedélzeti inf.passage., világkerékpár., busz megálló., tabl.departments, teflográfiai térkép az állomásról, vezetőlemezek, leltár és vetítés, befejeződik.)3.ZPW építése Baborówkban(Rob. előkészítés és bontás, 888 m²,parkolás:Pamp;R(11msc, beleértve 2 a fogyatékkal élők számára-147,5 m²), Bamp;R(20msc),proj.a terület kiszáradásával, közúti kerékpár-1 155 m², járdák, világítás-1pc,inf.utas, kerékpár világ, buszmegálló.,table.detours, tiflográfiai térkép az állomásról, útmutató táblák, leltár és projekt zöld, robotok befejeződnek.)4. Városi kerékpárok beszerzése felszereléssel,5.Promotional és információs folyóiratTermékek(a teljesítmény éve-2018)•Lb építés. ZWP-3pcs.•Lb létesítmények parkja és vezetése 3 db.•Lb parkolóhelyek az épített létesítmények parkjában és vezetésében 15db.•Lb parkolóhelyek fogyatékkal élők számára az épített létesítmények parkjában és hajtásában -4pcs.•Az épített létesítmények’Bikeamp; ride" 3pcs•Lb áll az épített létesítményekben’Bikeamp;Ride’--100pcs.•Támogatott infrastruktúra.- 1,01 km•Lb akciók és promóciós kampányok-1pcs•Lb new/moder. light point-10dcs. (Hungarian)
    2 July 2022
    0 references
    Beidh an Proj.realizo mar chuid de 5 thasc agus áireofar leis tógáil 3 idirmhalartú comhtháite (ZWP) ó infrastrukturą:1.Budowa ZWP in Szamotuły (oibreacha ullmhúcháin agus scartála, dromchlaí ó K.granitowa, bus bá.,Paski,dr.manewr.-1 056 m², páirceanna Pamp;R(83msc lena n-áirítear 2 do mhíbhuntáistí-1 047.5 m²), BAMP; R(60msc), atógáil an líonra cainéal báistí., iontrálaithe, bóithre rothar.-500 m², cosáin-674 m², solas-8pcs, inf.-1pc paisinéirí., saol rothar, stad bus, Tabl. dashboards, léarscáil thflographic an stáisiúin, plátaí luaidhe, greens fardal agus teilgean, críochnaigh robots., maoirseacht tógála).2.Tógáil an ZWP i cuimhneacháin (Rob.prepared. agus scartáil, dromchlaí déanta as coincréit, tiomáint tiomáint-840 m², Pamp; páirceanna R(21 áiteanna-345 m²),BAMP;R(20msc), proj.with limistéar díhiodráitithe, rothar bóthair.-412.5 m², siúlbhealach-43.75 m², siúl-taisteal-1 006.5 m², soilsiú-1pcs, inf.passage ar bord., rothar domhanda., stad bus., Tabl.departments, léarscáil thalfagrafach an stáisiúin, plátaí treorach, fardal agus teilgean, bailchríoch oibreacha.)3.Tógáil ZPW i Baborówk (Rob.preparation agus scartáil, 888 m², páirceáil:Pamp;R(11msc, lena n-áirítear 2 do dhaoine faoi mhíchumas-147.5 m²),BAMP;R(20msc),proj.with dehydration an cheantair, rothar bóthair-1 155 m², cosáin, solas-1pc, inf.passenger, inf.passenger, domhan rothar, stad bus.,table.detours, léarscáil thflographic an stáisiúin, cláir treorach, fardal agus tionscadal glas, críochnaíonn robots.)4.Ceannach rothair cathrach le trealamh,5. Áiseanna ZWP-3pcs.•Lb ‘chlós agus tiomáint’ — 3 ríomhaire.•Lb spásanna páirceála i bpáirceáil agus tiomáint na n-áiseanna tógtha’–15pcs.•Lb spásanna páirceála do dhaoine faoi mhíchumas sna saoráidí tógtha ‘chlós agus tiomáint’ — 4pcs.•Lb de na saoráidí tógtha ‘Bikeamp; ride’ –3pcs•Lb seastáin sna saoráidí tógtha ‘Bikeamp;Ride’–100pcs.•Infreastruchtúr a dtugtar tacaíocht dó. rothar.- 1.01 km•Lb Gníomhaíochtaí agus feachtais chur chun cinn-1pcs•Lb new/moder. pointí solais-10pcs. (Irish)
    2 July 2022
    0 references
    Proj.realizo. kommer att ingå i 5 uppgifter och kommer att omfatta byggandet av 3 integrerade utbyten (ZWP)från infrastrukturą:1.Budowa ZWP i Szamotuły(Förberedelse- och rivningsarbeten, ytor från K.granitowa, bay bus.,paski,dr.manewr.-1 056 m², parker Pamp;R(83msc inklusive 2för handikapp-1 047,5 m²). Bamp;R(60msc),rekonstruktion av regnkanalnätet., varor, cykelvägar.-500 m², trottoarer-674 m², belysning-8st, passagerare inf.-1pc., cykelvärldar, busshållplats, tabl. instrumentpaneler,tiflografisk karta över stationen, blyplattor, inventering och projektionsgröna, robotar finish., konstruktionsövervakning).2.Konstruktion av ZWP i Souvenir (Rob.prepared. och rivning,ytor av betong, dr. drive-840 m², Pamp;R parker(21 platser-345 m²),Bamp;R(20msc),proj. med uttorkningsområde, vägcykel.-412,5 m², gångväg-43,75 m². gång-resa-1 006,5 m², belysning-1st, ombord inf.passage., världscykel., busshållplats.,tabl.departments,tiflografisk karta över stationen, styrplattor, inventering och projektion, arbete finish.)3.Byggning ZPW i Baborówk (Rob.preparation och rivning, 888 m², parkering:Pamp;R(11msc,inklusive 2för funktionshindrade-147,5 m²), Bamp;R(20msc),proj. med uttorkning av området, vägcykel-1 155 m², trottoarer, belysning-1pc,inf.passagerare, cykelvärld, busshållplats.,table.detours,tiflografisk karta över stationen, styrbrädor, inventering och projektgrön, robotar slut.)4.Inköp av stadscyklar med utrustning,5.Promotions- och informationstidskriftProdukter(år av prestation-2018)•Lb konstruktion. ZWP-3pcs.•Lb-anläggningarnas park och körning’–3 st.•Lb parkeringsplatser i de byggda anläggningarnas park och kör’-15st.•Lb parkeringsplatser för personer med funktionsnedsättning i den byggda anläggningens park och körning’–4pcs.•Lb i de byggda anläggningarna ”Bikeamp; ride”–3pcs•Lb står i de byggda anläggningarna ’Bikeamp;Ride’–100pcs.•Long understödd infrastruktur.- 1,01 km•Lb-åtgärder och marknadsföringskampanjer-1pcs•Lb nya/moder. (Swedish)
    2 July 2022
    0 references
    Proj.realizo. on osa viiest ülesandest ja hõlmab kolme integreeritud vahetuste (ZWP) ehitamist: infrastrukturą:1.Budowa ZWP Szamotułys (Ettevalmistus- ja lammutustööd, K.granitowa pinnad, lahe bus.,paski,dr.manewr.-1 056 m², pargid Pamp;R(83 msc, sealhulgas 2 puude puhul-1 047,5 m²), Bamp;R(60msc),ehitamine vihmakanali võrk., kanded, jalgrattateed.-500 m², kõnniteed 674 m², valgustamine-8pcs, sõitja inf.-1pc., mootorratta maailmad, bussipeatus,tabl. armatuurlauad,tiflograafiline kaart jaama, juhtivad plaadid, inventuuri ja projektsioon rohelised, robotite viimistlus., ehitusjärelevalve).2.ZWP ehitamine Suveniiris (Rob.valmistatud ja lammutus, betoonist valmistatud pinnad,dr. drive-840 m², Pamp;R pargid (21 kohta-345 m²),Bamp;R(20msc), proj. dehüdratsioonialaga, teeratas.-412,5 m², kõnnitee-43,75 m², jalutuskäik – 16,5 m², valgustus-1tk, pardasisene läbisõit.,world bike.,bus stop.,tabl.departments, jaamatiflograafiline kaart, juhtplaadid, inventuur ja projektsioon, tööde viimistlus.)3.Building ZPW Baborówkis (Rob.ettevalmistamine ja lammutamine, 888 m², parkimine:Pamp;R(11msc, kaasa arvatud 2 puuetega 147,5 m²), Bamp;R(20msc), proj.with dehüdratsioon ala,road bike-1 155 m², kõnniteed, valgustus-1pc,inf.passenger, jalgratta maailm, bussipeatus.,table.detours,tiflograafiline kaart jaama, giidi lauad, inventuuri ja projekti roheline, robotid viimistlus.)4.Uurimine linna jalgrattad seadmetega,5.Promotsionaalne ja infoajakiriProducts(aasta saavutus-2018)•Lb ehitus. ZWP-3pcs.•Lb rajatised’park ja drive’ –3 tk.•Lb parkimiskohad ehitatud rajatistes’park ja drive’-15pcs.•Lb parkimiskohad puuetega inimestele ehitatud rajatiste pargis ja sõita’–4tk.•Lb ehitatud rajatistest’Bikeamp; ride’–3pcs•Lb seisab ehitatud rajatistes’Bikeamp;Ride’–100pcs.•Pikk toetatud infrastruktuur. bike.- 1,01 km•Lb tegevused ja müügiedenduskampaaniad-1pcs•Lb uus/moder. valguspunktid-10pcs. (Estonian)
    2 July 2022
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: szamotulski
    0 references
    0 references

    Identifiers

    RPWP.03.03.03-30-0006/16
    0 references