(‎Created claim: summary (P836): Extension of provincial road No 971 in m. KrynicazZdrój, road class G, single-carriageway, 2lane. The total length of the sections covered by the extension is approximately 3.35 km. The extension will cover: section 010 km approx. 0 000 km approx. 3248Except for sections with bridges: section 010 km approx. 1888 1914 in Le Havre bridge 010 km approx. 3020 3051 of the bridge in the ‘Czarny PokkRange of works’ comprises the reconstruction of a bri...)
(‎Changed an Item)
Property / programme
 
Property / programme: Ma?opolskie Voivodeship - ERDF/ESF / rank
 
Normal rank

Revision as of 14:54, 26 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension of the DV 971 in m. Krynica — Zdrój
Project in Poland financed by DG Regio

    Statements

    0 references
    12,000,198.82 zloty
    0 references
    2,880,047.7168 Euro
    13 January 2020
    0 references
    15,160,198.85 zloty
    0 references
    3,638,447.724 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 August 2017
    0 references
    31 December 2019
    0 references
    WOJEWÓDZTWO MAŁOPOLSKIE
    0 references
    Rozbudowa drogi wojewódzkiej nr 971 w m. KrynicaZdrój, droga klasy G, jednojezdniowej, 2pasowej. Łączna długość odcinków objętych rozbudową wynosi około 3,35 km. Rozbudowa będzie obejmowała: odcinek 010 km ok. 0000 km ok. 3248Z wyłączeniem odcinków z obiektami mostowymi: odcinek 010 km ok. 1888 1914 mostu na cieku Hawrany odcinek 010 km ok. 3020 3051 mostu na cieku Czarny PotokZakres robót obejmuje przebudowę obiektu mostowego most w km 0084 na cieku Kryniczanka z odtworzeniem nośności do klasy min. B 40 ton oraz przebudowę 3 przepustów. Ponadto przewidziano przebudowę 2 skrzyżowań na skrzyżowania typu rondo.Podstawowe parametry techniczne drogi po przebudowie: klasa techniczna : G Kategoria ruchu: KR 3 szerokość pasa ruchu : 3,50 m szerokość jezdni : 7,00 m szerokość pasa ruchu dla pojazdów skręcających w lewo: 3,5 m ilość jezdni: 1 odwodnienie wraz z odprowadzeniem wody do odbiornikówW ramach przedmiotowej inwestycji przewidziano rozwiązania ponadstandardowe: zostanie zastosowana nawierzchnia o korzystnych właściwościach przeciwhałasowych odpornej na ruch pojazdów zaprzęgowych koni. Oznakowanie poziome wykonane zostanie jako grubowarstwowe chemoutwardzalne. Ponadto zastosowane zostaną urządzenia bezpieczeństwa ruchu bariery poziom intensywności zderzenia A. W projekcie docelowej organizacji ruchu i przy wykonywaniu oznakowania poziomego przewidziane zostaną punktowe elementy odblaskowe montowane w krawężnikach, odpowiednio barwy białej lub czerwonej, w szczególności na skrzyżowaniach typu rondo.Ponadto zastosowane zastanie niekonwencjonalne oznakowanie przejść dla pieszych na całym odcinku rozbudowy dodatkowe tło znaku D6 wykonane na tle z folii fluorescencyjnej żółtozielonej, natomiast w obrębie szkoły odc. 010 km ok. 2955 wykonane zostanie czerwone tło zebry, pasy poprzeczne wibracyjno akustyczne na dojeździe do przejścia, piktogram na jezdni. (Polish)
    0 references
    Extension of provincial road No 971 in m. KrynicazZdrój, road class G, single-carriageway, 2lane. The total length of the sections covered by the extension is approximately 3.35 km. The extension will cover: section 010 km approx. 0 000 km approx. 3248Except for sections with bridges: section 010 km approx. 1888 1914 in Le Havre bridge 010 km approx. 3020 3051 of the bridge in the ‘Czarny PokkRange of works’ comprises the reconstruction of a bridge structure in km 0084 on the guide of a Krynicanka with a load capacity up to a class B of 40 tonnes and the reconstruction of 3 culverts. In addition, provision is made for the upgrading of 2 intersections to the intersection between the roundabout and the main technical parameters of the road after the conversion: technical grade: G traffic category: KR 3 lane width: 3.50 m width of the road: 7.00 m width of the lane for the rear turn (s): 3.5 m number of carriageways: 1 dehydration plus transfer of water to receivers In the framework of the investment in question, the following standard solutions are foreseen: a surface will be used to determine the beneficial characteristics of noise resistance to the movement of vehicles from the equine species. The horizontal marking shall be performed as a thick-layer chemohardening. In addition, the traffic safety devices of the barrier level will be applied. in the target organisation of the traffic organisation and in the performance of the horizontal markings, the point reflective elements to be fitted in the kerbs, whether white or red, respectively, will be provided, in particular at the intersection between the type of the roundabout. in addition, the unconventional marking of pedestrian crossing points over the entire section of the extension of the extension of the additional background of the D6 mark built on the background of a yellow fluorescent foil over the whole of the extension section will be applied. 010 km approx. 2955, the red background of the zebra will be carried out, the lateral vibrations of the acoustic vibration on the passage for the passage, the pictogram on the road. (English)
    0 references

    Identifiers

    RPMP.07.01.01-12-0956/17
    0 references