Increase in capacity of the Collection Court of Rakovník (Q62708): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): In the context of the project “Increasing the capacity of the Collection Court Rakovník”, the Court will reconstruct and modernise the collection area, consisting of, in particular, an overlap of the existing surface area (consisting of road shows) of the bituminous surface, the construction of a driveway along the new ramps, the construction of a steel appliance hall, the perimeter fence and the acquisition of the security camera. the project w...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Environment - CZ - ERDF/CF / rank | |||
Normal rank |
Revision as of 08:26, 26 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase in capacity of the Collection Court of Rakovník |
Project in Czech Republic financed by DG Regio |
Statements
5,403,999.95 Czech koruna
0 references
6,357,647.0 Czech koruna
0 references
85 percent
0 references
22 December 2016
0 references
6 April 2018
0 references
16 April 2018
0 references
Město Rakovník
0 references
26901
0 references
V rámci projektu "Navýšení kapacity sběrného dvora Rakovník" bude provedena rekonstrukce a modernizace sběrného dvora, která bude spočívat zejména v překrytí stávající pojezdové plochy (tvořené silničními panely) živičným povrchem, vybudování nájezdové železobetonová rampy, přístavbě ocelové haly o sklad elektrospotřebičů, oplocení areálu a pořízení bezpečnostních kamer.Projekt bude realizován na poz. parc.č. 1644/1,1644/2,1644/11,1644/12,1644/13, 1644/14,1644/17,1644/18 a stavbách č. 3291,5590. (Czech)
0 references
In the context of the project “Increasing the capacity of the Collection Court Rakovník”, the Court will reconstruct and modernise the collection area, consisting of, in particular, an overlap of the existing surface area (consisting of road shows) of the bituminous surface, the construction of a driveway along the new ramps, the construction of a steel appliance hall, the perimeter fence and the acquisition of the security camera. the project will be carried out on poby.parc.1644/1,1644/2,1644/11,1644/12,1644/13,1644/14,1644/17,1644/18, and construction (English)
0 references
Identifiers
CZ.05.3.29/0.0/0.0/15_005/0000358
0 references