Installation of a photovoltaic power plant with a battery system and necessary modifications to the electrical distribution system in ZOD Tísek (Q16698): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Installation of a 50 kWp power station on the roof of the administrative object of the ZFROM Tísek and, at the same time, on the roof of workshops with a battery capacity of 28 kWh, to accumulate the generated electricity located within the understep administrative structure and the necessary modifications to the wiring of an administrative building — workshops, poharvest line and alterations to the trunk distribution of electricity at the Znojm...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Enterprise and Innovation for Competitiveness - CZ - ERDF / rank | |||
Normal rank |
Revision as of 23:45, 25 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of a photovoltaic power plant with a battery system and necessary modifications to the electrical distribution system in ZOD Tísek |
Project in Czech Republic financed by DG Regio |
Statements
1,938,418.4 Czech koruna
0 references
2,423,023.0 Czech koruna
0 references
80 percent
0 references
30 June 2020
0 references
Zemědělské obchodní družstvo Tísek
0 references
74301
0 references
Instalace fotovoltaické elektrárny o výkonu 50 kWp na střeše správního objektu ZOD Tísek a současně na střeše dílen s bateriovým systémem o výkonu 28 kWh k akumulaci vyrobené elektřiny umístěném v podkroví správního objektu a nezbytnými úpravami elektrorozvodů ve správní budově - dílny, posklizňové lince a úpravy páteřního rozvodu elektřiny v areálu ZOD Tísek s cílem rozvodu vyrobené energie z FVE a akumulované v bateriích po podnikatelském areálu ZOD Tísek a. (Czech)
0 references
Installation of a 50 kWp power station on the roof of the administrative object of the ZFROM Tísek and, at the same time, on the roof of workshops with a battery capacity of 28 kWh, to accumulate the generated electricity located within the understep administrative structure and the necessary modifications to the wiring of an administrative building — workshops, poharvest line and alterations to the trunk distribution of electricity at the Znojmo Tísek area, with a view to the distribution of energy produced from FVE and stored in batteries after the business site ZOD Tísek a. (English)
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_138/0011722
0 references