Children’s group — Babice nad Svitavou (Q55538): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project will operate a children group with a capacity of 12 children. The place of implementation of the project will be Babice nad Svitavod140, 664 01 and the expected opening hours will be from 8: 00 to 16: 00 hours. The construction phase will start from 1.7.2019 and will take place up to 31.8.2019, i.e. 2 months. As a result, the operational phase, which will last for 5 semester, will be starting from 1.9.2019, i.e. up to 28.2.2022. The...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Employment, Human Capital and Social Cohesion - CZ - ESF/YEI / rank | |||
Normal rank |
Revision as of 18:04, 25 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Children’s group — Babice nad Svitavou |
Project in Czech Republic financed by DG Regio |
Statements
3,026,890.8 Czech koruna
0 references
3,561,048.0 Czech koruna
0 references
85 percent
0 references
1 July 2019
0 references
28 February 2022
0 references
Obec Babice nad Svitavou
0 references
66401
0 references
V rámci projektu bude provozována dětská skupina s kapacitou 12 dětí. Místem realizace projektu bude adresa Babice nad Svitavou 140, 664 01 a předpokládaná otevírací doba bude od 8:00 do 16:00 hod. Fáze vybudování bude zahájena od 1.7.2019 a bude probíhat až do 31.8.2019, tedy 2 měsíce. Následně bude od 1.9.2019 zahájena provozní fáze, která potrvá 5 pololetí, tedy do 28.2.2022. Zařízení bude určeno pro širokou veřejnost a bude provozováno na základě zákona o dětské skupině. (Czech)
0 references
The project will operate a children group with a capacity of 12 children. The place of implementation of the project will be Babice nad Svitavod140, 664 01 and the expected opening hours will be from 8: 00 to 16: 00 hours. The construction phase will start from 1.7.2019 and will take place up to 31.8.2019, i.e. 2 months. As a result, the operational phase, which will last for 5 semester, will be starting from 1.9.2019, i.e. up to 28.2.2022. The facility will be addressed to the general public and will be operated under the Child Group Act. (English)
0 references
Identifiers
CZ.03.1.51/0.0/0.0/19_111/0014186
0 references