Improving energy efficiency in U.Z.S STYL DOOR through the use of RES energy (Q4419654): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Bialski / rank
 
Normal rank

Revision as of 23:18, 27 October 2022

Project Q4419654 in Poland
Language Label Description Also known as
English
Improving energy efficiency in U.Z.S STYL DOOR through the use of RES energy
Project Q4419654 in Poland

    Statements

    0 references
    0 references
    148,200.0 zloty
    0 references
    32,944.86 Euro
    0 references
    228,000.0 zloty
    0 references
    50,684.4 Euro
    0 references
    65.0 percent
    0 references
    1 October 2022
    0 references
    30 September 2023
    0 references
    ROBERT ZABIELSKI U.Z.S STYL DRZWI
    0 references
    0 references

    51°35'54.28"N, 22°55'50.38"E
    0 references
    Przedmiotem zamówienia jest rozbudowa instalacji fotowoltaicznej o łącznej mocy moc 68,04 kWp, zlokalizowanej przy ul. Wojska Polskiego 19 w Parczewie, do wytwarzania energii elektrycznej z energii słonecznej o mocy wraz z systemem zarządzania wykorzystującym TIK. Parametry TIK: niezależny inteligentny system monitorowania i zarządzania on-line instalacją; fotowoltaiczną, wyposażony w moduł komunikacyjny ; analiza pracy systemu PV, która poprzez dedykowany program lub stronę www dostarcza informacji nt.: ilości wyprodukowanej energii w danym okresie, danych historycznych dotyczących produkcji energii, wykrytych wad i usterek o elektrycznych parametrów pracy systemu; Projekt realizowany będzie od października 2022 do sierpnia 2023 roku ( rzeczowe zakończenie projektu). Jest gotowy do wdrożenia. (Polish)
    0 references
    The subject of the contract is the extension of the photovoltaic installation with a total capacity of 68.04 kWp, located at ul. Polish Army 19 in Parczew, to generate electricity from solar power with a management system using ICT. Parameters of ICT: an independent intelligent on-line monitoring and management system; photovoltaic, equipped with a communication module; analysis of the work of the PV system, which through a dedicated program or website provides information on: the amount of energy produced during the period, historical data on energy production, detected defects and faults with the electrical performance of the system; The project will be implemented from October 2022 to August 2023 (actual completion of the project). He’s ready to implement. (English)
    21 October 2022
    0 references
    The subject of the contract is the extension of the photovoltaic installation with a total capacity of 68.04 kWp, located at ul. Polish Army 19 in Parczew, to generate electricity from solar power with a management system using ICT. Parameters of ICT: an independent intelligent on-line monitoring and management system; photovoltaic, equipped with a communication module; analysis of the work of the PV system, which through a dedicated program or website provides information on: the amount of energy produced during the period, historical data on energy production, detected defects and faults with the electrical performance of the system; The project will be implemented from October 2022 to August 2023 (actual completion of the project). He’s ready to implement. (English)
    0 references
    WOJ.: LUBELSKIE, POW.: parczewski
    0 references
    0 references

    Identifiers

    RPLU.15.01.00-06-0226/22
    0 references