Construction and modernisation of the SN network together with the replacement of transformers enabling the connection of new units of electricity generation from renewable sources located in the Toruń Branch of ENERGA-OPERATOR SA (Q98129): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Włocławski / rank
 
Normal rank

Revision as of 23:02, 27 October 2022

Project Q98129 in Poland
Language Label Description Also known as
English
Construction and modernisation of the SN network together with the replacement of transformers enabling the connection of new units of electricity generation from renewable sources located in the Toruń Branch of ENERGA-OPERATOR SA
Project Q98129 in Poland

    Statements

    0 references
    18,115,049.45 zloty
    0 references
    4,026,975.49 Euro
    13 January 2020
    0 references
    28,514,165.69 zloty
    0 references
    6,338,699.03 Euro
    13 January 2020
    0 references
    63.53 percent
    0 references
    4 December 2017
    0 references
    30 November 2020
    0 references
    ENERGA-OPERATOR SA
    0 references
    0 references

    52°48'56.45"N, 19°10'10.92"E
    0 references

    52°34'25.61"N, 18°35'49.24"E
    0 references

    53°4'20.68"N, 19°26'23.50"E
    0 references

    52°33'24.05"N, 19°2'30.66"E
    0 references
    Projekt zakłada modernizację, budowę i przebudowę linii elektroenergetycznych średniego napięcia (SN) oraz modernizację Głównych Punktów Zasilania (GPZ) w celu wymiany transformatorów WN/SN na terenie działania ENERGA-OPERATOR SA Oddział w Toruniu. Projekt obejmuje 9 zadań inwestycyjnych planowanych do realizacji w latach 2017-2020 na terenie woj. kujawsko-pomorskiego, na obszarze gmin: Dobre, Osięciny, Radziejów, Piotrków Kujawski, Skępe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo i Włocławek. Zakres rzeczowy Projektu obejmuje:- budowę nowych linii kablowych SN oraz wymianę starych napowietrznych przewodów elektroenergetycznych nieizolowanych na istniejących liniach i odgałęzieniach SN 15 kV na nowe, izolowane lub niepełnoizolowane, rozbiórki starych napowietrznych linii SN, wymianę słupów, wymianę odłączników słupowych na rozłączniki,- modernizację stacji GPZ polegającą na wymianę transformatorów na transformatory o większej mocy wraz z niezbędnymi pracami towarzyszącymi.Projekt zwiększy potencjał dla przyłączenia nowych jednostek wytwórczych energii elektrycznej z OZE w sposób zapewniający bezpieczeństwo funkcjonowania sieci elektroenergetycznych i zwiększając ich odporność na niekorzystne oddziaływania środowiskowe. Łączna długość nowobudowanych sieci elektroenergetycznych SN 15 kV wyniesie 3,400 km, a długość modernizowanych sieci wyniesie 96,777 km. Zakres zadań Projektu obejmuje także wymianę 8 transformatorów WN/SN z pracami towarzyszącymi w GPZ Radziejów, Piotrków Kujawski, Lipno i Rypin. Modernizacja i rozbudowa sieci dystrybucyjnych pozwala na poprawę niezawodności zasilania, w tym obniżenie ilości i czasu trwania awaryjnych przerw w dostawach, redukcję strat energii elektrycznej w sieciach oraz rozszerza możliwości rozwoju energetyki rozproszonej wykorzystującej lokalne źródła energii w szczególności pochodzącej z OZE. W wyniku realizacji Projektu dodatkowa zdolność przyłączania nowych mocy OZE do sieci elektroenergetycznej wyniesie 37,23 MW. (Polish)
    0 references
    The project involves the modernisation, construction and reconstruction of medium voltage power lines (SN) and the modernisation of the Main Power Points (GPZ) in order to replace WN/SN transformers on the site of the operation of ENERGA-OPERATOR SA Branch in Toruń. The project covers 9 investment tasks planned to be carried out in the years 2017-2020 in the Kujawsko-Pomorskie Voivodeship, in the area of communes: Good, Osięciny, Radziejów, Piotrków Kujawski, Skępe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo and Włocławek. The scope of the Project includes:- construction of new cable lines SN and replacement of old overhead power cables not isolated on existing lines and branches SN 15 kV for new, insulated or insulated, demolition of old overhead power lines SN, exchange of columns, exchange of columns for disconnectors,- modernisation of the GPZ station consisting of replacement of transformers with the necessary power transformers. The total length of the newly built power grids SN 15 kV will be 3.400 km and the length of the upgraded networks will be 96.777 km. The scope of tasks of the Project also includes the exchange of 8 WN/SN transformers with accompanying works in the GPZ Radziejów, Piotrków Kujawski, Lipno and Rypin. The modernisation and expansion of distribution networks improves the reliability of power, including reduction of the number and duration of emergency supply interruptions, reduction of electricity losses in grids and expands the possibility of developing distributed energy sources using local energy sources in particular from RES. As a result of the project, the additional capacity to connect new RES power to the power grid will be 37.23 MW. (English)
    15 October 2020
    0 references
    Le projet comprend la modernisation, la construction et la reconstruction de lignes électriques à moyenne tension (SN) et la modernisation des points d’alimentation principaux (GPZ) afin de remplacer les transformateurs WN/SN sur le territoire de la branche ENERGA-OPERATOR SA à Toruń. Le projet comprend 9 projets d’investissement prévus pour 2017-2020 dans la voïvodie de Kujawsko-Pomorskie, dans la zone des communes: Good, Seeds, Radajów, Piotrków Kujawski, Skępe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo et Włocławek. Le champ d’application matériel du projet comprend:- la construction de nouvelles lignes de câbles SN et le remplacement d’anciennes lignes aériennes non isolées sur les lignes et branches existantes de 15 kV par de nouvelles, isolées ou non isolées, la démolition des anciennes lignes aériennes de SN, le remplacement des poteaux, l’échange de déconnexeurs de pôles pour les déconnexeurs,- la modernisation de la station GPZ consistant à remplacer les transformateurs pour les transformateurs d’énergie plus élevés ainsi que les travaux d’accompagnement nécessaires. La longueur totale des réseaux électriques nouvellement construits SN 15 kV sera de 3,400 km et la longueur des réseaux modernisés sera de 96,777 km. Les tâches du projet comprennent également l’échange de 8 transformateurs WN/SN avec des travaux d’accompagnement dans le GPZ Radziejów, Piotrków Kujawski, Lipno et Rypin. La modernisation et l’extension des réseaux de distribution permettent d’améliorer la fiabilité de l’alimentation électrique, notamment en réduisant le nombre et la durée des interruptions d’urgence, en réduisant les pertes d’électricité dans les réseaux et en élargissant les possibilités de développement de l’énergie distribuée utilisant des sources d’énergie locales, en particulier à partir de sources d’énergie renouvelables. À la suite du projet, la capacité supplémentaire de raccordement de la nouvelle capacité SER au réseau électrique sera de 37,23 MW. (French)
    1 December 2021
    0 references
    Das Projekt umfasst die Modernisierung, den Bau und den Wiederaufbau von Mittelspannungsleitungen (SN) und die Modernisierung der Hauptstromstellen (GPZ), um die WN/SN-Transformatoren auf dem Gebiet der ENERGA-OPERATOR SA-Niederlassung in Toruń zu ersetzen. Das Projekt umfasst neun Investitionsvorhaben, die 2017-2020 in der Woiwodschaft Kujawsko-Pomorskie im Gebiet der Gemeinden durchgeführt werden sollen: Gut, Samen, Radajów, Piotrków Kujawski, Skępe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo und Włocławek. Der materielle Anwendungsbereich des Projekts umfasst:- den Bau neuer SN-Kabelleitungen und die Ersetzung alter Oberleitungsleitungen, die nicht auf bestehenden 15 kV Leitungen und Zweigen isoliert sind, durch neue, isolierte oder nicht isolierte, alte Oberleitungsleitungen von SN, Austausch von Polentrennleitungen für Trennleitungen, Modernisierung des GPZ-Bahnhofs, bestehend aus dem Austausch von Transformatoren für höhere Stromtransformatoren und den notwendigen Begleitarbeiten. Das Projekt wird das Potenzial für den Anschluss neuer Stromerzeugungsanlagen mit RES erhöhen, um die Sicherheit des Betriebs von Stromnetzen zu gewährleisten und deren Widerstandsfähigkeit gegenüber negativen Umwelteinflüssen zu erhöhen. Die Gesamtlänge der neu gebauten Stromnetze SN 15 kV beträgt 3,400 km und die Länge der ausgebauten Netze 96,777 km. Zum Aufgabenbereich des Projekts gehört auch der Austausch von 8 WN/SN Transformatoren mit begleitenden Arbeiten im GPZ Radziejów, Piotrków Kujawski, Lipno und Rypin. Die Modernisierung und der Ausbau der Verteilernetze ermöglichen es, die Verlässlichkeit der Stromversorgung zu verbessern, u. a. die Anzahl und Dauer der Notunterbrechungen zu verringern, die Stromverluste in den Netzen zu verringern und die Möglichkeiten für die Entwicklung dezentraler Energie aus lokalen Energiequellen, insbesondere aus erneuerbaren Energiequellen, zu erweitern. Als Ergebnis des Projekts wird die zusätzliche Kapazität für den Anschluss neuer EE-Kapazitäten an das Stromnetz 37,23 MW betragen. (German)
    7 December 2021
    0 references
    Het project omvat modernisering, bouw en wederopbouw van middenspanningsleidingen (SN) en modernisering van de hoofdaandrijfpunten (GPZ) ter vervanging van WN/SN-transformatoren op het grondgebied van ENERGA-OPERATOR SA-afdeling in Toruń. Het project omvat 9 investeringsprojecten die in 2017-2020 in het woiwodschap Kujawsko-Pomorskie zullen worden uitgevoerd, in het gebied van gemeenten: Goed, Zaden, Radajów, Piotrków Kujawski, Skępe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo en Włocławek. Het materiële toepassingsgebied van het project omvat:- de bouw van nieuwe SN-kabellijnen en de vervanging van oude bovengrondse stroomleidingen die niet geïsoleerd zijn op bestaande 15 kV-lijnen en takken met nieuwe, geïsoleerde of niet-geïsoleerde, sloop van oude bovengrondse lijnen van SN, vervanging van palen, uitwisseling van polen voor ontkoppelingen,- modernisering van het GPZ-station bestaande uit het vervangen van transformatoren voor hogere vermogenstransformatoren samen met de nodige begeleidende werken. Het project zal het potentieel vergroten om nieuwe elektriciteitsproductie-eenheden met RES te verbinden op een manier die de veiligheid van de werking van elektriciteitsnetwerken waarborgt en hun veerkracht tegen negatieve milieueffecten verhoogt. De totale lengte van de nieuw gebouwde elektriciteitsnetten SN 15 kV zal 3,400 km bedragen en de lengte van de verbeterde netwerken zal 96,777 km bedragen. De taken van het project omvatten ook de uitwisseling van 8 WN/SN-transformatoren met bijbehorende werken in de GPZ Radziejów, Piotrków Kujawski, Lipno en Rypin. De modernisering en uitbreiding van de distributienetten maakt het mogelijk de betrouwbaarheid van de energievoorziening te verbeteren, onder meer door het aantal en de duur van noodonderbrekingen te verminderen, het elektriciteitsverlies in de netten te verminderen en de mogelijkheden voor de ontwikkeling van gedistribueerde energie met behulp van lokale energiebronnen, met name uit hernieuwbare energiebronnen, uit te breiden. Als gevolg van het project zal de extra capaciteit om nieuwe RES-capaciteit aan te sluiten op het elektriciteitsnet 37,23 MW bedragen. (Dutch)
    17 December 2021
    0 references
    Il progetto prevede l'ammodernamento, la costruzione e la ricostruzione di linee elettriche a media tensione (SN) e l'ammodernamento dei principali punti di alimentazione (GPZ) al fine di sostituire i trasformatori WN/SN sul territorio della filiale ENERGA-OPERATOR SA a Toruń. Il progetto comprende 9 progetti di investimento previsti per il periodo 2017-2020 nel voivodato di Kujawsko-Pomorskie, nella zona dei comuni: Good, Seeds, Radajów, Piotrków Kujawski, Skępe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo e Włocławek. L'ambito materiale del progetto comprende:- la costruzione di nuove linee di cavi SN e la sostituzione di vecchie linee elettriche aeree non isolate su linee e rami esistenti da 15 kV con nuove, coibentate o non isolate, demolizione di vecchie linee aeree di SN, sostituzione di pali, scambio di sezionatori di pali per sezionatori,- ammodernamento della stazione GPZ che consiste nella sostituzione dei trasformatori per trasformatori di potenza superiori e dei necessari lavori di accompagnamento. Il progetto aumenterà la possibilità di collegare nuove unità di generazione di energia con FER in modo da garantire la sicurezza del funzionamento delle reti elettriche e aumentarne la resilienza agli impatti ambientali negativi. La lunghezza totale delle reti elettriche di nuova costruzione SN 15 kV sarà di 3,400 km e la lunghezza delle reti potenziate sarà di 96,777 km. L'ambito dei compiti del progetto comprende anche lo scambio di trasformatori 8 WN/SN con lavori di accompagnamento in GPZ Radziejów, Piotrków Kujawski, Lipno e Rypin. L'ammodernamento e l'espansione delle reti di distribuzione consentono di migliorare l'affidabilità dell'alimentazione elettrica, tra cui la riduzione del numero e della durata delle interruzioni di emergenza, la riduzione delle perdite di energia elettrica nelle reti e l'ampliamento delle possibilità di sviluppo dell'energia distribuita utilizzando fonti energetiche locali, in particolare da fonti energetiche rinnovabili. A seguito del progetto, la capacità supplementare di collegare nuove capacità FER alla rete elettrica sarà di 37,23 MW. (Italian)
    16 January 2022
    0 references
    El proyecto consiste en la modernización, construcción y reconstrucción de las líneas eléctricas de media tensión (SN) y la modernización de los principales puntos de energía (GPZ) con el fin de sustituir a los transformadores WN/SN en el territorio de la sucursal ENERGA-OPERATOR SA en Toruń. El proyecto incluye nueve proyectos de inversión previstos para 2017-2020 en el Voivodato de Kujawsko-Pomorskie, en el área de los municipios: Good, Seeds, Radajów, Piotrków Kujawski, Skępe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo y Włocławek. El alcance material del proyecto incluye:- la construcción de nuevas líneas de cable SN y la sustitución de viejas líneas aéreas de energía no aisladas en líneas y ramas existentes de 15 kV por nuevas, aisladas o no aisladas, demolición de viejas líneas aéreas de SN, sustitución de postes, intercambio de desconectadores de polos para desconectadores, modernización de la estación GPZ consistente en sustituir transformadores por transformadores de mayor potencia junto con las obras de acompañamiento necesarias. La longitud total de las redes eléctricas recién construidas SN 15 kV será de 3,400 km y la longitud de las redes mejoradas será de 96,777 km. El alcance de las tareas del proyecto también incluye el intercambio de 8 transformadores WN/SN con obras de acompañamiento en los GPZ Radziejów, Piotrków Kujawski, Lipno y Rypin. La modernización y expansión de las redes de distribución permite mejorar la fiabilidad del suministro eléctrico, lo que incluye la reducción del número y la duración de las interrupciones de emergencia, la reducción de las pérdidas de electricidad en las redes y la ampliación de las posibilidades de desarrollo de la energía distribuida utilizando fuentes de energía locales, en particular a partir de fuentes de energía renovables. Como resultado del proyecto, la capacidad adicional para conectar nueva capacidad de FER a la red eléctrica será de 37,23 MW. (Spanish)
    20 January 2022
    0 references
    Projektet omfatter modernisering, opførelse og ombygning af mellemspændingsledninger (SN) og modernisering af hovedkraftværkerne (GPZ) med henblik på at erstatte WN/SN-transformere på stedet for driften af ENERGA-OPERATOR SA Branch i ToruÅ. Projektet dækker 9 planlagte investeringsopgaver i årene 2017-2020 i Kujawsko-Pomorskie Voivodeship på kommunalområdet: Godt, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo og WÅocÅawek. Projektets anvendelsesområde omfatter:- opførelse af nye kabellinjer SN og udskiftning af gamle luftledninger, der ikke er isoleret på eksisterende linjer og grene SN 15 kV til nye, isolerede eller isolerede, nedrivning af gamle luftledninger SN, udveksling af kolonner, udskiftning af kolonner til afbrydere, modernisering af GPZ-stationen bestående af udskiftning af transformere med de nødvendige effekttransformere. Den samlede længde af de nybyggede elnet SN 15 kV vil være 3,400 km og længden af de opgraderede net vil være 96,777 km. Projektets opgaver omfatter også udveksling af 8 WN/SN transformere med tilhørende arbejder i GPZ Radziejów, Piotrków Kujawski, Lipno og Rypin. Moderniseringen og udvidelsen af distributionsnettene forbedrer energiens pålidelighed, herunder reduktion af antallet og varigheden af nødforsyningsafbrydelser, reduktion af eltab i nettene og øger muligheden for at udvikle distribuerede energikilder ved hjælp af lokale energikilder, navnlig fra vedvarende energikilder. Som følge af projektet vil den yderligere kapacitet til at forbinde ny VE-strøm til elnettet være 37,23 MW. (Danish)
    26 July 2022
    0 references
    Το έργο αφορά τον εκσυγχρονισμό, την κατασκευή και την ανακατασκευή ηλεκτρικών γραμμών μέσης τάσης (SN) και τον εκσυγχρονισμό των κύριων σημείων ηλεκτρικής ενέργειας (GPZ) με σκοπό την αντικατάσταση των μετασχηματιστών WN/SN στον χώρο λειτουργίας του υποκαταστήματος ENERGA-OPERATOR SA στο ToruÅ. Το έργο καλύπτει 9 επενδυτικά καθήκοντα που προβλέπεται να εκτελεστούν κατά την περίοδο 2017-2020 στο βοεβοδάτο Kujawsko-Pomorskie, στον τομέα των κοινοτήτων: Καλό, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo και WÅocÅawek. Το πεδίο εφαρμογής του έργου περιλαμβάνει:- την κατασκευή νέων καλωδίων SN και την αντικατάσταση παλαιών εναέριων καλωδίων τροφοδοσίας που δεν έχουν απομονωθεί σε υφιστάμενες γραμμές και κλάδους SN 15 kV για νέες, μονωμένες ή μονωμένες, κατεδάφιση παλαιών εναέριων γραμμών ισχύος SN, ανταλλαγή στηλών, ανταλλαγή στηλών για αποσυνδέσεις,- εκσυγχρονισμός του σταθμού GPZ που συνίσταται στην αντικατάσταση μετασχηματιστών με τους απαραίτητους μετασχηματιστές ισχύος. Το συνολικό μήκος των νεόδμητων δικτύων ηλεκτρικής ενέργειας SN 15 kV θα είναι 3,400 km και το μήκος των αναβαθμισμένων δικτύων θα είναι 96,777 km. Το πεδίο των εργασιών του έργου περιλαμβάνει επίσης την ανταλλαγή 8 μετασχηματιστών WN/SN με συνοδευτικά έργα στο GPZ Radziejów, Piotrków Kujawski, Lipno και Rypin. Ο εκσυγχρονισμός και η επέκταση των δικτύων διανομής βελτιώνει την αξιοπιστία της ηλεκτρικής ενέργειας, συμπεριλαμβανομένης της μείωσης του αριθμού και της διάρκειας των διακοπών εφοδιασμού έκτακτης ανάγκης, της μείωσης των απωλειών ηλεκτρικής ενέργειας στα δίκτυα και διευρύνει τη δυνατότητα ανάπτυξης κατανεμημένων πηγών ενέργειας με χρήση τοπικών πηγών ενέργειας, ιδίως από ΑΠΕ. Ως αποτέλεσμα του έργου, η πρόσθετη ικανότητα σύνδεσης νέας ηλεκτρικής ενέργειας από ΑΠΕ στο δίκτυο ηλεκτρικής ενέργειας θα είναι 37,23 MW. (Greek)
    26 July 2022
    0 references
    Projekt uključuje modernizaciju, izgradnju i rekonstrukciju srednjenaponskih vodova (SN) i modernizaciju glavnih energetskih točaka (GPZ) kako bi se zamijenili WN/SN transformatori na lokaciji rada podružnice ENERGA-OPERATOR SA u Toružu. Projekt obuhvaća 9 investicijskih poslova planiranih za razdoblje 2017. – 2020. u Kujawsko-pomeranskom vojvodstvu, na području općina: Dobro, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo i WÅocÅawek. Opseg projekta uključuje:- izgradnju novih kabelskih vodova SN i zamjenu starih nadzemnih električnih kabela koji nisu izolirani na postojećim vodovima i granama SN 15 kV za nove, izolirane ili izolirane rušenje starih nadzemnih električnih vodova SN, zamjenu stupova, zamjenu stupova za rastavljače,- modernizaciju GPZ stanice koja se sastoji od zamjene transformatora potrebnim energetskim transformatorima. Ukupna duljina novoizgrađenih elektroenergetskih mreža SN 15 kV bit će 3,400 km, a duljina nadograđenih mreža 96,777 km. Opseg zadataka projekta uključuje i razmjenu 8 WN/SN transformatora s pratećim radovima u GPZ Radziejów, Piotrków Kujawski, Lipno i Rypin. Modernizacijom i širenjem distribucijskih mreža poboljšava se pouzdanost električne energije, uključujući smanjenje broja i trajanja prekida opskrbe u hitnim slučajevima, smanjenje gubitaka električne energije u mrežama i proširuje mogućnost razvoja distribuiranih izvora energije korištenjem lokalnih izvora energije, posebno iz obnovljivih izvora energije. Kao rezultat projekta, dodatni kapacitet za spajanje nove energije iz obnovljivih izvora na električnu mrežu iznosit će 37,23 MW. (Croatian)
    26 July 2022
    0 references
    Proiectul presupune modernizarea, construirea și reconstrucția liniilor electrice de medie tensiune (SN) și modernizarea principalelor puncte energetice (GPZ) în vederea înlocuirii transformatoarelor WN/SN pe amplasamentul funcționării filialei ENERGA-OPERATOR SA din ToruÅ. Proiectul acoperă 9 sarcini de investiții planificate pentru anii 2017-2020 în Voievodatul Kujawsko-Pomorskie, în zona comunelor: Bun, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo și WÅocÅawek. Domeniul de aplicare al proiectului include:- construirea de noi linii de cablu SN și înlocuirea cablurilor electrice aeriene vechi care nu sunt izolate pe liniile și ramurile existente SN 15 kV pentru noi, izolate sau izolate, demolarea liniilor electrice aeriene vechi SN, schimbul de coloane, schimbul de coloane pentru deconectoare,- modernizarea stației GPZ constând în înlocuirea transformatoarelor cu transformatoarele de putere necesare. Lungimea totală a rețelelor electrice nou construite SN 15 kV va fi de 3,44 km, iar lungimea rețelelor modernizate va fi de 96,777 km. Domeniul de aplicare a sarcinilor proiectului include, de asemenea, schimbul de 8 transformatoare WN/SN cu lucrări însoțitoare în GPZ Radziejów, Piotrków Kujawski, Lipno și Rypin. Modernizarea și extinderea rețelelor de distribuție îmbunătățește fiabilitatea energiei electrice, inclusiv reducerea numărului și a duratei întreruperilor aprovizionării în situații de urgență, reducerea pierderilor de energie electrică în rețele și extinde posibilitatea de a dezvolta surse de energie distribuite utilizând surse locale de energie, în special din surse locale de energie. Ca urmare a proiectului, capacitatea suplimentară de a conecta noua energie din surse regenerabile la rețeaua electrică va fi de 37,23 MW. (Romanian)
    26 July 2022
    0 references
    Projekt zahŕňa modernizáciu, výstavbu a rekonštrukciu vedení stredného napätia (SN) a modernizáciu hlavných napájacích bodov (GPZ) s cieľom nahradiť transformátory WN/SN na mieste prevádzkovania pobočky ENERGA-OPERATOR SA v ToruÅ. Projekt zahŕňa 9 investičných úloh plánovaných na roky 2017 – 2020 v Kujawsko-pomoranskom vojvodstve v oblasti obcí: Dobrý, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo a WÅocÅawek. Rozsah projektu zahŕňa:- výstavbu nových káblových vedení SN a výmenu starých nadzemných elektrických káblov, ktoré nie sú izolované na existujúcich vedeniach a odbočovačoch SN 15 kV za nové, izolované alebo izolované, demolácie starých nadzemných vedení SN, výmena stĺpov, výmena stĺpov pre odpojovače,- modernizácia stanice GPZ spočívajúca v výmene transformátorov za potrebné výkonové transformátory. Celková dĺžka novovybudovaných elektrických sietí SN 15 kV bude 3,400 km a dĺžka modernizovaných sietí bude 96,777 km. Rozsah úloh projektu zahŕňa aj výmenu 8 transformátorov WN/SN so sprievodnými prácami v GPZ Radziejów, Piotrków Kujawski, Lipno a Rypin. Modernizácia a rozširovanie distribučných sietí zlepšuje spoľahlivosť elektrickej energie vrátane zníženia počtu a trvania prerušenia núdzových dodávok, zníženia strát elektrickej energie v sieťach a rozširuje možnosť rozvoja distribuovaných zdrojov energie s využitím miestnych zdrojov energie, najmä z obnoviteľných zdrojov energie. V dôsledku projektu bude dodatočná kapacita na pripojenie novej energie z obnoviteľných zdrojov do elektrickej siete 37,23 MW. (Slovak)
    26 July 2022
    0 references
    Il-proġett jinvolvi l-modernizzazzjoni, il-kostruzzjoni u r-rikostruzzjoni ta’ linji tal-elettriku b’vultaġġ medju (SN) u l-modernizzazzjoni tal-Punti Ewlenin tal-Enerġija (GPZ) sabiex jissostitwixxu t-trasformaturi WN/SN fuq is-sit tal-operat tal-fergħa ta’ ENERGA-OPERATOR SA f’ToruÅ. Il-proġett ikopri 9 kompiti ta’ investiment ippjanati li jitwettqu fis-snin 2017–2020 fil-Voivodeship ta’ Kujawsko-Pomorskie, fiż-żona tal-komuni: Good, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo u WÅocÅawek. Il-kamp ta’ applikazzjoni tal-Proġett jinkludi:- il-kostruzzjoni ta’ linji ġodda tal-kejbil SN u s-sostituzzjoni ta’ kejbils tal-elettriku fl-għoli qodma mhux iżolati fuq linji eżistenti u fergħat SN 15 kV għal linji ġodda, iżolati jew iżolati, it-twaqqigħ ta’ linji qodma tal-enerġija fl-għoli SN, skambju ta’ kolonni, skambju ta’ kolonni għal skonnettjaturi,- modernizzazzjoni tal-istazzjon GPZ li tikkonsisti fis-sostituzzjoni ta’ transformers bit-transformers tal-enerġija meħtieġa. It-tul totali tal-grilji tal-enerġija mibnija ġodda SN 15 kV se jkun ta’ 3.400 km u t-tul tan-netwerks imtejba se jkun ta’ 96.777 km. L-ambitu tal-kompiti tal-Proġett jinkludi wkoll l-iskambju ta ‘transformers 8 WN/SN b’xogħlijiet ta’ akkumpanjament fil-GPZ Radziejów, Piotrków Kujawski, Lipno u Rypin. Il-modernizzazzjoni u l-espansjoni tan-netwerks ta’ distribuzzjoni jtejbu l-affidabbiltà tal-enerġija, inkluż it-tnaqqis tal-għadd u t-tul ta’ interruzzjonijiet tal-provvista ta’ emerġenza, it-tnaqqis tat-telf tal-elettriku fil-grilji u jespandu l-possibbiltà li jiġu żviluppati sorsi tal-enerġija distribwiti li jużaw sorsi tal-enerġija lokali b’mod partikolari mis-sorsi tal-enerġija rinnovabbli. B’riżultat tal-proġett, il-kapaċità addizzjonali għall-konnessjoni ta’ enerġija RES ġdida mal-grilja tal-elettriku se tkun ta’ 37.23 MW. (Maltese)
    26 July 2022
    0 references
    O projeto envolve a modernização, construção e reconstrução de linhas elétricas de média tensão (SN) e a modernização dos principais pontos de potência (GPZ), a fim de substituir os transformadores WN/SN no local de exploração da filial ENERGA-OPERATOR SA em ToruÅ. O projeto abrange 9 tarefas de investimento previstas para o período 2017-2020 na voivodia de Kujawsko-Pomorskie, na zona das comunas: Bom, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo e WÅocÅawek. O âmbito do projeto inclui:- construção de novas linhas de cabos SN e substituição de antigos cabos elétricos aéreos não isolados nas linhas existentes e ramos SN 15 kV para novos, isolados ou isolados, demolição de antigas linhas elétricas aéreas SN, troca de colunas, troca de colunas para seccionadores,- modernização da estação GPZ consistindo na substituição de transformadores com os transformadores de potência necessários. O comprimento total das novas redes elétricas SN 15 kV será de 3,400 km e o comprimento das redes modernizadas será de 96,777 km. O escopo das tarefas do Projeto também inclui a troca de 8 transformadores WN/SN com trabalhos de acompanhamento nos GPZ Radziejów, Piotrków Kujawski, Lipno e Rypin. A modernização e expansão das redes de distribuição melhora a fiabilidade da energia, incluindo a redução do número e da duração das interrupções de abastecimento de emergência, a redução das perdas de eletricidade nas redes e amplia a possibilidade de desenvolver fontes de energia distribuídas utilizando fontes de energia locais, em particular a partir de fontes de energia renováveis. Como resultado do projeto, a capacidade adicional para ligar a nova energia FER à rede elétrica será de 37,23 MW. (Portuguese)
    26 July 2022
    0 references
    Hankkeeseen kuuluu keskijännitejohtojen nykyaikaistaminen, rakentaminen ja jälleenrakentaminen sekä päävoimapisteiden (GPZ) nykyaikaistaminen, jotta voidaan korvata WN/SN-muuntajat ENERGA-OPERATOR SA -haarakonttorin toimintapaikalla ToruÅssa. Hanke kattaa yhdeksän investointitehtävää, jotka on tarkoitus toteuttaa vuosina 2017–2020 Kujawsko-Pomorskien voivodikunnassa kunnissa: Hyvä, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo ja WÅocÅawek. Hankkeen soveltamisalaan kuuluvat:- uusien kaapelilinjojen rakentaminen SN ja vanhojen, olemassa olevista linjoista ja haarasta SN 15 kV erottamattomien ilmajohtojen korvaaminen uusilla, eristetyillä tai eristetyillä, vanhojen ilmajohtojen purkaminen SN, kolonnien vaihto, pylväiden vaihto irrottajille, GPZ-aseman nykyaikaistaminen, jossa muuntajat korvataan tarvittavilla muuntajilla. Uusien sähköverkkojen SN 15 kV kokonaispituus on 3 400 km ja parannettujen verkkojen pituus 96,777 km. Hankkeen tehtäviin kuuluu myös 8 WN/SN-muuntajan vaihto GPZ Radziejów:ssä, Piotrków Kujawskissa, Lipnossa ja Rypinissä. Jakeluverkkojen nykyaikaistaminen ja laajentaminen parantaa sähkön luotettavuutta muun muassa vähentämällä hätätoimitusten keskeytysten määrää ja kestoa, vähentämällä sähköhäviöitä verkoissa ja laajentamalla mahdollisuutta kehittää hajautettuja energialähteitä erityisesti uusiutuvista energialähteistä peräisin olevia paikallisia energialähteitä käyttäen. Hankkeen tuloksena uusi uusiutuvaa energiaa koskeva lisäkapasiteetti on 37,23 MW. (Finnish)
    26 July 2022
    0 references
    Projekt vključuje posodobitev, gradnjo in obnovo srednjenapetostnih električnih vodov (SN) ter posodobitev glavnih energetskih točk (GPZ), da bi na mestu obratovanja podružnice ENERGA-OPERATOR SA v Toruži nadomestili transformatorje WN/SN. Projekt zajema 9 naložbenih nalog, ki naj bi se izvajale v obdobju 2017–2020 v Kujawsko-Pomorjanskem vojvodstvu na področju občin: Dobro, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo in WÅocÅawek. Področje uporabe projekta vključuje:- gradnjo novih kabelskih vodov SN in zamenjavo starih nadzemnih električnih kablov, ki niso izolirani na obstoječih vodih in vejah SN 15 kV za nove, izolirane ali izolirane, rušenje starih nadzemnih električnih vodov SN, izmenjavo stolpcev, izmenjavo stolpcev za odklopnike,- posodobitev postaje GPZ, ki sestoji iz zamenjave transformatorjev s potrebnimi transformatorji. Skupna dolžina novozgrajenih električnih omrežij SN 15 kV bo 3,400 km, dolžina nadgrajenih omrežij pa 96,777 km. Obseg nalog projekta vključuje tudi izmenjavo 8 WN/SN transformatorjev s spremljajočimi deli v GPZ Radziejów, Piotrków Kujawski, Lipno in Rypin. S posodobitvijo in širitvijo distribucijskih omrežij se izboljša zanesljivost električne energije, vključno z zmanjšanjem števila in trajanja prekinitev oskrbe v izrednih razmerah, zmanjšanjem izgub električne energije v omrežjih in razširitvijo možnosti za razvoj porazdeljenih virov energije z uporabo lokalnih virov energije, zlasti iz obnovljivih virov. Zaradi projekta bo dodatna zmogljivost za priključitev nove energije iz obnovljivih virov na električno omrežje 37,23 MW. (Slovenian)
    26 July 2022
    0 references
    Projekt zahrnuje modernizaci, výstavbu a rekonstrukci vedení středního napětí (SN) a modernizaci hlavních napájecích bodů (GPZ) s cílem nahradit transformátory WN/SN v místě provozu pobočky ENERGA-OPERATOR SA v ToruÅ. Projekt zahrnuje 9 investičních úkolů, které mají být provedeny v letech 2017–2020 v Kujawsko-pomořském vojvodství v oblasti obcí: Dobrý, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo a WÅocÅawek. Součástí projektu je:- výstavba nových kabelových vedení SN a výměna starých trolejových napájecích kabelů, které nejsou izolovány na stávajících vedeních a větvích SN 15 kV pro nové, izolované nebo izolované, demolice starých trolejových vedení SN, výměna sloupů, výměna sloupů pro odpojovače,- modernizace stanice GPZ spočívající v výměně transformátorů za potřebné výkonové transformátory. Celková délka nově vybudovaných elektrických sítí SN 15 kV bude 3,400 km a délka modernizovaných sítí bude 96,777 km. Rozsah úkolů projektu zahrnuje také výměnu 8 WN/SN transformátorů s doprovodnými pracemi v GPZ Radziejów, Piotrków Kujawski, Lipno a Rypin. Modernizace a rozšíření distribučních sítí zvyšuje spolehlivost elektrické energie, včetně snížení počtu a délky přerušení dodávek, snížení ztrát elektrické energie v sítích a rozšiřuje možnost rozvoje distribuovaných zdrojů energie z místních zdrojů energie zejména z OZE. V důsledku projektu bude dodatečná kapacita pro připojení nové energie z obnovitelných zdrojů do elektrické sítě 37,23 MW. (Czech)
    26 July 2022
    0 references
    Projektas apima vidutinės įtampos elektros linijų (SN) modernizavimą, statybą ir rekonstrukciją, taip pat pagrindinių galios taškų (GPZ) modernizavimą, siekiant pakeisti WN/SN transformatorius „ENERGA-OPERATOR SA“ padalinio eksploatavimo vietoje Toruže. Projektas apima 9 investavimo užduotis, planuojamas 2017–2020 m. Kujavijos Pamario vaivadijoje komunų srityje: Geras, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo ir WÅocÅawek. Projektas apima:- naujų kabelių linijų SN statybą ir senų antžeminių elektros kabelių, kurie nėra izoliuoti esamose linijose ir SN 15 kV atšakose, pakeitimą naujoms, izoliuotoms ar izoliuotoms naujoms, izoliuotoms ar izoliuotoms, senų oro linijų SN griovimui, kolonų keitimui, atjungiklių kolonėlių keitimui,- GPZ stoties modernizavimui, kurį sudaro transformatorių pakeitimas būtinais galios transformatoriais. Bendras naujai pastatytų elektros tinklų SN 15 kV ilgis bus 3,400 km, o atnaujintų tinklų ilgis – 96,777 km. Projekto užduočių apimtis taip pat apima 8 WN/SN transformatorių mainus su lydimaisiais darbais GPZ Radziejów, Piotrków Kujawski, Lipno ir Rypin. Modernizuojant ir plečiant skirstomuosius tinklus didinamas elektros energijos patikimumas, įskaitant avarinių tiekimo pertraukų skaičiaus ir trukmės mažinimą, elektros energijos nuostolių tinkluose mažinimą ir išplečiama galimybė plėtoti paskirstytuosius energijos šaltinius naudojant vietos energijos šaltinius, visų pirma atsinaujinančiuosius energijos išteklius. (Lithuanian)
    26 July 2022
    0 references
    Projekts ietver vidēja sprieguma elektrolīniju (SN) modernizāciju, būvniecību un rekonstrukciju un galveno spēka punktu (GPZ) modernizāciju, lai aizstātu WN/SN transformatorus ENERGA-OPERATOR SA filiāles darbības vietā Toruā. Projekts aptver 9 investīciju uzdevumus, ko plānots veikt 2017.–2020. gadā Kujawsko-Pomožes vojevodistē komūnu teritorijā: Labi, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo un WÅocÅawek. Projekta darbības joma ietver:- jaunu kabeļu līniju SN izbūvi un veco gaisvadu barošanas kabeļu nomaiņu, kas nav izolēti esošajās līnijās un filiālēs SN 15 kV, jaunu, izolētu vai izolētu veco gaisvadu elektrolīniju nojaukšanai, kolonnu apmaiņai pret atvienotājiem,- GPZ stacijas modernizācijai, kas sastāv no transformatoru nomaiņas ar nepieciešamajiem spēka transformatoriem. Jaunbūvēto elektrotīklu kopējais garums SN 15 kV būs 3,400 km un modernizēto tīklu garums būs 96,777 km. Projekta uzdevumi ietver arī 8 WN/SN transformatoru apmaiņu ar pavadošajiem darbiem GPZ Radziejów, Piotrków Kujawski, Lipno un Rypin. Sadales tīklu modernizācija un paplašināšana uzlabo elektroenerģijas uzticamību, tostarp samazina ārkārtas piegādes pārtraukumu skaitu un ilgumu, samazina elektroenerģijas zudumus tīklos un paplašina iespēju attīstīt decentralizētus enerģijas avotus, izmantojot vietējos enerģijas avotus, jo īpaši no AER. Projekta rezultātā papildu jauda jaunas AER elektroenerģijas pieslēgšanai elektrotīklam būs 37,23 MW. (Latvian)
    26 July 2022
    0 references
    Проектът включва модернизация, изграждане и реконструкция на електропроводи за средно напрежение (SN) и модернизация на главните електрически точки (GPZ), за да се заменят трансформаторите WN/SN на мястото на експлоатация на клона на ENERGA-OPERATOR SA в Торуа. Проектът обхваща 9 инвестиционни задачи, планирани за периода 2017—2020 г. в Куявско-Поморско войводство в областта на общините: Добре, OsiÄciny, Radziejów, Piotrków Куявски, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo и WÅocÅawek. В обхвата на проекта са включени:- изграждане на нови кабелни линии SN и подмяна на стари въздушни електропроводи, които не са изолирани по съществуващи линии и клонове SN 15 kV за нови, изолирани или изолирани, разрушаване на стари въздушни електропроводи SN, размяна на колони, размяна на колони за разединители, модернизация на станцията GPZ, състояща се в подмяна на трансформатори с необходимите сил. трансформатори. Общата дължина на новоизградените електропреносни мрежи SN 15 kV ще бъде 3 400 км, а дължината на модернизираните мрежи ще бъде 96.777 км. Обхватът на задачите на проекта включва и обмена на 8 трансформатора WN/SN със съпътстващи работи в GPZ Radziejów, Piotrków Kujawski, Lipno и Rypin. Модернизацията и разширяването на електроразпределителните мрежи подобрява надеждността на електроснабдяването, включително намаляване на броя и продължителността на прекъсванията на аварийните доставки, намаляване на загубите на електроенергия в мрежите и разширяване на възможността за разработване на разпределени енергийни източници, като се използват местни енергийни източници, по-специално от ВЕИ. В резултат на проекта допълнителният капацитет за свързване на нова ВЕИ към електрическата мрежа ще бъде 37,23 MW. (Bulgarian)
    26 July 2022
    0 references
    A projekt magában foglalja a középfeszültségű elektromos vezetékek (SN) korszerűsítését, építését és felújítását, valamint a fő teljesítménypontok (GPZ) korszerűsítését annak érdekében, hogy az ENERGA-OPERATOR SA fióktelepének ToruÅ-i telephelyén kicseréljék a WN/SN transzformátorokat. A projekt 9 beruházási feladatot foglal magában, amelyeket a tervek szerint 2017–2020 között hajtanak végre a Kujawsko-Pomorskie vajdaságban a települések területén: Jó, OsiÄciny, Radziejoww, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo és WÅocÅawek. A projekt hatóköre a következőket foglalja magában:- új SN kábelvezetékek építése és a meglévő vonalakon nem elkülönített régi felsővezetékek és SN 15 kV ágak cseréje új, szigetelt vagy szigetelt új, szigetelt vagy szigetelt, régi felsővezetékek bontása SN, oszlopok cseréje, leválasztó oszlopok cseréje,- a GPZ-állomás korszerűsítése, amely a transzformátorok szükséges transzformátorokkal való cseréjéből áll. Az újonnan épített SN 15 kV-os villamosenergia-hálózatok teljes hossza 3,400 km, a korszerűsített hálózatok hossza pedig 96,777 km. A projekt feladatai közé tartozik 8 WN/SN transzformátor cseréje a GPZ Radziejoww, Piotrków Kujawski, Lipno és Rypin területén. Az elosztóhálózatok korszerűsítése és bővítése javítja a villamos energia megbízhatóságát, beleértve a vészhelyzeti ellátási zavarok számának és időtartamának csökkentését, a hálózatok villamosenergia-veszteségének csökkentését, valamint bővíti az elosztott energiaforrások, különösen a megújuló energiaforrások felhasználásával történő fejlesztésének lehetőségét. A projekt eredményeként az új megújuló energiaforrások villamosenergia-hálózathoz való csatlakoztatásának további kapacitása 37,23 MW lesz. (Hungarian)
    26 July 2022
    0 references
    Is éard atá i gceist leis an tionscadal nuachóiriú, tógáil agus atógáil línte cumhachta meánvoltais (SN) agus nuachóiriú na bPointí Príomhchumhachta (GPZ) chun claochladáin WN/SN a athsholáthar ar shuíomh oibriú Bhrainse SA ENERGA-OPERATOR SA in ToruÅ. Clúdaíonn an tionscadal 9 dtasc infheistíochta atá beartaithe a dhéanamh sna blianta 2017-2020 in Kujawsko-Pomorskie Voivodeship, i réimse na bpobal: Maith, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo agus WÅocÅawek. Áirítear ar raon feidhme an Tionscadail:- línte cábla nua a thógáil SN agus athsholáthar seancháblaí cumhachta lastuas nach bhfuil scoite amach ar línte agus brainsí atá ann cheana féin SN 15 kV le haghaidh nua, inslithe nó inslithe, scartáil seanlínte cumhachta lastuas SN, malartú colúin, malartú colúin le haghaidh dícheangail, — nuachóiriú an stáisiúin GPZ ina bhfuil na claochladáin chumhachta is gá in ionad claochladáin. Is é 3.400 km fad iomlán na ngreillí cumhachta nua-thógtha SN 15 kV agus is é 96.777 km fad na líonraí uasghrádaithe. Áirítear ar raon feidhme chúraimí an Tionscadail freisin claochladáin 8 WN/SN a mhalartú le hoibreacha tionlacain sa GPZ Radziejów, Piotrków Kujawski, Lipno agus Rypin. Feabhsaíonn nuachóiriú agus leathnú na ngréasán dáileacháin iontaofacht na cumhachta, lena n-áirítear laghdú ar líon agus ar fhad na mbriseadh ar an soláthar éigeandála, laghdú ar chaillteanais leictreachais in eangacha agus méadaítear an fhéidearthacht foinsí fuinnimh dáilte a fhorbairt ag baint úsáide as foinsí fuinnimh áitiúla go háirithe ó RES. Mar thoradh ar an tionscadal, is é 37.23 MW an acmhainneacht bhreise a bheidh ann cumhacht RES nua a nascadh leis an eangach cumhachta. (Irish)
    26 July 2022
    0 references
    Projektet omfattar modernisering, byggande och ombyggnad av mellanspänningsledningar (SN) och modernisering av huvudkraftpunkterna (GPZ) för att ersätta WN/SN-transformatorer på den plats där ENERGA-OPERATOR SA-filialen i ToruÅ drivs. Projektet omfattar 9 investeringsuppgifter som planeras genomföras under åren 2017–2020 i vojvodskapet Kujawsko-Pomorskie, på kommunområdet: Bra, OsiÄciny, Radziejów, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo och WÅocÅawek. Projektet omfattar:- uppförande av nya kabelledningar SN och utbyte av gamla luftledningar som inte är isolerade på befintliga ledningar och grenar SN 15 kV för nya, isolerade eller isolerade, rivning av gamla luftledningar SN, utbyte av kolumner, utbyte av kolonner för frånkopplare,- modernisering av GPZ-stationen bestående av utbyte av transformatorer med nödvändiga krafttransformatorer. Den totala längden på de nybyggda elnäten SN 15 kV kommer att vara 3,400 km och längden på de uppgraderade näten kommer att vara 96,777 km. Projektets uppgifter omfattar också utbyte av 8 WN/SN-transformatorer med tillhörande arbeten i GPZ Radziejó³w, Piotrków Kujawski, Lipno och Rypin. Moderniseringen och utbyggnaden av distributionsnäten förbättrar energins tillförlitlighet, bland annat genom att minska antalet och varaktigheten av avbrott i nödförsörjningen, minska elförlusterna i näten och utöka möjligheten att utveckla distribuerade energikällor som använder lokala energikällor, särskilt från förnybara energikällor. Som ett resultat av projektet kommer den ytterligare kapaciteten att ansluta ny el från förnybara energikällor till elnätet att bli 37,23 MW. (Swedish)
    26 July 2022
    0 references
    Projekt hõlmab keskpingeliinide (SN) ajakohastamist, ehitamist ja rekonstrueerimist ning peamiste võimsuspunktide (GPZ) ajakohastamist, et asendada WN/SN trafod ENERGA-OPERATOR SA filiaali käitamise kohas ToruÅis. Projekt hõlmab 9 investeerimisülesannet, mis on kavandatud 2017.–2020. aastaks Kujawsko-Pomorskie vojevoodkonnas kommuunide valdkonnas: Hea, OsiÄciny, Radziej³w, Piotrków Kujawski, SkÄpe, Lipno, Fabianki, Rypin, Skrwilno, Baruchowo ja WÅocÅawek. Projekt hõlmab:- uute kaabliliinide SN ehitamist ja olemasolevatel liinidel isoleerimata vanade õhuliinide ja harude SN 15 kV väljavahetamist uute, isoleeritud või isoleeritud elektriliinide jaoks, vanade õhuliinide SN lammutamist, kolonnide vahetamist, kolonnide vahetamist lahtiühendamiseks, GPZ jaama ajakohastamist, mis seisneb trafode asendamises vajalike elektritrafodega. Uute elektrivõrkude SN 15 kV kogupikkus on 3 400 km ja ajakohastatud võrkude pikkus 96,777 km. Projekti ülesannete hulka kuulub ka 8 WN/SN trafode vahetus koos kaasnevate töödega GPZ Radziej³w, Piotrków Kujawski, Lipno ja Rypinis. Jaotusvõrkude moderniseerimine ja laiendamine parandab energia usaldusväärsust, sealhulgas vähendab elektritarnekatkestuste arvu ja kestust, vähendab elektrikadu võrkudes ning laiendab võimalust arendada hajutatud energiaallikaid, kasutades kohalikke energiaallikaid, eelkõige taastuvatest energiaallikatest. Projekti tulemusena on taastuvenergiaallikatest toodetud uue elektri elektrivõrguga ühendamise lisavõimsus 37,23 MW. (Estonian)
    26 July 2022
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: lipnowski
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: radziejowski
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: rypiński
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: włocławski
    0 references

    Identifiers

    RPKP.03.01.00-04-0057/17
    0 references