Clean energy for the needs of the Sports and Recreation Complex in Lesk through the installation of photovoltaic cells (Q4422957): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed label, description and/or aliases in en, and other parts: Adding translation)
label / enlabel / en
 
Clean energy for the needs of the Sports and Recreation Complex in Lesk through the installation of photovoltaic cells
Property / summary
 
The direct objective of the project is to increase the level of energy production from renewable energy sources in the distributed generation in the Sports and Recreation Complex in Lesk. The subject of this project is the installation of 1 122 photovoltaic modules, 0.445kWp each (the total power of the photovoltaic farm is 499,29Wp) on the premises of the Sports and Recreation Complex in Lesk. Scope of works for the entire project: 445Wp monocrystalline photovoltaic panels installation, ☐ Reconstruction of the existing transformer station, ☐ Installation of DC nN switchgear, ☐ Installation of the internal power line nN, ☐ Installation of nN DC and AC cable connections, ☐ Installation of measuring systems, ☐ Installation of installation of monitoring system of the installation. The launch of a photovoltaic installation. Final acceptance of the work carried out. The products of the project will be: 1. Additional capacity to generate electricity from renewable sources = 0.49 MWe. 2. Number of RES electricity generation units built = 1 pc. (English)
Property / summary: The direct objective of the project is to increase the level of energy production from renewable energy sources in the distributed generation in the Sports and Recreation Complex in Lesk. The subject of this project is the installation of 1 122 photovoltaic modules, 0.445kWp each (the total power of the photovoltaic farm is 499,29Wp) on the premises of the Sports and Recreation Complex in Lesk. Scope of works for the entire project: 445Wp monocrystalline photovoltaic panels installation, ☐ Reconstruction of the existing transformer station, ☐ Installation of DC nN switchgear, ☐ Installation of the internal power line nN, ☐ Installation of nN DC and AC cable connections, ☐ Installation of measuring systems, ☐ Installation of installation of monitoring system of the installation. The launch of a photovoltaic installation. Final acceptance of the work carried out. The products of the project will be: 1. Additional capacity to generate electricity from renewable sources = 0.49 MWe. 2. Number of RES electricity generation units built = 1 pc. (English) / rank
 
Normal rank

Revision as of 15:24, 24 October 2022

Project Q4422957 in Poland
Language Label Description Also known as
English
Clean energy for the needs of the Sports and Recreation Complex in Lesk through the installation of photovoltaic cells
Project Q4422957 in Poland

    Statements

    0 references
    2,521,920.0 zloty
    0 references
    560,622.82 Euro
    0 references
    3,550,000.0 zloty
    0 references
    789,165.0 Euro
    0 references
    71.04 percent
    0 references
    6 May 2022
    0 references
    12 May 2023
    0 references
    SPORT LESKO SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ W LESKU
    0 references
    Celem bezpośrednim projektu jest wzrost poziomu produkcji energii z odnawialnych źródeł energii w generacji rozproszonej na terenie Kompleksu Sportowo-Rekreacyjnego w Lesku. Przedmiotem niniejszego projektu jest montaż 1 122 modułów fotowoltaicznych, po 0,445kWp każdy (łączna moc farmy fotowoltaicznej to 499,29Wp) na terenie Kompleksu Sportowo Rekreacyjnego w Lesku. Zakres robót dla całego projektu: ▪ Montaż konstrukcji pod panele fotowoltaiczne, ▪ Montaż paneli fotowoltaicznych monokrystalicznych o mocy 445 Wp, ▪ Przebudowa istniejącej stacji transformatorowej, ▪ Montaż rozdzielnic DC nN, ▪ Montaż wewnętrznej linii zasilającej nN, ▪ Montaż połączeń kablowych nN DC i AC, ▪ Montaż układów pomiarowych, ▪ Montaż układu monitoringu pracy instalacji. ▪ Uruchomienie instalacji fotowoltaicznej. ▪ Odbiór końcowy wykonanych robót. Produktami projektu będą: 1. Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych = 0,49 MWe. 2. Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE = 1 szt. (Polish)
    0 references
    The direct objective of the project is to increase the level of energy production from renewable energy sources in the distributed generation in the Sports and Recreation Complex in Lesk. The subject of this project is the installation of 1 122 photovoltaic modules, 0.445kWp each (the total power of the photovoltaic farm is 499,29Wp) on the premises of the Sports and Recreation Complex in Lesk. Scope of works for the entire project: 445Wp monocrystalline photovoltaic panels installation, ☐ Reconstruction of the existing transformer station, ☐ Installation of DC nN switchgear, ☐ Installation of the internal power line nN, ☐ Installation of nN DC and AC cable connections, ☐ Installation of measuring systems, ☐ Installation of installation of monitoring system of the installation. The launch of a photovoltaic installation. Final acceptance of the work carried out. The products of the project will be: 1. Additional capacity to generate electricity from renewable sources = 0.49 MWe. 2. Number of RES electricity generation units built = 1 pc. (English)
    0 references
    WOJ.: PODKARPACKIE, POW.: leski
    0 references
    0 references

    Identifiers

    RPPK.11.02.00-18-0041/22
    0 references