Improving energy efficiency in public buildings in Kozłów (Q4427792): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts: Adding translation)
(‎Changed an Item: Import item from Poland)
Property / intervention field
 
Property / intervention field: Energy efficiency renovation of public infrastructure, demonstration projects and supporting measures / rank
 
Normal rank

Revision as of 15:17, 24 October 2022

Project Q4427792 in Poland
Language Label Description Also known as
English
Improving energy efficiency in public buildings in Kozłów
Project Q4427792 in Poland

    Statements

    0 references
    2,398,701.11 zloty
    0 references
    533,231.26 Euro
    0 references
    2,822,333.34 zloty
    0 references
    627,404.7 Euro
    0 references
    84.99 percent
    0 references
    20 February 2020
    0 references
    31 December 2023
    0 references
    GMINA KOZŁOWO
    0 references
    Przedmiotem proj.jest wykonanie prac poprawiających efektywność energetyczną budynków publ.przy ul. Nidzickiej 31, Mazurskiej 3 i Szkolnej w Kozłowie. W wyniku realiz.proj. nastąpi głęboka kompleksowa modernizacja energet. budynków publ. Nidzicka 31: -Wymiana węzła ciepl.na nowoczesny wykon.w technol.wymiennika płytowego.Płukanie i czyszcz.chem.instalacji. Montaż grzejników stalowych wyposaż.w zawory termost. Montaż liczn.ciepła, sys.zarządzania bud.-sterowanie temp.w poszczeg. pom. i zdalny odczyt zuż.energii. -Dociepl.stropodachu wentylow, dachu hali -Montaż instalacji went.mech.naw.- wyw.z rekuperacją. Montaż jedn.grzewczo-wentylacyjnej wyposaż.w system odzysku ciepła -Dociepl.ścian zew. kondygnacji nadziemnych bud. -Wymiana okien i drzwi zew.na energooszcz. -Montaż instalacji PV mocy 19,8 kW (60 szt. paneli PV moc 330W) -Montaż syst.zarz.energią w zakr.instal.oświetl Mazurska 3: -Wymiana węzła ciepl., niezbędnej armatury kotłowni, grzejników na stalowe z zaworem z głowicą termostat. -Montaż syst.zarz.budynkiem BMS -Dociepl.stropodachu wentylow -Wymiana okien piwnicznych na energooszcz., muru z pustaków szklanych na stolarkę okienną wraz z część.zmniejsz.otworu okiennego -Dociepl.ścian zewn.kondygn.nadziemnych, ścian w strefie cokołu oraz ścian fundament.Wykonanie izolacji przeciwwilgoc.ścian fundament. -Montaż PV o mocy 16,5kW (50szt. paneli PV moc 330W) -Montaż syst.zarz.energią w zakr.instal.oświetleniowej. Szkolna 6: -Wymiana węzła cieplnego. Płuk. i czyszcz.chem. instalacji. Wymiana grzejników w bud.szkoły i hali gimnast.(nie dot.łącznika) z montażem zaworów termostat., liczn.ciepła. -Dociepl.stropodachu wentylow.nad szkołą oraz nad zapleczem hali gimnast., dachu hali gimnast., ścian zew.kondygn.nadziemnych bud.szkoły i zaplecza hali gimnast.,ścian piwn.bud.szkoły, ścian zew.bud. hali gimnast. -Montaż PV moc 36,30kW (110szt. paneli PV moc 330W) Wyd.niekwalifi: obróbki blach.,rury spustowe parapety,izolacja poz.ścian.cz. mieszkalna (Polish)
    0 references
    The subject of the project is the execution of works improving the energy efficiency of buildings publ. at ul. Nidzicka 31, Mazurska 3 and School in Kozłów. As a result of realiz.proj. will be a deep comprehensive modernisation of the energy of publ buildings. Nidzicka 31: —Replacement of heat node.for modern works.in technol.plat exchanger.Rinsing and cleaning.chem.installation. Installation of steel radiators equipped with thermost valves. Installation of numerous.warm, building management system-temp. control of individual units and remote reading of energy. —Dociepl.stropodu ventilators, roof of the hall -Montage of the installation of went.mech.naw. Installation of one heating and ventilation system equipped with a system of heat recovery -Dociepl.wall outer floors of aboveground buildings. —Exchange of windows and doors for energy. —Installation of PV power 19.8 kW (60 pcs. PV panels power 330W) -Asembly syst.zarz.energy in zakr.instal.olight Mazurska 3: —Replacement of heat node., necessary boiler fittings, radiators for steel with valve with thermostat head. —Montaż syst.zarz.budynkiem BMS -Dociepl.stropodachu ventillow -Replacement of basement windows for energy, wall made of glass blocks for window joinery together with part.reduced.window hole -Insulation outside.floor wall, walls in the plinth zone and foundation walls. PV installation with a power of 16.5 kW (50 pcs. PV panels power 330W) -Sast.zarz.energy installation in the lighting installation. School 6: —Exchange of the heat node. Rinse and clean.chem. installation. Replacement of radiators in the building.school and gymnast.(not about the switch) with the installation of thermostat valves., numerous.warm. —Dociepl.stropodachu wentylow.above the school and over the back of the gymnast hall, the roof of the gymnast hall, the walls of the outside building. —Installation PV power 36.30 kW (110pcs PV panels power 330W) sheet metal processing.,draw pipes window sills,insulation post wall.cz. (English)
    0 references
    WOJ.: WARMIŃSKO-MAZURSKIE, POW.: nidzicki
    0 references

    Identifiers

    RPWM.04.03.01-28-0019/20
    0 references