Construction of installations using renewable energy sources in Zambrów commune — 3 rd edition (Q4419344): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts)
(‎Changed an Item: Import item from Poland)
Property / intervention field
 
Property / intervention field: Renewable energy: solar / rank
 
Normal rank

Revision as of 15:08, 24 October 2022

Project Q4419344 in Poland
Language Label Description Also known as
English
Construction of installations using renewable energy sources in Zambrów commune — 3 rd edition
Project Q4419344 in Poland

    Statements

    0 references
    1,265,239.08 zloty
    0 references
    281,262.65 Euro
    0 references
    1,946,521.69 zloty
    0 references
    432,711.77 Euro
    0 references
    65.0 percent
    0 references
    12 March 2021
    0 references
    31 January 2023
    0 references
    GMINA ZAMBRÓW
    0 references
    Planowane jest zainstalowanie instalacji fotowoltaicznych i/lub instalacji kolektorów słonecznych do produkcji energii elektrycznej i cieplenej w 61 domach mieszkalnych na terenie gminy. Moc instalacji fotowoltaicznej będzie dostosowana do rocznego zapotrzebowania na energię elektryczną Grantobiorcy. Instalacja fotowoltaiczna powinna być tak dobrana, aby całkowita ilość energii elektrycznej wyprodukowanej i odprowadzonej do sieci energetycznej przez instalację objętą grantem w rocznym okresie rozliczeniowym nie przekroczyła 120% całkowitej ilości energii elektrycznej pobranej z sieci energetycznej przez Grantobiorcę w tym samym okresie rozliczeniowym. Każda z ww. instalacji obowiązkowo musi być wyposażona w licznik ciepła montowany w obiegu kolektorów umożliwiający prezentację danych dotyczących wyprodukowanej/produkowanej energii. Znamionowa moc instalacji powinna być określona pomiarami w Standardowych Warunkach Pomiaru. Cele opisuje pkt. IV.3.1 Skutkiem działań projektu będzie: 1/ wzrost jakości życia w regionie poprzez poprawę jakości powietrza, 2/ zmniejszenie emisji CO2 i gazów cieplarnianych, 3/ oszczędności kosztów eksploatacji budynków mieszkalnych. Cel zostanie zrealizowany, poprzez działania w zakresie zakupu i montażu instalacji do produkcji energii ze źródeł odnawialnych (energii słonecznej): 1. elektrycznej w 60 lokalizacjach (domach), 2. cieplnej w 8 lokalizacjach (domach). W ramach projektu w 7 lokalizacjach montowane będzie dwie instalacje Hybrydy:do produkcji energii elektrycznej i cieplnej, co stanowi 11%. Szacowany spadek emisji gazów cieplarnianych dzięki interwencji w PI 4a wyniesie łącznie dla obu rodzajów energii 168,93 MgCO2/rok; tj. 41,01% spadku emisji dla obu rodzajów instalacji. Przedmiotowy projekt nie jest objęty pomocą publiczną (Polish)
    0 references
    It is planned to install photovoltaic installations and/or solar collectors for the production of electricity and heat in 61 residential houses in the commune. The power of the photovoltaic installation will be adjusted to the annual electricity demand of the grantee. A photovoltaic installation should be selected in such a way that the total amount of electricity produced and discharged to the grid by the granted installation during the annual commitment period does not exceed 120 % of the total amount of electricity taken from the grid by the grantee during the same trading period. Each of the above-mentioned installations must be equipped with a heat meter mounted in the collector circuit enabling the presentation of data on the energy produced/produced. The rated power of the installation should be determined by measurements in the Standard Conditions of Measurement. The objectives are described in point. IV.3.1 The effect of the project will be: 1/Increase in the quality of life in the region by improving air quality, 2/reduction of CO2 and greenhouse gas emissions, 3/saving operating costs of residential buildings. The objective will be achieved through the purchase and installation of installations for the production of energy from renewable sources (solar energy): 1. electric in 60 locations (houses), 2. heat in 8 locations (houses). As part of the project, two hybrid installations will be installed in 7 locations: for the production of electricity and heat, which is 11 %. The estimated decrease in greenhouse gas emissions due to the intervention in PI 4a will total 168.93 MgCO2/year for both types of energy; that’s what I'm saying. 41.01 % reduction in emissions for both types of installations. The project is not covered by public aid (English)
    21 October 2022
    0 references
    WOJ.: PODLASKIE, POW.: zambrowski
    0 references