Construction of RES installations in the company- Gniecki s.c. (Q4419643): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts)
(‎Changed an Item: Import item from Poland)
Property / intervention field
 
Property / intervention field: Other renewable energy (including hydroelectric, geothermal and marine energy) and renewable energy integration (including storage, power to gas and renewable hydrogen infrastructure) / rank
 
Normal rank

Revision as of 14:19, 24 October 2022

Project Q4419643 in Poland
Language Label Description Also known as
English
Construction of RES installations in the company- Gniecki s.c.
Project Q4419643 in Poland

    Statements

    0 references
    237,223.4 zloty
    0 references
    52,734.76 Euro
    0 references
    364,959.09 zloty
    0 references
    81,130.41 Euro
    0 references
    65.0 percent
    0 references
    1 October 2022
    0 references
    30 September 2023
    0 references
    GNIECKI S. C.
    0 references
    Zakres prac dotyczy zakupu i montażu trzech instalacji fotowoltaicznych do produkcji energii elektrycznej oraz zakupu i montażu dwóch instalacji pomp ciepła do produkcji energii cieplnej na potrzeby firmy GNIECKI S.C. W lokalizacji ul. Kolejowa 29, znajduje się jeden budynek rozdzielony pod względem instalacyjnym na dwie odrębne instalacje elektryczne. W lokalizacji tej istnieją dwie mikroinstalacje fotowoltaiczne: pierwsza o mocy 18,45 kW zaś druga o mocy 31,5 kW (obie instalacje podłączone są do różnych liczników energii i posiadają oddzielne przyłącza). W ramach projektu obie instalacje zostaną rozbudowane o dodatkową moc, jedna o dodatkową moc ok 7,02 kW, zaś druga instalacja rozbudowana zostanie o dodatkową moc ok 12,87kW. Panele montowane będą na dachu budynku zaś falowniki fotowoltaiczne wewnątrz budynku. Obie instalacje zostaną rozbudowane do maks mocy przyłączeniowej danego przyłącza energet. Po rozbudowie żadna z instalacji fotowoltaicznych nie będzie przekraczała mocy 50 kW. Instalacje produkować będą energię elektryczną na własne potrzeby. W lokalizacji tej zaplanowano również zakup i montaż jednej instalacji pompy ciepła typu powietrze - woda o mocy 95,4 kW, wraz ze zbiornikiem buforowym magazynującym wytworzoną energię cieplną. W lokalizacji ul. Kolejowa 27, planuje się wykonanie nowej instalacji fotowoltaicznej o mocy ok 10,01 kW, która dodatkowo wyposażona zostanie w magazyn energii elektrycznej. Panele fotowoltaiczne montowane będą na dachu budynku zaś falownik wewnątrz budynku. W lokalizacji tej zaplanowano również zakup i montaż jednej instalacji pompy ciepła typu powietrze - woda o mocy 12,1 kW, wraz ze zbiornikiem buforowym magazynującym wytworzoną energię cieplną. REZULTATY:Produkcja en. cieplnej z nowo wybud. instalacji wykorzystujących OZE- 198,58 MWht/rok. Produkcja en. el. z nowo wybud. instalacji wykorzystujących OZE - 10,56 MWhe/rok. Produkcja en. el. z nowych mocy wytwórczych - 19,29 MWhe/rok. (Polish)
    0 references
    The scope of work concerns the purchase and installation of three photovoltaic installations for the production of electricity and the purchase and installation of two heat pump installations for the production of heat for the needs of GNIECKI S.C. Railway 29, there is one building separated in terms of installation into two separate electrical installations. There are two photovoltaic micro-installations in this location: the first with a power of 18.45 kW and the second with a power of 31.5 kW (both installations are connected to different energy meters and have separate connections). As part of the project, both installations will be extended with additional power, one with an additional power of about 7.02 kW, and the other installation will be extended by an additional power of about 12.87 kW. The panels will be installed on the roof of the building and photovoltaic inverters inside the building. Both installations will be extended to the maximum power of a given power connection. After expansion, none of the photovoltaic installations will exceed 50 kW. Installations will produce electricity for their own needs. In this location, it is also planned to purchase and install one air-water heat pump installation with a capacity of 95.4 kW, together with a buffer tank storing the generated heat. In the location of ul. Railway 27, it is planned to build a new photovoltaic installation with a capacity of about 10.01 kW, which will be additionally equipped with an electricity storage. Photovoltaic panels will be installed on the roof of the building and the inverter inside the building. In this location, it is also planned to purchase and install one air-water heat pump installation with a capacity of 12.1 kW, together with a buffer tank storing the generated heat. Results: Production of heat from newly built installations using RES — 198.58 MWht/year. Production en. el. from the newly built installations using RES — 10.56 MWhe/year. Production of en. el. from new generation capacity — 19.29 MWhe/year. (English)
    21 October 2022
    0 references
    WOJ.: LUBELSKIE, POW.: hrubieszowski
    0 references
    0 references

    Identifiers

    RPLU.15.01.00-06-0202/22
    0 references