Modernisation of water treatment stations in Kamień and extension of the water supply network in the Kamień Commune
Property / summary
 
The subject of the project will be the modernisation of the water treatment plant (SUW) in Kamień and the extension of 4.089 km of the water supply network in Kamień, Nowy Kamień and Łowisko. The project aims to improve the quality of water supply, as well as to ensure it in places where there were no water supply networks and to implement a water consumption monitoring system. As part of the project, it is planned to carry out n/in the following elements: 1) modernisation of the SUW (construction works, dismantling of the technology istn). (filter tanks — 4 pcs., pulmonary pump — 1pc, fittings and armament), technological connections (O110 mm pipes — 8 m and O160 mm — 4 m), technology (dynamicareator O600 mm -1 pc., filter tanks O1800 mm with bed — 2 pieces, blower — 1 kpl., screw compressor — 1 piece, rotor pump — 1 piece and other according to SW), compressed air switchgear, UV sterilisers (type AM-3-1 kpl., AM-2-1 pc.), electrical and AKPiA installations (SCADA + webserver, generator aggregator with a power of 15 kVA), other works (full water analysis, process start-up)); 2) extension of the water supply network (includes 11 sections of the water supply network from PE SDR 17 pipes combined by welding in quantities of: 140 m — O63 mm, 3 109 m — O90 mm, 665 m — O110 mm, 175 m — O160 mm, with accompanying infrastructure: valves for water with housing and box (O50-1 kpl., O80-27 kpl., O100-2 pp., O150-2 pcs), above-ground hydrants O80 with bolt and box — 18 pcs., two-part curtain pipes APS O110 mm long. 3.0 m — 11 pcs., O140 mm long 23.0 m — 1 pc., drills controlled in the casing pipe: O250 mm, length. 14.0 m — 1 pc., O200 mm, length 7.0 m — 1 pc, length 8.0 m — 2 pcs., length 11.0 m — 1 pc., length 15.0 m — 1 pc.);3) installation of the water consumption surveillance system (replacement of water meter sets with counting module (remote reading system) with shut-off valves and anti-infection valve — 1565 kpl. (O15 mm); 23 pcs. (About 20 mm); 8 pcs. (About 50 mm), radio terminal for water meter readings with software — 1 pc.). (English)
Property / summary: The subject of the project will be the modernisation of the water treatment plant (SUW) in Kamień and the extension of 4.089 km of the water supply network in Kamień, Nowy Kamień and Łowisko. The project aims to improve the quality of water supply, as well as to ensure it in places where there were no water supply networks and to implement a water consumption monitoring system. As part of the project, it is planned to carry out n/in the following elements: 1) modernisation of the SUW (construction works, dismantling of the technology istn). (filter tanks — 4 pcs., pulmonary pump — 1pc, fittings and armament), technological connections (O110 mm pipes — 8 m and O160 mm — 4 m), technology (dynamicareator O600 mm -1 pc., filter tanks O1800 mm with bed — 2 pieces, blower — 1 kpl., screw compressor — 1 piece, rotor pump — 1 piece and other according to SW), compressed air switchgear, UV sterilisers (type AM-3-1 kpl., AM-2-1 pc.), electrical and AKPiA installations (SCADA + webserver, generator aggregator with a power of 15 kVA), other works (full water analysis, process start-up)); 2) extension of the water supply network (includes 11 sections of the water supply network from PE SDR 17 pipes combined by welding in quantities of: 140 m — O63 mm, 3 109 m — O90 mm, 665 m — O110 mm, 175 m — O160 mm, with accompanying infrastructure: valves for water with housing and box (O50-1 kpl., O80-27 kpl., O100-2 pp., O150-2 pcs), above-ground hydrants O80 with bolt and box — 18 pcs., two-part curtain pipes APS O110 mm long. 3.0 m — 11 pcs., O140 mm long 23.0 m — 1 pc., drills controlled in the casing pipe: O250 mm, length. 14.0 m — 1 pc., O200 mm, length 7.0 m — 1 pc, length 8.0 m — 2 pcs., length 11.0 m — 1 pc., length 15.0 m — 1 pc.);3) installation of the water consumption surveillance system (replacement of water meter sets with counting module (remote reading system) with shut-off valves and anti-infection valve — 1565 kpl. (O15 mm); 23 pcs. (About 20 mm); 8 pcs. (About 50 mm), radio terminal for water meter readings with software — 1 pc.). (English) / rank
 
Normal rank
Property / summary: The subject of the project will be the modernisation of the water treatment plant (SUW) in Kamień and the extension of 4.089 km of the water supply network in Kamień, Nowy Kamień and Łowisko. The project aims to improve the quality of water supply, as well as to ensure it in places where there were no water supply networks and to implement a water consumption monitoring system. As part of the project, it is planned to carry out n/in the following elements: 1) modernisation of the SUW (construction works, dismantling of the technology istn). (filter tanks — 4 pcs., pulmonary pump — 1pc, fittings and armament), technological connections (O110 mm pipes — 8 m and O160 mm — 4 m), technology (dynamicareator O600 mm -1 pc., filter tanks O1800 mm with bed — 2 pieces, blower — 1 kpl., screw compressor — 1 piece, rotor pump — 1 piece and other according to SW), compressed air switchgear, UV sterilisers (type AM-3-1 kpl., AM-2-1 pc.), electrical and AKPiA installations (SCADA + webserver, generator aggregator with a power of 15 kVA), other works (full water analysis, process start-up)); 2) extension of the water supply network (includes 11 sections of the water supply network from PE SDR 17 pipes combined by welding in quantities of: 140 m — O63 mm, 3 109 m — O90 mm, 665 m — O110 mm, 175 m — O160 mm, with accompanying infrastructure: valves for water with housing and box (O50-1 kpl., O80-27 kpl., O100-2 pp., O150-2 pcs), above-ground hydrants O80 with bolt and box — 18 pcs., two-part curtain pipes APS O110 mm long. 3.0 m — 11 pcs., O140 mm long 23.0 m — 1 pc., drills controlled in the casing pipe: O250 mm, length. 14.0 m — 1 pc., O200 mm, length 7.0 m — 1 pc, length 8.0 m — 2 pcs., length 11.0 m — 1 pc., length 15.0 m — 1 pc.);3) installation of the water consumption surveillance system (replacement of water meter sets with counting module (remote reading system) with shut-off valves and anti-infection valve — 1565 kpl. (O15 mm); 23 pcs. (About 20 mm); 8 pcs. (About 50 mm), radio terminal for water meter readings with software — 1 pc.). (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:06, 21 October 2022

Project Q4417875 in Poland
Language Label Description Also known as
English
Modernisation of water treatment stations in Kamień and extension of the water supply network in the Kamień Commune
Project Q4417875 in Poland

    Statements

    0 references
    982,520.98 zloty
    0 references
    218,414.41 Euro
    0 references
    1,155,907.05 zloty
    0 references
    256,958.14 Euro
    0 references
    85.0 percent
    0 references
    5 May 2021
    0 references
    31 October 2022
    0 references
    GMINA KAMIEŃ
    0 references
    0 references
    Przedmiotem projektu będzie modernizacja stacji uzdatniania wody (SUW) w m. Kamień oraz rozbudowa 4,089 km sieci wodociągowej w m. Kamień, Nowy Kamień i Łowisko. Projekt ma na celu poprawę jakości dostaw wody, a także zapewnienie jej w miejscach, gdzie dotychczas nie było sieci wodociągowych oraz wdrożenie systemu monitorowania zużycia wody. W ramach przedsięwzięcia planuje się wykonać n/w elementy:1) modernizacja SUW (roboty budowlane, demontaż technologii istn. (zbiorniki filtracyjne - 4 szt., pompa płuczna - 1szt., armatura i uzbrojenie), przyłącza technologiczne (rurociągi O110 mm - 8 m i O160 mm - 4 m), technologia (areator dynamiczny O600 mm -1 szt., zbiorniki filtracyjne O1800 mm wraz ze złożem - 2 szt., dmuchawa - 1 kpl., sprężarka śrubowa - 1 kpl., pompa wirnikowa - 1 kpl. i inne wg SW), rozdzielnia sprężonego powietrza, sterylizatory UV (typu AM-3 - 1 kpl., AM-2 - 1 kpl.), instalacje elektryczne i AKPiA (system SCADA + WEBSerwer, agregator prądotwórczy o mocy 15 kVA), roboty pozostałe (pełna analiza wody, rozruch technologiczny));2) rozbudowa sieci wodociągowej (obejmuje 11 odcinków sieci wodociągowej z rur PE SDR 17 łączonych przez zgrzewanie w ilości: 140 m - O63 mm, 3109 m - O90 mm, 665 m - O110 mm, 175 m - O160 mm, wraz z infrastrukturą towarzyszącą: zasuwy do wody z obudową i skrzynką (O50 - 1 kpl., O80 - 27 kpl., O100 - 2 kpl., O150 - 2 kpl.), hydranty nadziemne O80 z zasuwą i skrzynką - 18 kpl., rury osłonowe dwudzielne APS O110 mm dł. 3,0 m - 11 szt., O140 mm dł. 23,0 m - 1 szt., przewierty sterowane w rurze osłonowej: O250 mm, dł. 14,0 m - 1 szt., O200 mm, dł. 7,0 m - 1 szt, dł. 8,0 m - 2 szt., dł. 11,0 m - 1 szt., dł. 15,0 m - 1 szt.);3) montaż systemu nadzoru nad zużyciem wody (wymiana zestawów wodomierzowych z modułem zliczającym (system zdalnego odczytu) wraz z zaworami odcinającymi i zaworem antyskażeniowym - 1565 kpl. (O15 mm); 23 kpl. (O 20 mm); 8 kpl. (O 50 mm), radiowy terminal do odczytów wodomierzowych wraz z oprogramowaniem - 1 kpl.). (Polish)
    0 references
    The subject of the project will be the modernisation of the water treatment plant (SUW) in Kamień and the extension of 4.089 km of the water supply network in Kamień, Nowy Kamień and Łowisko. The project aims to improve the quality of water supply, as well as to ensure it in places where there were no water supply networks and to implement a water consumption monitoring system. As part of the project, it is planned to carry out n/in the following elements: 1) modernisation of the SUW (construction works, dismantling of the technology istn). (filter tanks — 4 pcs., pulmonary pump — 1pc, fittings and armament), technological connections (O110 mm pipes — 8 m and O160 mm — 4 m), technology (dynamicareator O600 mm -1 pc., filter tanks O1800 mm with bed — 2 pieces, blower — 1 kpl., screw compressor — 1 piece, rotor pump — 1 piece and other according to SW), compressed air switchgear, UV sterilisers (type AM-3-1 kpl., AM-2-1 pc.), electrical and AKPiA installations (SCADA + webserver, generator aggregator with a power of 15 kVA), other works (full water analysis, process start-up)); 2) extension of the water supply network (includes 11 sections of the water supply network from PE SDR 17 pipes combined by welding in quantities of: 140 m — O63 mm, 3 109 m — O90 mm, 665 m — O110 mm, 175 m — O160 mm, with accompanying infrastructure: valves for water with housing and box (O50-1 kpl., O80-27 kpl., O100-2 pp., O150-2 pcs), above-ground hydrants O80 with bolt and box — 18 pcs., two-part curtain pipes APS O110 mm long. 3.0 m — 11 pcs., O140 mm long 23.0 m — 1 pc., drills controlled in the casing pipe: O250 mm, length. 14.0 m — 1 pc., O200 mm, length 7.0 m — 1 pc, length 8.0 m — 2 pcs., length 11.0 m — 1 pc., length 15.0 m — 1 pc.);3) installation of the water consumption surveillance system (replacement of water meter sets with counting module (remote reading system) with shut-off valves and anti-infection valve — 1565 kpl. (O15 mm); 23 pcs. (About 20 mm); 8 pcs. (About 50 mm), radio terminal for water meter readings with software — 1 pc.). (English)
    21 October 2022
    0 references
    WOJ.: PODKARPACKIE, POW.: rzeszowski
    0 references

    Identifiers

    RPPK.04.03.02-18-0034/18