Thermomodernisation of the Primary School building in Młynarze (Q4416746): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts) |
||||||||||||||
label / en | label / en | ||||||||||||||
Thermomodernisation of the Primary School building in Młynarze | |||||||||||||||
Property / summary | |||||||||||||||
The project is aimed at reducing emissions of CO2 pollutants into the atmosphere by comprehensive thermo-modernisation of the public utility building, including the replacement of heating devices with the use of RES FOOTOWOLTAICS and HEAT POMP, in connection with the idea of environmental protection and increasing energy efficiency in the public sector. The project concerns deep thermal modernisation and replacement of outdated and non-organic heating devices in the building of the Primary School in the Młynarze Commune. The project uses the legally required type of boilers complying with the principles of ecodesign so as to achieve the best possible energy effect while maintaining the profitability of the investment. All listed heating installations will be characterised by compliance with the standards expressed in Resolution No 162/17 of the Mazowieckie Regional Parliament of 24 October 2017 on the introduction of restrictions and prohibitions on the operation of installations in which fuel combustion takes place in the Mazowieckie Voivodeship. Therefore, the project directly refers to the anti-smog resolution by meeting all legal requirements related to ecodesign. The replacement of heating equipment is eligible for support as a significant reduction of CO2 has been ensured for existing installations (by at least 30 % in the case of a change in combustion fuel). As investments in this area are of a long-term nature, the project complies with EU rules. The heating appliances included in the design will meet the minimum energy efficiency and pollutant emission standards set out in the implementing measures of Directive 2009/125/EC of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products (applicable from the end of 2020). As a result of the project, CO2 reduction tons/year will be 74, (English) | |||||||||||||||
Property / summary: The project is aimed at reducing emissions of CO2 pollutants into the atmosphere by comprehensive thermo-modernisation of the public utility building, including the replacement of heating devices with the use of RES FOOTOWOLTAICS and HEAT POMP, in connection with the idea of environmental protection and increasing energy efficiency in the public sector. The project concerns deep thermal modernisation and replacement of outdated and non-organic heating devices in the building of the Primary School in the Młynarze Commune. The project uses the legally required type of boilers complying with the principles of ecodesign so as to achieve the best possible energy effect while maintaining the profitability of the investment. All listed heating installations will be characterised by compliance with the standards expressed in Resolution No 162/17 of the Mazowieckie Regional Parliament of 24 October 2017 on the introduction of restrictions and prohibitions on the operation of installations in which fuel combustion takes place in the Mazowieckie Voivodeship. Therefore, the project directly refers to the anti-smog resolution by meeting all legal requirements related to ecodesign. The replacement of heating equipment is eligible for support as a significant reduction of CO2 has been ensured for existing installations (by at least 30 % in the case of a change in combustion fuel). As investments in this area are of a long-term nature, the project complies with EU rules. The heating appliances included in the design will meet the minimum energy efficiency and pollutant emission standards set out in the implementing measures of Directive 2009/125/EC of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products (applicable from the end of 2020). As a result of the project, CO2 reduction tons/year will be 74, (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is aimed at reducing emissions of CO2 pollutants into the atmosphere by comprehensive thermo-modernisation of the public utility building, including the replacement of heating devices with the use of RES FOOTOWOLTAICS and HEAT POMP, in connection with the idea of environmental protection and increasing energy efficiency in the public sector. The project concerns deep thermal modernisation and replacement of outdated and non-organic heating devices in the building of the Primary School in the Młynarze Commune. The project uses the legally required type of boilers complying with the principles of ecodesign so as to achieve the best possible energy effect while maintaining the profitability of the investment. All listed heating installations will be characterised by compliance with the standards expressed in Resolution No 162/17 of the Mazowieckie Regional Parliament of 24 October 2017 on the introduction of restrictions and prohibitions on the operation of installations in which fuel combustion takes place in the Mazowieckie Voivodeship. Therefore, the project directly refers to the anti-smog resolution by meeting all legal requirements related to ecodesign. The replacement of heating equipment is eligible for support as a significant reduction of CO2 has been ensured for existing installations (by at least 30 % in the case of a change in combustion fuel). As investments in this area are of a long-term nature, the project complies with EU rules. The heating appliances included in the design will meet the minimum energy efficiency and pollutant emission standards set out in the implementing measures of Directive 2009/125/EC of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products (applicable from the end of 2020). As a result of the project, CO2 reduction tons/year will be 74, (English) / qualifier | |||||||||||||||
point in time: 21 October 2022
|
Revision as of 13:32, 21 October 2022
Project Q4416746 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermomodernisation of the Primary School building in Młynarze |
Project Q4416746 in Poland |
Statements
662,852.86 zloty
0 references
147,352.19 Euro
0 references
828,566.08 zloty
0 references
184,190.24 Euro
0 references
80.0 percent
0 references
3 June 2020
0 references
29 April 2022
0 references
GMINA MŁYNARZE
0 references
Przedmiotowy projekt jest ukierunkowany na ograniczenie emisji zanieczyszczeń CO2 do atmosfery poprzez kompleksową termomodernizację budynku użyteczności publicznej, w tym wymianę urządzeń grzewczych z wykorzystaniem OZE OGNIW FOTOWOLTAICZNYCH oraz POMP CIEPŁA, w związku z ideą ochrony środowiska i zwiększeniem efektywności energetycznej w sektorze publicznym. Projekt dotyczy głębokiej termomodernizacji oraz wymiany przestarzałych i nieekologicznych urządzeń grzewczych w budynku Szkoły podstawowej na terenie Gminy Młynarze. W projekcie zastosowano wymagany prawem rodzaj kotłów spełniających zasady ekoprojektu tak żeby uzyskać jak najlepszy efekt energetyczny przy zachowaniu opłacalności inwestycji. Wszystkie wymieniane instalacje grzewcze będą charakteryzować się spełnieniem norm wyrażonych w Uchwale nr 162/17 Sejmiku Województwa Mazowieckiego z dnia 24 października 2017 r. w sprawie wprowadzenia na obszarze województwa mazowieckiego ograniczeń i zakazów w zakresie eksploatacji instalacji, w których następuje spalanie paliw. Dlatego projekt bezpośrednio odnosi się do uchwały antysmogowej poprzez spełnienie wszystkich wymogów prawnych związanych z ekoprojektem. Wymiana urządzeń grzewczych kwalifikuje się do wsparcia ponieważ zapewniona została znaczna redukcja CO2 w odniesieniu do istniejących instalacji (o co najmniej 30% w przypadku zmiany spalanego paliwa). Ze względu na to, że inwestycje w tym zakresie mają długotrwały charakter, projekt jest zgodny z przepisami unijnymi. Ujęte w projekcie urządzenia do ogrzewania będą spełniały normy w zakresie zapewniającym minimalny poziomem efektywności energetycznej i normy emisji zanieczyszczeń, które zostały określone w środkach wykonawczych do dyrektywy 2009/125/WE z dnia 21 października 2009 r., ustanawiającej ogólne zasady ustalania wymogów dotyczących ekoprojektu dla produktów związanych z energią (obowiązujące od końca 2020 r.). W wyniku realizacji projektu Stopień redukcji CO2 tony/rok wyniesie 74, (Polish)
0 references
The project is aimed at reducing emissions of CO2 pollutants into the atmosphere by comprehensive thermo-modernisation of the public utility building, including the replacement of heating devices with the use of RES FOOTOWOLTAICS and HEAT POMP, in connection with the idea of environmental protection and increasing energy efficiency in the public sector. The project concerns deep thermal modernisation and replacement of outdated and non-organic heating devices in the building of the Primary School in the Młynarze Commune. The project uses the legally required type of boilers complying with the principles of ecodesign so as to achieve the best possible energy effect while maintaining the profitability of the investment. All listed heating installations will be characterised by compliance with the standards expressed in Resolution No 162/17 of the Mazowieckie Regional Parliament of 24 October 2017 on the introduction of restrictions and prohibitions on the operation of installations in which fuel combustion takes place in the Mazowieckie Voivodeship. Therefore, the project directly refers to the anti-smog resolution by meeting all legal requirements related to ecodesign. The replacement of heating equipment is eligible for support as a significant reduction of CO2 has been ensured for existing installations (by at least 30 % in the case of a change in combustion fuel). As investments in this area are of a long-term nature, the project complies with EU rules. The heating appliances included in the design will meet the minimum energy efficiency and pollutant emission standards set out in the implementing measures of Directive 2009/125/EC of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products (applicable from the end of 2020). As a result of the project, CO2 reduction tons/year will be 74, (English)
21 October 2022
0 references
WOJ.: MAZOWIECKIE, POW.: makowski
0 references
Identifiers
RPMA.04.02.00-14-I183/20
0 references