THE SCOPE OF THE PROJECT “CONSTRUCTION OF ACCESS TO THE JUNCTION ON THE A1 MOTORWAY — CONSTRUCTION OF STAGE III OF THE UPPER ROUTE” INCLUDES THE FOLLOWING TASKS: TASK 1 PREPARATORY WORK — THE SCOPE OF THE TASK INCLUDES THE PREPARATION OF PROJECT DOCUMENTATION NECESSARY FOR THE PROPER IMPLEMENTATION OF THE PROJECT. TASK 2 CONSTRUCTION WORKS — THE SCOPE OF THE TASK INCLUDES THE FOLLOWING ELEMENTS: ROAD WORKS RELATED TO THE CONSTRUCTION OF UPPER ROUTE III WITH ACCESS ROADS, CONSTRUCTION OF LIGHTING, CONSTRUCTION OF A TECHNOLOGICAL CHANNEL, ROAD WORKS RELATED TO THE CONSTRUCTION OF BUS BAYS; ENGINEERING FACILITIES — DRAINAGE AND MIGRATION CULVERTS FOR ANIMALS AND ACOUSTIC SCREENS, DRAINAGE AND DRAINAGE — DRAINAGE DITCHES, RETENTION TANKS AND SEWER COLLECTORS, OTHER WORKS — REMOVAL OF COLLISIONS OF WATER, GAS, ENERGY AND COMMUNICATION NETWORKS, TASK 3 INDIRECT COSTS — THE SCOPE OF THE TASK INCLUDES THE COSTS OF THE CONTRACT ENGINEER, AUTHOR’S SUPERVISION AND INFORMATION AND PROMOTION, THE IMPLEMENTATION OF THE EC PROJECT WILL ACHIEVE THE OBJECTIVES OF THE PROJECT AND, ABOVE ALL, WILL CONTRIBUTE TO THE MAIN OBJECTIVE OF: INCREASE THE COMFORT AND QUALITY OF LIFE OF BOAT RESIDENTS, INCREASE THE SAFETY OF TRAFFIC OF VEHICLES AND PEDESTRIANS, ELIMINATE LOCAL TRAFFIC DIFFICULTIES, INCREASE DRIVING COMFORT AND REDUCE DRIVING TIME IN THE ANALYSED FRAGMENT OF UL. COLUMNS AND KALINOWSKI. THE TARGET GROUP OF THE PROJECT IS THE INHABITANTS OF THE CITY OF BOATS AND THE SURROUNDING AREA (THE NUMBER OF INHABITANTS OF THE BOAT IS ABOUT 677 THOUSAND. — DATA AT THE END OF 2020, STATISTICAL OFFICE IN THE BOAT), TOURISTS AND PEOPLE PASSING THROUGH THE BOAT (TRANSIT TRAFFIC). (English)
Property / summary: THE SCOPE OF THE PROJECT “CONSTRUCTION OF ACCESS TO THE JUNCTION ON THE A1 MOTORWAY — CONSTRUCTION OF STAGE III OF THE UPPER ROUTE” INCLUDES THE FOLLOWING TASKS: TASK 1 PREPARATORY WORK — THE SCOPE OF THE TASK INCLUDES THE PREPARATION OF PROJECT DOCUMENTATION NECESSARY FOR THE PROPER IMPLEMENTATION OF THE PROJECT. TASK 2 CONSTRUCTION WORKS — THE SCOPE OF THE TASK INCLUDES THE FOLLOWING ELEMENTS: ROAD WORKS RELATED TO THE CONSTRUCTION OF UPPER ROUTE III WITH ACCESS ROADS, CONSTRUCTION OF LIGHTING, CONSTRUCTION OF A TECHNOLOGICAL CHANNEL, ROAD WORKS RELATED TO THE CONSTRUCTION OF BUS BAYS; ENGINEERING FACILITIES — DRAINAGE AND MIGRATION CULVERTS FOR ANIMALS AND ACOUSTIC SCREENS, DRAINAGE AND DRAINAGE — DRAINAGE DITCHES, RETENTION TANKS AND SEWER COLLECTORS, OTHER WORKS — REMOVAL OF COLLISIONS OF WATER, GAS, ENERGY AND COMMUNICATION NETWORKS, TASK 3 INDIRECT COSTS — THE SCOPE OF THE TASK INCLUDES THE COSTS OF THE CONTRACT ENGINEER, AUTHOR’S SUPERVISION AND INFORMATION AND PROMOTION, THE IMPLEMENTATION OF THE EC PROJECT WILL ACHIEVE THE OBJECTIVES OF THE PROJECT AND, ABOVE ALL, WILL CONTRIBUTE TO THE MAIN OBJECTIVE OF: INCREASE THE COMFORT AND QUALITY OF LIFE OF BOAT RESIDENTS, INCREASE THE SAFETY OF TRAFFIC OF VEHICLES AND PEDESTRIANS, ELIMINATE LOCAL TRAFFIC DIFFICULTIES, INCREASE DRIVING COMFORT AND REDUCE DRIVING TIME IN THE ANALYSED FRAGMENT OF UL. COLUMNS AND KALINOWSKI. THE TARGET GROUP OF THE PROJECT IS THE INHABITANTS OF THE CITY OF BOATS AND THE SURROUNDING AREA (THE NUMBER OF INHABITANTS OF THE BOAT IS ABOUT 677 THOUSAND. — DATA AT THE END OF 2020, STATISTICAL OFFICE IN THE BOAT), TOURISTS AND PEOPLE PASSING THROUGH THE BOAT (TRANSIT TRAFFIC). (English) / rank
 
Normal rank
Property / summary: THE SCOPE OF THE PROJECT “CONSTRUCTION OF ACCESS TO THE JUNCTION ON THE A1 MOTORWAY — CONSTRUCTION OF STAGE III OF THE UPPER ROUTE” INCLUDES THE FOLLOWING TASKS: TASK 1 PREPARATORY WORK — THE SCOPE OF THE TASK INCLUDES THE PREPARATION OF PROJECT DOCUMENTATION NECESSARY FOR THE PROPER IMPLEMENTATION OF THE PROJECT. TASK 2 CONSTRUCTION WORKS — THE SCOPE OF THE TASK INCLUDES THE FOLLOWING ELEMENTS: ROAD WORKS RELATED TO THE CONSTRUCTION OF UPPER ROUTE III WITH ACCESS ROADS, CONSTRUCTION OF LIGHTING, CONSTRUCTION OF A TECHNOLOGICAL CHANNEL, ROAD WORKS RELATED TO THE CONSTRUCTION OF BUS BAYS; ENGINEERING FACILITIES — DRAINAGE AND MIGRATION CULVERTS FOR ANIMALS AND ACOUSTIC SCREENS, DRAINAGE AND DRAINAGE — DRAINAGE DITCHES, RETENTION TANKS AND SEWER COLLECTORS, OTHER WORKS — REMOVAL OF COLLISIONS OF WATER, GAS, ENERGY AND COMMUNICATION NETWORKS, TASK 3 INDIRECT COSTS — THE SCOPE OF THE TASK INCLUDES THE COSTS OF THE CONTRACT ENGINEER, AUTHOR’S SUPERVISION AND INFORMATION AND PROMOTION, THE IMPLEMENTATION OF THE EC PROJECT WILL ACHIEVE THE OBJECTIVES OF THE PROJECT AND, ABOVE ALL, WILL CONTRIBUTE TO THE MAIN OBJECTIVE OF: INCREASE THE COMFORT AND QUALITY OF LIFE OF BOAT RESIDENTS, INCREASE THE SAFETY OF TRAFFIC OF VEHICLES AND PEDESTRIANS, ELIMINATE LOCAL TRAFFIC DIFFICULTIES, INCREASE DRIVING COMFORT AND REDUCE DRIVING TIME IN THE ANALYSED FRAGMENT OF UL. COLUMNS AND KALINOWSKI. THE TARGET GROUP OF THE PROJECT IS THE INHABITANTS OF THE CITY OF BOATS AND THE SURROUNDING AREA (THE NUMBER OF INHABITANTS OF THE BOAT IS ABOUT 677 THOUSAND. — DATA AT THE END OF 2020, STATISTICAL OFFICE IN THE BOAT), TOURISTS AND PEOPLE PASSING THROUGH THE BOAT (TRANSIT TRAFFIC). (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:57, 21 October 2022

Project Q4416200 in Poland
Language Label Description Also known as
English
CONSTRUCTION OF ACCESS TO THE JUNCTION ON THE A1 MOTORWAY — CONSTRUCTION OF THE THIRD STAGE OF THE UPPER ROUTE
Project Q4416200 in Poland

    Statements

    0 references
    62,440,245.88 zloty
    0 references
    13,880,466.66 Euro
    0 references
    125,424,212.02 zloty
    0 references
    27,881,802.33 Euro
    0 references
    49.78 percent
    0 references
    1 August 2016
    0 references
    31 December 2023
    0 references
    WOJEWÓDZTWO ŁÓDZKIE -
    0 references
    0 references
    ZAKRES PROJEKTU „BUDOWA DOJAZDU DO WĘZŁA NA AUTOSTRADZIE A1 – BUDOWA III ETAPU TRASY GÓRNA” OBEJMUJE WYKONANIE NASTĘPUJĄCYCH ZADAŃ: ZADANIE 1 PRACE PRZYGOTOWAWCZE - ZAKRES ZADANIA OBEJMUJE OPRACOWANIE DOKUMENTACJI PROJEKTOWEJ NIEZBĘDNEJ DO PRAWIDŁOWEJ REALIZACJI PROJEKTU. ZADANIE 2 PRACE BUDOWLANE - ZAKRES ZADANIA OBEJMUJE NASTĘPUJĄCE ELEMENTY: ROBOTY DROGOWE ZWIĄZANE Z BUDOWĄ TRASY GÓRNEJ III WRAZ Z DROGAMI DOJAZDOWYMI, BUDOWA OŚWIETLENIA, BUDOWA KANAŁU TECHNOLOGICZNEGO, ROBOTY DROGOWE ZWIĄZANE Z BUDOWĄ ZATOK AUTOBUSOWYCH; OBIEKTY INŻYNIERSKIE – PRZEPUSTY MELIORACYJNE I MIGRACYJNE DLA ZWIERZĄT ORAZ EKRANY AKUSTYCZNE, MELIORACJA I ODWODNIENIE – ROWY MELIORACYJNE, ZBIORNIKI RETENCYJNE I KOLEKTOR KANALIZACJI, POZOSTAŁE ROBOTY – USUNIĘCIE KOLIZJI SIECI WODOCIĄGOWYCH, GAZOWYCH, ENERGETYCZNYCH I KOMUNIKACYJNYCH, ZADANIE 3 KOSZTY POŚREDNIE – ZAKRES ZADANIA OBEJMUJE KOSZTY INŻYNIERA KONTRAKTU, NADZORU AUTORSKIEGO ORAZ INFORMACJI I PROMOCJI REALIZACJA PROJEKTU WE WSKAZANYM ZAKRESIE POZWOLI NA OSIĄGNIĘCIE CELÓW PROJEKTU A PRZEDE WSZYSTKIM PRZYCZYNI SIĘ DO OSIĄGNIĘCIA CELU GŁÓWNEGO, JAKIM JEST: PODNIESIENIE KOMFORTU I JAKOŚCI ŻYCIA MIESZKAŃCÓW ŁODZI, ZWIĘKSZENIE BEZPIECZEŃSTWA RUCHU POJAZDÓW I PIESZYCH, ELIMINACJĘ UTRUDNIEŃ W RUCHU LOKALNYM, ZWIĘKSZENIE KOMFORTU JAZDY I SKRÓCENIE CZASU JAZDY ANALIZOWANYM FRAGMENTEM UL. KOLUMNY I KALINOWSKIEGO. GRUPĄ DOCELOWĄ PROJEKTU SĄ MIESZKAŃCY MIASTA ŁODZI I OKOLIC (LICZBA MIESZKAŃCÓW ŁODZI TO OKOŁO 677 TYS. – DANE NA KONIEC ROKU 2020, URZĄD STATYSTYCZNY W ŁODZI), TURYŚCI ORAZ OSOBY PRZEJEŻDŻAJĄCE PRZEZ ŁÓDŹ (RUCH TRANZYTOWY). (Northern Sami)
    0 references
    THE SCOPE OF THE PROJECT “CONSTRUCTION OF ACCESS TO THE JUNCTION ON THE A1 MOTORWAY — CONSTRUCTION OF STAGE III OF THE UPPER ROUTE” INCLUDES THE FOLLOWING TASKS: TASK 1 PREPARATORY WORK — THE SCOPE OF THE TASK INCLUDES THE PREPARATION OF PROJECT DOCUMENTATION NECESSARY FOR THE PROPER IMPLEMENTATION OF THE PROJECT. TASK 2 CONSTRUCTION WORKS — THE SCOPE OF THE TASK INCLUDES THE FOLLOWING ELEMENTS: ROAD WORKS RELATED TO THE CONSTRUCTION OF UPPER ROUTE III WITH ACCESS ROADS, CONSTRUCTION OF LIGHTING, CONSTRUCTION OF A TECHNOLOGICAL CHANNEL, ROAD WORKS RELATED TO THE CONSTRUCTION OF BUS BAYS; ENGINEERING FACILITIES — DRAINAGE AND MIGRATION CULVERTS FOR ANIMALS AND ACOUSTIC SCREENS, DRAINAGE AND DRAINAGE — DRAINAGE DITCHES, RETENTION TANKS AND SEWER COLLECTORS, OTHER WORKS — REMOVAL OF COLLISIONS OF WATER, GAS, ENERGY AND COMMUNICATION NETWORKS, TASK 3 INDIRECT COSTS — THE SCOPE OF THE TASK INCLUDES THE COSTS OF THE CONTRACT ENGINEER, AUTHOR’S SUPERVISION AND INFORMATION AND PROMOTION, THE IMPLEMENTATION OF THE EC PROJECT WILL ACHIEVE THE OBJECTIVES OF THE PROJECT AND, ABOVE ALL, WILL CONTRIBUTE TO THE MAIN OBJECTIVE OF: INCREASE THE COMFORT AND QUALITY OF LIFE OF BOAT RESIDENTS, INCREASE THE SAFETY OF TRAFFIC OF VEHICLES AND PEDESTRIANS, ELIMINATE LOCAL TRAFFIC DIFFICULTIES, INCREASE DRIVING COMFORT AND REDUCE DRIVING TIME IN THE ANALYSED FRAGMENT OF UL. COLUMNS AND KALINOWSKI. THE TARGET GROUP OF THE PROJECT IS THE INHABITANTS OF THE CITY OF BOATS AND THE SURROUNDING AREA (THE NUMBER OF INHABITANTS OF THE BOAT IS ABOUT 677 THOUSAND. — DATA AT THE END OF 2020, STATISTICAL OFFICE IN THE BOAT), TOURISTS AND PEOPLE PASSING THROUGH THE BOAT (TRANSIT TRAFFIC). (English)
    21 October 2022
    0 references
    WOJ.: ŁÓDZKIE, POW.: Łódź
    0 references

    Identifiers

    RPLD.03.02.01-10-0002/21
    0 references