Active in reintegration (Q4419068): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts)
label / enlabel / en
 
Active in reintegration
Property / summary
 
P consists of providing support to 108UP (52K,56M), including 17ON (10K,7M), i.e. idolatry and ecclesiastical community from the district of lightning — complete. The main objective of P is to increase the employability of 108 UP(52K,56M) including 17 ON of people at risk of poverty and social exclusion in the period from 01.03.2022 to 31.03.2023,and increase the number of places in CIS Żary from 46 to 54 (increase by 8 places). P assumes adaptation and repair activities of the base in order to raise the CIS standard. She prepares UP to perform the profession of PCK sister, assistant cook, cobbler, professional cleaning and maid, employee of finishing works in construction, cleaning work with maintenance of green areas and winter maintenance of pedestrian routes. Defined professions are in accordance with the 2020 Competition Barometer for the district of lightning, opub. by PUP Żary: www.barometrzawodow.pl (English)
Property / summary: P consists of providing support to 108UP (52K,56M), including 17ON (10K,7M), i.e. idolatry and ecclesiastical community from the district of lightning — complete. The main objective of P is to increase the employability of 108 UP(52K,56M) including 17 ON of people at risk of poverty and social exclusion in the period from 01.03.2022 to 31.03.2023,and increase the number of places in CIS Żary from 46 to 54 (increase by 8 places). P assumes adaptation and repair activities of the base in order to raise the CIS standard. She prepares UP to perform the profession of PCK sister, assistant cook, cobbler, professional cleaning and maid, employee of finishing works in construction, cleaning work with maintenance of green areas and winter maintenance of pedestrian routes. Defined professions are in accordance with the 2020 Competition Barometer for the district of lightning, opub. by PUP Żary: www.barometrzawodow.pl (English) / rank
 
Normal rank
Property / summary: P consists of providing support to 108UP (52K,56M), including 17ON (10K,7M), i.e. idolatry and ecclesiastical community from the district of lightning — complete. The main objective of P is to increase the employability of 108 UP(52K,56M) including 17 ON of people at risk of poverty and social exclusion in the period from 01.03.2022 to 31.03.2023,and increase the number of places in CIS Żary from 46 to 54 (increase by 8 places). P assumes adaptation and repair activities of the base in order to raise the CIS standard. She prepares UP to perform the profession of PCK sister, assistant cook, cobbler, professional cleaning and maid, employee of finishing works in construction, cleaning work with maintenance of green areas and winter maintenance of pedestrian routes. Defined professions are in accordance with the 2020 Competition Barometer for the district of lightning, opub. by PUP Żary: www.barometrzawodow.pl (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:51, 21 October 2022

Project Q4419068 in Poland
Language Label Description Also known as
English
Active in reintegration
Project Q4419068 in Poland

    Statements

    0 references
    1,430,192.15 zloty
    0 references
    317,931.71 Euro
    0 references
    1,682,579.0 zloty
    0 references
    374,037.31 Euro
    0 references
    85.0 percent
    0 references
    1 March 2022
    0 references
    31 March 2023
    0 references
    FUNDACJA CENTRUM ROZWOJU SPOŁECZNO - EDUKACYJNO - GOSPODARCZEGO
    0 references
    0 references
    0 references
    P polega na objęciu wsparciem 108UP (52K,56M), w tym 17ON (10K,7M), zag. ubóst. i wykl. społ. z terenu powiatu żarskiego - speł. kryt. form. nr 8. Celem głównym p jest wzrostzdolności do zatrudnienia 108 UP(52K,56M) w tym 17 ON osób zagrożonych ubóstwem i wykluczeniem społecznym w okresie od 01.03.2022r. do 31.03.2023r.,oraz zwiększenieliczby miejsc w CIS Żary z 46 do 54 (zwiększenie o 8 miejsc).P obejmuje działania z zakresu reintegracji społ-zawodowej realizowane przez CIS Żary. P zakłada działania adaptacyjno-remontowe bazy w celu podniesienia standardu CIS. Pprzygotowuje UP do wykon. zawodu siostry PCK, pomocnik kucharza, brukarza, profesjonalnego sprzątania oraz zawodu pokojówka, pracownik robót wykończeniowych wbudownictwie, prac porządkowych z utrzymaniem terenów zielonych oraz z zimowym utrzymaniem ciągów pieszych. Zdefiniowane zawody są zgodne z Barometrem zawodów 2020dla powiatu żarskiego, opub. przez PUP Żary: www.barometrzawodow.pl. (Polish)
    0 references
    P consists of providing support to 108UP (52K,56M), including 17ON (10K,7M), i.e. idolatry and ecclesiastical community from the district of lightning — complete. The main objective of P is to increase the employability of 108 UP(52K,56M) including 17 ON of people at risk of poverty and social exclusion in the period from 01.03.2022 to 31.03.2023,and increase the number of places in CIS Żary from 46 to 54 (increase by 8 places). P assumes adaptation and repair activities of the base in order to raise the CIS standard. She prepares UP to perform the profession of PCK sister, assistant cook, cobbler, professional cleaning and maid, employee of finishing works in construction, cleaning work with maintenance of green areas and winter maintenance of pedestrian routes. Defined professions are in accordance with the 2020 Competition Barometer for the district of lightning, opub. by PUP Żary: www.barometrzawodow.pl (English)
    21 October 2022
    0 references
    WOJ.: LUBUSKIE, POW.: żarski
    0 references

    Identifiers

    RPLB.07.04.01-08-0004/20
    0 references