EVERYBODY CAN GROW (Q1871656): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): THE PROJECT ENVISAGES THE RETROFITTING AND LIMPLEMENTATION OF THE EXISTING ETHERNET NETWORK THROUGH THE CLEANING UP OF THE EXISTING MISSING TRACK DATA ADDITION OF ACTIVE DEVICES FOR THE SEAMLESS DISTRIBUTION OF THE ETHERNET NETWORK FOR NEW DATA LINES THAT ARE CURRENTLY MISSING, THE WIRELESS DATA NETWORK WITH THE ADDITION OF THE NEW ACCESS POINTS CAPABLE OF MOVING FURNITURE SUCH AS SMARTPHONES AND TABLETS IS FORESEEN TO BE EXPANDED. THERE ARE ALS...) |
||
Property / summary | |||
THE PROJECT ENVISAGES THE RETROFITTING AND LIMPLEMENTATION OF THE EXISTING ETHERNET NETWORK THROUGH THE CLEANING UP OF THE EXISTING MISSING TRACK DATA ADDITION OF ACTIVE DEVICES FOR THE SEAMLESS DISTRIBUTION OF THE ETHERNET NETWORK FOR NEW DATA LINES THAT ARE CURRENTLY MISSING, THE WIRELESS DATA NETWORK WITH THE ADDITION OF THE NEW ACCESS POINTS CAPABLE OF MOVING FURNITURE SUCH AS SMARTPHONES AND TABLETS IS FORESEEN TO BE EXPANDED. THERE ARE ALSO TWO KITS FOR THE DEPLOYMENT OF THE FULL 80 LIBYECON ETHERNET NETWORK FOR DISABLED PEOPLE OF 11 LIBENZECON. IT IS ASSUMED THAT IT WILL BE POSSIBLE TO COMPLETE THE 60 ETHERNET NETWORK AND WIRELESS NETWORK. (English) | |||
Property / summary: THE PROJECT ENVISAGES THE RETROFITTING AND LIMPLEMENTATION OF THE EXISTING ETHERNET NETWORK THROUGH THE CLEANING UP OF THE EXISTING MISSING TRACK DATA ADDITION OF ACTIVE DEVICES FOR THE SEAMLESS DISTRIBUTION OF THE ETHERNET NETWORK FOR NEW DATA LINES THAT ARE CURRENTLY MISSING, THE WIRELESS DATA NETWORK WITH THE ADDITION OF THE NEW ACCESS POINTS CAPABLE OF MOVING FURNITURE SUCH AS SMARTPHONES AND TABLETS IS FORESEEN TO BE EXPANDED. THERE ARE ALSO TWO KITS FOR THE DEPLOYMENT OF THE FULL 80 LIBYECON ETHERNET NETWORK FOR DISABLED PEOPLE OF 11 LIBENZECON. IT IS ASSUMED THAT IT WILL BE POSSIBLE TO COMPLETE THE 60 ETHERNET NETWORK AND WIRELESS NETWORK. (English) / rank | |||
Normal rank |
Revision as of 22:20, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | EVERYBODY CAN GROW |
Project in Italy financed by DG Regio |
Statements
18,373.06 Euro
0 references
18,373.06 Euro
0 references
100.0 percent
0 references
15 February 2016
0 references
5 August 2016
0 references
10 December 2016
0 references
ISTITUTO COMPRENSIVO C. NIVOLA IGLESIAS
0 references
IL PROGETTO PREVEDE LADEGUAMENTO E LIMPLEMENTAZIONE DELLA RETE ETHERNET ESISTENTE MEDIANTE BONIFICA DEI RACK DATI ESISTENTI AGGIUNTA DI RACK MANCANTI AGGIUNTA DI APPARATI ATTIVI PER LA DISTRIBUZIONE UNIVOCA DELLA RETE ETHERNET REALIZZAZIONE DI NUOVE LINEE DATI ATTUALMENTE MANCANTI SI PREVISTO LAMPLIAMENTO DELLA RETE DATI WIRELESS CON LAGGIUNTA DI ACCESS NUOVI ACCES POINT IDONEI ALLA CONNETTIVIT DI APPARTI MOBILI QUALI SMARTPHONE E TABLET SONO PREVISTI INOLTRE DUE KIT PER LA FRUIZIONE DELLHARDWARE COLLABORATIVO MULTIMEDIALE PER DISABILI COMPLETO DI 11 LICENZECON LINTERVENTO PREVISTO SI IPOTIZZA DI POTER REALIZZARE IL COMPLETAMENTO DELLA RETE ETHERNET ALL80 E WIRELESS AL 60 (Italian)
0 references
THE PROJECT ENVISAGES THE RETROFITTING AND LIMPLEMENTATION OF THE EXISTING ETHERNET NETWORK THROUGH THE CLEANING UP OF THE EXISTING MISSING TRACK DATA ADDITION OF ACTIVE DEVICES FOR THE SEAMLESS DISTRIBUTION OF THE ETHERNET NETWORK FOR NEW DATA LINES THAT ARE CURRENTLY MISSING, THE WIRELESS DATA NETWORK WITH THE ADDITION OF THE NEW ACCESS POINTS CAPABLE OF MOVING FURNITURE SUCH AS SMARTPHONES AND TABLETS IS FORESEEN TO BE EXPANDED. THERE ARE ALSO TWO KITS FOR THE DEPLOYMENT OF THE FULL 80 LIBYECON ETHERNET NETWORK FOR DISABLED PEOPLE OF 11 LIBENZECON. IT IS ASSUMED THAT IT WILL BE POSSIBLE TO COMPLETE THE 60 ETHERNET NETWORK AND WIRELESS NETWORK. (English)
0 references
Identifiers
I56J16000100007
0 references