Construction of the line 110 kV Jasiniec – Świecie together with the reconstruction of the 110/15 kV Fordon station in order to increase security of electricity supply (Q86144): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,)
(‎Changed an Item: Discontinued project)
 
Property / instance of: Kohesio project / rankProperty / instance of: Kohesio project / rank
Normal rank
Deprecated rank
Property / instance of
 
Property / instance of: Discontinued Kohesio Project / rank
 
Normal rank

Latest revision as of 11:25, 18 October 2022

Project Q86144 in Poland
Language Label Description Also known as
English
Construction of the line 110 kV Jasiniec – Świecie together with the reconstruction of the 110/15 kV Fordon station in order to increase security of electricity supply
Project Q86144 in Poland

    Statements

    0 references
    13,480,432.13 zloty
    0 references
    3,235,303.71 Euro
    13 January 2020
    0 references
    23,299,211.0 zloty
    0 references
    5,591,810.64 Euro
    13 January 2020
    0 references
    57.86 percent
    0 references
    6 July 2018
    0 references
    31 December 2021
    0 references
    ENEA OPERATOR SP. Z O.O.
    0 references
    0 references

    53°7'46.9"N, 18°1'45.8"E
    0 references
    Zakłada się realizację Projektu w dwóch zadaniach: 1) Budowa linii kablowo-napowietrznej 110 kV, 2) Przebudowa rozdzielni 110 kV w GPZ Fordon, W przypadku Zadania 1 zakres Projektu obejmuje budowę 2-torowej linii kablowo-napowietrznej 110 kV od miejsca lokalizacji GPZ Fordon do nacięcia linii 110 kV Jasiniec - Świecie o długości około 3,5 km i przekroju 1000 mm2 Cu (linia kablowa) oraz długości około 5,3 km i przekroju 240 mm2 + 80°C (linia napowietrzna). W przypadku Zadania 2 zakres Projektu obejmuje przebudowę istniejącej rozdzielni 110 kV w GPZ Fordon do układu 1S w technologii SF6 (wyłączniki) w obmiarze 4 pól liniowych, 2 pól transformatorowych 110/SN oraz pola sprzęgła podłużnego. (Polish)
    0 references
    The project is to be implemented in two tasks: 1) Construction of cable and overhead line 110 kV, 2) Reconstruction of the 110 kV switchboard in the Fordon GPZ, In the case of Task 1 the scope of the Project includes the construction of a 2-track cable and overhead line 110 kV from the location of the GPZ Fordon to the incision of the line 110 kV Jasiniec – The world with a length of approximately 3.5 km and a cross section of 1000 mm² Cu (cable line) and length of approximately 5,3 km + section of 240. In the case of Task 2, the scope of the Project includes the reconstruction of the existing 110 kV switchgear in the Fordon GPZ to 1S in SF6 technology (switches) in the measurement of 4 linear fields, 2 transformer fields 110/SN and longitudinal coupling fields. (English)
    14 October 2020
    0 references
    Le projet devrait être mis en œuvre en deux tâches: Dans le cas de la tâche 1, le champ d’application du projet comprend la construction d’une ligne de câbles de 110 kV à partir de l’emplacement de GPZ Fordon jusqu’à l’incision de la ligne de 110 kV Jasiniec — World d’une longueur d’environ 3,5 km et d’une section transversale de 1 000 mm² Cu (ligne de câble) et d’une longueur d’environ 5,3 km et d’une section transversale de 240 mm² + 80 °C (ligne de tête). Dans le cas des tâches 2, le champ d’application du projet comprend la conversion d’un appareil de commutation existant de 110 kV en GPZ Fordon en 1S en technologie SF6 (commutateurs) dans 4 champs linéaires, 2 champs de transformateur 110/SN et champs d’embrayage longitudinal. (French)
    30 November 2021
    0 references
    Das Projekt soll in zwei Aufgaben umgesetzt werden: 1) Bau von 110 kV Kabel-Overhead-Linie, 2) Umbau von 110 kV Schaltanlagen in GPZ Fordon. Im Falle von Aufgabe 1 umfasst der Umfang des Projekts den Bau einer 2-spurigen 110 kV Kabel-Überkopfleitung vom Standort GPZ Fordon bis zum Einschnitt der 110 kV Linie Jasiniec – World mit einer Länge von ca. 3,5 km und einem Querschnitt von 1 000 mm² Cu (Kabellinie) und einer Länge von etwa 5,3 km und einem Querschnitt von 240 mm² + 80 °C (Oberleitung). Bei Aufgaben 2 umfasst der Projektumfang die Umwandlung einer vorhandenen 110 kV Schaltanlage in GPZ Fordon auf 1S in der SF6-Technologie (Schalter) in 4 Linearfeldern, 2 Transformatorfeldern 110/SN und Längskupplungsfeldern. (German)
    7 December 2021
    0 references
    Het project zal naar verwachting in twee taken worden uitgevoerd: 1) Bouw van 110 kV kabel-overheadlijn, 2) Reconstructie van 110 kV schakelapparatuur in GPZ Fordon. In het geval van taak 1 omvat de reikwijdte van het project de bouw van een 2-track 110 kV kabel-overheadlijn vanaf de locatie van GPZ Fordon tot de incisie van de 110 kV lijn Jasiniec — Wereld met een lengte van ongeveer 3,5 km en een dwarsdoorsnede van 1 000 mm² Cu (kabellijn) en een lengte van ongeveer 5,3 km en een dwarsdoorsnede van 240 mm² + 80 °C (overheadlijn). In het geval van taken 2 omvat het project de omzetting van een bestaande 110 kV schakelapparatuur in GPZ Fordon naar 1S in SF6-technologie (schakelaars) in 4 lineaire velden, 2 transformatorvelden 110/SN en longitudinale koppelingsvelden. (Dutch)
    16 December 2021
    0 references
    Il progetto dovrebbe essere attuato nell'ambito di due compiti: 1) Costruzione di 110 kV cavo linea aerea, 2) Ricostruzione di 110 kV quadri in GPZ Fordon. Nel caso di Task 1, l'ambito del progetto comprende la costruzione di una linea cavo a 2 binari 110 kV cavo-overhead dalla posizione di GPZ Fordon fino all'incisione della linea 110 kV Jasiniec — Mondo con una lunghezza di circa 3,5 km e una sezione trasversale di 1 000 mm² Cu (linea cavo) e una lunghezza di circa 5,3 km e una sezione trasversale di 240 mm² + 80ºC (linea aerea). Nel caso dei compiti 2, l'ambito del progetto comprende la conversione di un commutatore esistente da 110 kV in GPZ Fordon a 1S nella tecnologia SF6 (interruttori) in 4 campi lineari, 2 campi del trasformatore 110/SN e campi di frizione longitudinali. (Italian)
    16 January 2022
    0 references
    Se espera que el proyecto se ejecute en dos tareas: 1) Construcción de una línea de 110 kV de cabeza de cable, 2) Reconstrucción de conmutadores de 110 kV en GPZ Fordon. En el caso de la Tarea 1, el alcance del proyecto incluye la construcción de una línea de cable-cabeza de 110 kV de 2 vías desde la ubicación de GPZ Fordon hasta la incisión de la línea de 110 kV Jasiniec — Mundo con una longitud de aproximadamente 3,5 km y una sección transversal de 1 000 mm² Cu (línea por cable) y una longitud de unos 5,3 km y una sección transversal de 240 mm² + 80.°C (línea aérea). En el caso de las tareas 2, el alcance del proyecto incluye la conversión de un conmutador de 110 kV existente en GPZ Fordon a 1S en tecnología SF6 (interruptores) en 4 campos lineales, 2 campos de transformador 110/SN y campos de embrague longitudinales. (Spanish)
    19 January 2022
    0 references
    Projektet skal gennemføres i to opgaver: 1) Opførelse af kabel og køreledning 110 kV, 2) Ombygning af 110 kV strømtavle i Fordon GPZ, I tilfælde af opgave 1 omfatter projektets omfang konstruktion af et 2-sporet kabel og køreledning 110 kV fra placeringen af GPZ Fordon til indsnit af linjen 110 kV Jasiniec âEUR Verden med en længde på ca. 3,5 km og et tværsnit på 1 000 mm² Cu (kabellinje) og en længde på ca. 5,3 km + sektion af 240. I forbindelse med opgave 2 omfatter projektets anvendelsesområde genopbygningen af det eksisterende 110 kV switchgear i Fordon GPZ til 1S i SF6-teknologi (afbrydere) i målingen af 4 lineære felter, 2 transformatorfelter 110/SN og langsgående koblingsfelter. (Danish)
    26 July 2022
    0 references
    Το έργο θα υλοποιηθεί σε δύο καθήκοντα: 1) Κατασκευή καλωδίου και εναέρια γραμμή 110 kV, 2) Ανακατασκευή του πίνακα 110 kV στο Fordon GPZ, Στην περίπτωση του έργου 1 το αντικείμενο του έργου περιλαμβάνει την κατασκευή ενός καλωδίου 2 και εναέρια γραμμή 110 kV από τη θέση του GPZ Fordon μέχρι την τομή της γραμμής 110 kV Jasiniec â EUR Ο κόσμος με μήκος περίπου 3,5 χλμ και μια διατομή 1 000 mm² Cu (καλωδιακή γραμμή) και μήκος περίπου 5,3 km + τμήμα 240. Στην περίπτωση του έργου 2, το πεδίο εφαρμογής του έργου περιλαμβάνει την ανακατασκευή του υφιστάμενου μηχανισμού μεταγωγής 110 kV στο Fordon GPZ σε 1S στην τεχνολογία SF6 (διακόπτες) στη μέτρηση 4 γραμμικών πεδίων, 2 πεδίων μετασχηματιστών 110/SN και διαμήκων πεδίων ζεύξης. (Greek)
    26 July 2022
    0 references
    Projekt će se provoditi u dvije zadaće: 1) Izgradnja kabela i nadzemne linije 110 kV, 2) Rekonstrukcija 110 kV sklopne ploče u Fordon GPZ, U slučaju Zadatka 1 opseg projekta uključuje izgradnju kabela s 2 tračnice i nadzemne linije 110 kV od mjesta GPZ Fordon do reza linije 110 kV Jasiniec â EUR Svijet s duljinom od oko 3,5 km i presjekom 1 000 mm² Cu (kabelska linija) i duljinom od približno 5,3 km + dio 240. U slučaju zadatka 2, opseg projekta uključuje rekonstrukciju postojećih 110 kV sklopnih uređaja u Fordon GPZ na 1S u SF6 tehnologiji (prekidači) u mjerenju 4 linearna polja, 2 polja transformatora 110/SN i uzdužna polja spajanja. (Croatian)
    26 July 2022
    0 references
    Proiectul urmează să fie pus în aplicare în două sarcini: 1) Construcția cablului și a liniei aeriene 110 kV, 2) Reconstrucția tabloului de distribuție 110 kV în Fordon GPZ, În cazul sarcinii 1, domeniul de aplicare al proiectului include construcția unui cablu cu două linii și a unei linii aeriene 110 kV de la locația GPZ Fordon la incizia liniei 110 kV Jasiniec â EUR Lumea cu o lungime de aproximativ 3,5 km și o secțiune transversală de 1 000 mm² Cu (linie de cablu) și lungime de aproximativ 5,3 km + secțiune de 240. În cazul sarcinii 2, domeniul de aplicare al proiectului include reconstrucția aparatelor de comutație de 110 kV existente în Fordon GPZ la 1S în tehnologia SF6 (întrerupătoare) în măsurarea a 4 câmpuri liniare, 2 câmpuri transformatoare 110/SN și câmpuri de cuplare longitudinală. (Romanian)
    26 July 2022
    0 references
    Projekt sa má realizovať v rámci dvoch úloh: 1) Výstavba kábla a nadzemného vedenia 110 kV, 2) Rekonštrukcia rozvádzača 110 kV v Fordon GPZ, V prípade úlohy 1 zahŕňa rozsah projektu výstavbu dvojkoľajového kábla a nadzemného vedenia 110 kV od umiestnenia GPZ Fordon do rezu linky 110 kV Jasiniec â EUR Svet s dĺžkou približne 3,5 km a prierezom 1 000 mm² Cu (káblová linka) a dĺžkou približne 5,3 km + úsek 240. V prípade úlohy 2 zahŕňa rozsah projektu rekonštrukciu existujúcich 110 kV rozvádzačov v Fordon GPZ na 1S v technológii SF6 (prepínače) pri meraní 4 lineárnych polí, 2 polí transformátorov 110/SN a pozdĺžnych spojovacích polí. (Slovak)
    26 July 2022
    0 references
    Il-proġett għandu jiġi implimentat f’żewġ kompiti: 1) Kostruzzjoni ta ‘kejbil u linja overhead 110 kV, 2) Rikostruzzjoni tas-swiċċbord 110 kV fil-Fordon GPZ, Fil-każ ta ‘Kompitu 1 l-ambitu tal-Proġett jinkludi l-kostruzzjoni ta’ kejbil 2-binarji u linja overhead 110 kV mill-post tal-Fordon GPZ għall-inċiżjoni tal-linja 110 kV Jasiniec â EUR Id-dinja b’tul ta ‘madwar 3.5 km u sezzjoni trasversali ta’ 1 000 mm² Cu (linja tal-kejbil) u t-tul ta ‘madwar 5.3 km + sezzjoni ta’ 240. Fil-każ tal-Kompitu 2, l-ambitu tal-Proġett jinkludi r-rikostruzzjoni tas-switchgear ta’ 110 kV eżistenti fil-Fordon GPZ għal 1S fit-teknoloġija SF6 (switches) fil-kejl ta’ 4 oqsma lineari, 2 oqsma tat-transformer 110/SN u oqsma tal-igganċjar lonġitudinali. (Maltese)
    26 July 2022
    0 references
    O projeto deve ser executado em duas tarefas: 1) Construção de cabos e catenárias 110 kV, 2) Reconstrução do quadro de distribuição de 110 kV no Fordon GPZ, no caso da Tarefa 1, o âmbito do projeto inclui a construção de um cabo de duas vias e uma linha aérea 110 kV desde a localização do GPZ Fordon até à incisão da linha 110 kV Jasiniec âEUR O mundo com um comprimento de aproximadamente 3,5 km e uma secção transversal de 1 000 mm² Cu (linha de cabo) e comprimento de aproximadamente 5,3 km + secção de 240. No caso da Tarefa 2, o escopo do Projeto inclui a reconstrução do comutador existente de 110 kV na tecnologia Fordon GPZ para 1S em SF6 (comutadores) na medição de 4 campos lineares, 2 campos de transformadores 110/SN e campos de acoplamento longitudinal. (Portuguese)
    26 July 2022
    0 references
    Hanke toteutetaan kahdessa tehtävässä: 1) Kaapeli- ja ilmajohdon rakentaminen 110 kV, 2) 110 kV:n kytkintaulun uudelleenrakentaminen Fordon GPZ: ssä, Tehtävässä 1 hankkeen soveltamisalaan kuuluu 2-raiteisen kaapelin ja 110 kV:n ilmajohdon rakentaminen GPZ Fordonin sijainnista linjan 110 kV Jasiniec viiltämiseen. Maailman pituus on noin 3,5 km ja poikkileikkaus 1000 mm² Cu (kaapelilinja) ja pituus noin 5,3 km + osa 240. Tehtävän 2 osalta hankkeen soveltamisalaan kuuluu nykyisten 110 kV:n kytkinlaitteiden rekonstruointi Fordon GPZ:ssä 1S SF6-tekniikalla (kytkimet) neljän lineaarisen kentän, 2 muuntajakentän 110/SN ja pitkittäiskytkentäkenttien mittauksessa. (Finnish)
    26 July 2022
    0 references
    Projekt naj bi se izvajal z dvema nalogama: 1) Izgradnja kabla in voznega voda 110 kV, 2) Obnova 110 kV stikalne plošče v Fordon GPZ, V primeru naloge 1 obseg projekta vključuje gradnjo dvotirnega kabla in nadzemne proge 110 kV od lokacije GPZ Fordon do zareze proge 110 kV Jasiniec â EUR Svet z dolžino približno 3,5 km in presekom 1 000 mm² Cu (kabelska linija) in dolžino približno 5,3 km + odsek 240. V primeru naloge 2 obseg projekta vključuje rekonstrukcijo obstoječih 110 kV stikalnih mehanizmov v Fordon GPZ do 1S v tehnologiji SF6 (stikala) pri merjenju 4 linearnih polj, 2 transformatorskih polj 110/SN in vzdolžnih priklopnih polj. (Slovenian)
    26 July 2022
    0 references
    Projekt má být realizován ve dvou úkolech: 1) Výstavba kabelového a trolejového vedení 110 kV, 2) Rekonstrukce rozvaděče 110 kV ve Fordonu GPZ, V případě úkolu 1 rozsah projektu zahrnuje výstavbu 2-kolejného kabelu a trolejového vedení 110 kV od umístění GPZ Fordon k řezu linky 110 kV Jasiniec › Svět o délce přibližně 3,5 km a průřezu 1 000 mm² Cu (kabelové vedení) a délka přibližně 5,3 km + úsek 240. V případě úkolu 2 zahrnuje rozsah projektu rekonstrukci stávajícího rozváděče 110 kV ve Fordon GPZ až 1S v technologii SF6 (přepínače) při měření 4 lineárních polí, 2 transformátorových polí 110/SN a podélných spojovacích polí. (Czech)
    26 July 2022
    0 references
    Projektas turi būti įgyvendinamas dviem uždaviniais: 1) Kabelių ir orinės linijos statyba 110 kV, 2) 110 kV skirstomojo skydo rekonstrukcija Fordon GPZ, 1 užduoties atveju projekto taikymo sritis apima dviejų bėgių kabelio ir oro linijos 110 kV statybą nuo GPZ Fordon vietos iki linijos 110 kV Jasiniec pjūvio pasaulyje, kurio ilgis yra maždaug 3,5 km, o skerspjūvis 1 000 mm² Cu (kabelinė linija) ir ilgis maždaug 5,3 km + 240 ruožas. 2 užduoties atveju projekto taikymo sritis apima esamų 110 kV skirstomųjų įrenginių rekonstrukciją Fordon GPZ į 1S SF6 technologijose (jungikliuose) 4 tiesinių laukų, 2 transformatorių laukų 110/SN ir išilginių sukabinimo laukų matavimuose. (Lithuanian)
    26 July 2022
    0 references
    Projekts tiks īstenots divos uzdevumos: 1) Kabeļu un gaisvadu līnijas 110 kV būvniecība, 2) 110 kV komutācijas skapja rekonstrukcija Fordon GPZ, 1. uzdevuma gadījumā projekta darbības joma ietver 2 sliežu kabeļu un gaisvadu līnijas būvniecību 110 kV no GPZ Fordon atrašanās vietas līdz līnijas iegriešanai 110 kV Jasiniec â EUR Pasaule ar garumu aptuveni 3,5 km un šķērsgriezumu 1 000 mm² Cu (kabeļu līnija) un garums aptuveni 5,3 km + 240. 2. uzdevuma gadījumā projekta darbības joma ietver esošo 110 kV komutācijas iekārtu rekonstrukciju Fordon GPZ uz 1S SF6 tehnoloģijā (slēdži), mērot 4 lineāros laukus, 2 transformatoru laukus 110/SN un gareniskās sakabes laukus. (Latvian)
    26 July 2022
    0 references
    Проектът ще се изпълнява в две задачи: 1) Изграждане на кабелна и въздушна линия 110 kV, 2) Реконструкция на разпределителното табло 110 kV в GPZ Fordon, В случай на задача 1 обхватът на проекта включва изграждането на двупистов кабел и надземна линия 110 kV от местоположението на GPZ Fordon до разреза на линията 110 kV Jasiniec â EUR Светът с дължина приблизително 3,5 km и напречно сечение 1 000 mm² Cu (кабелна линия) и дължина приблизително 5,3 km + участък от 240. В случай на Задача 2, обхватът на проекта включва реконструкция на съществуващата комутационна апаратура 110 kV в GPZ от Fordon до 1S по технологията SF6 (превключватели) при измерване на 4 линейни полета, 2 трансформаторни полета 110/SN и надлъжни съединителни полета. (Bulgarian)
    26 July 2022
    0 references
    A projektet két feladat keretében kell végrehajtani: 1) kábel és felsővezeték építése 110 kV, 2) A Fordon GPZ 110 kV-os kapcsolótáblájának újjáépítése, A Task 1 esetében a projekt kiterjed egy kétvágányú kábel és 110 kV felsővezeték építésére a GPZ Fordon helyétől az 110 kV-os Jasiniec vonal bemetszéséig A világ körülbelül 3,5 km hosszú és 1 000 mm² Cu (kábelvonal) és kb. 5,3 km + 240 szakasz. A 2. feladat esetében a projekt kiterjed a Fordon GPZ meglévő 110 kV-os kapcsolóberendezésének 1S-re történő átalakítására SF6 technológiában (kapcsolók) 4 lineáris mező, 2 transzformátormező 110/SN és hosszirányú kapcsolómezők mérésében. (Hungarian)
    26 July 2022
    0 references
    Tá an tionscadal le cur chun feidhme in dhá chúram: 1) Tógáil cábla agus líne lastuas 110 kV, 2) Atógáil an lasc-chláir 110 kV sa GPZ Fordon, I gcás Tasc 1 cuimsíonn raon feidhme an Tionscadail cábla 2-rian agus líne lastuas 110 kV a thógáil ó shuíomh an GPZ Fordon go dtí incision na líne 110 kV Jasiniec âEUR An domhan le fad de thart ar 3.5 km agus trasghearradh de 1 000 mm² Cu (líne cábla) agus fad thart ar 5.3 km + cuid de 240. I gcás Tasc 2, cuimsíonn raon feidhme an Tionscadail atógáil an lascthrealamh 110 kV atá ann cheana sa teicneolaíocht Fordon GPZ go 1S i dteicneolaíocht SF6 (lasca) i dtomhas 4 réimse líneach, 2 réimse claochladáin 110/SN agus réimsí cúplála fadaimseartha. (Irish)
    26 July 2022
    0 references
    Projektet ska genomföras i två uppgifter: 1) Konstruktion av kabel och kontaktledning 110 kV, 2) Ombyggnad av 110 kV växel i Fordon GPZ, I fallet med uppgift 1 omfattar projektets omfattning byggandet av en 2-spårig kabel och luftledning 110 kV från placeringen av GPZ Fordon till snittet av linjen 110 kV Jasiniec â EUR Världen med en längd på ca 3,5 km och ett tvärsnitt av 1 000 mm² Cu (kabellinje) och längd på cirka 5,3 km + sektion 240. När det gäller uppgift 2 omfattar projektets tillämpningsområde rekonstruktion av de befintliga 110 kV-kopplarna i Fordon GPZ till 1S i SF6-teknik (switchar) i mätningen av fyra linjära fält, 2 transformatorfält 110/SN och longitudinella kopplingsfält. (Swedish)
    26 July 2022
    0 references
    Projekt viiakse ellu kahes ülesandes: 1) Kaabel- ja õhuliini ehitus 110 kV, 2) 110 kV jaotuskilbi rekonstrueerimine Fordon GPZ-s, 1. ülesande puhul hõlmab projekti ulatus 2-rööpmelise kaabli ja 110 kV õhuliini ehitamist GPZ Fordoni asukohast kuni liini 110 kV Jasiniec sisselõikeni âEUR Maailm pikkusega umbes 3,5 km ja ristlõikega 1000 mm² Cu (kaabelliin) ja pikkus umbes 5,3 km + lõik 240. Ülesande 2 puhul hõlmab projekt Fordon GPZ-s olemasolevate 110 kV jaotusseadmete rekonstrueerimist SF6 tehnoloogias (lülitid) 1S-ni nelja lineaarse välja, kahe trafovälja 110/SN ja pikisuunalise haakevälja mõõtmisel. (Estonian)
    26 July 2022
    0 references

    Identifiers

    POIS.07.01.00-00-0025/16
    0 references