ECE INNOVATIVE PRODUCTION PROCESS (CIPPP) (Q2033693): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): THE PURPOSE OF THE PROJECT IS TO INTERCONNECT AND INTEGRATE THE NEW PRODUCTION SYSTEM, INTRODUCING LEAN MANUFACTURING, WITH THE AIM OF MAKING THE SYSTEMS A-FILIERA-AZIENDA CAPABLE OF PRODUCING NEW AND TECHNOLOGICALLY ADVANCED PRODUCTS IN A LIGHT, ON A CONTRACT BASIS, WITH SECURE/SMART HANDLING WITH PIUÂ’EVOLVED PRODUCTS, AN INNOVATIVE DESIGN SOFTWARE THAT IS INTERCONNECTED BETWEEN TECHNICAL UNITS AND PRODUCTION LINES, UP TO A NEW MARKETING MODEL...) |
||
Property / summary | |||
THE PURPOSE OF THE PROJECT IS TO INTERCONNECT AND INTEGRATE THE NEW PRODUCTION SYSTEM, INTRODUCING LEAN MANUFACTURING, WITH THE AIM OF MAKING THE SYSTEMS A-FILIERA-AZIENDA CAPABLE OF PRODUCING NEW AND TECHNOLOGICALLY ADVANCED PRODUCTS IN A LIGHT, ON A CONTRACT BASIS, WITH SECURE/SMART HANDLING WITH PIUÂ’EVOLVED PRODUCTS, AN INNOVATIVE DESIGN SOFTWARE THAT IS INTERCONNECTED BETWEEN TECHNICAL UNITS AND PRODUCTION LINES, UP TO A NEW MARKETING MODEL. (English) | |||
Property / summary: THE PURPOSE OF THE PROJECT IS TO INTERCONNECT AND INTEGRATE THE NEW PRODUCTION SYSTEM, INTRODUCING LEAN MANUFACTURING, WITH THE AIM OF MAKING THE SYSTEMS A-FILIERA-AZIENDA CAPABLE OF PRODUCING NEW AND TECHNOLOGICALLY ADVANCED PRODUCTS IN A LIGHT, ON A CONTRACT BASIS, WITH SECURE/SMART HANDLING WITH PIUÂ’EVOLVED PRODUCTS, AN INNOVATIVE DESIGN SOFTWARE THAT IS INTERCONNECTED BETWEEN TECHNICAL UNITS AND PRODUCTION LINES, UP TO A NEW MARKETING MODEL. (English) / rank | |||
Normal rank |
Revision as of 15:05, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ECE INNOVATIVE PRODUCTION PROCESS (CIPPP) |
Project in Italy financed by DG Regio |
Statements
24,716.35 Euro
0 references
49,432.7 Euro
0 references
50.0 percent
0 references
19 October 2017
0 references
31 March 2019
0 references
31 March 2019
0 references
COMEC SRL
0 references
Q281210 (Deleted Item)
0 references
LA RATIO DEL PROGETTO Ê DI INTERCONNETTERE ED INTEGRARE IL NUOVO SISTEMA PRODUTTIVO, INTRODUCENDO IL LEAN MANUFACTURING, PER RENDERE IL SISTEMA-FILIERA-AZIENDA IN GRADO DI PRODURRE IN MODO SNELLO, SU COMMESSA, CON PRODOTTI NUOVI E TECNOLOGICAMENTE AVANZATI, TRAMITE UNA MOVIMENTAZIONE SICURA/SMART E CON CARATTERISTICHE PIU¿ EVOLUTE, UN SW DI PROGETTAZIONE INNOVATIVO CHE SI INTERCONNETTA TRA REPARTI TECNICI E LINEE PRODUTTIVE, FINO AD UN NUOVO MODELLO DI COMMERCIALIZZAZIONE (Italian)
0 references
THE PURPOSE OF THE PROJECT IS TO INTERCONNECT AND INTEGRATE THE NEW PRODUCTION SYSTEM, INTRODUCING LEAN MANUFACTURING, WITH THE AIM OF MAKING THE SYSTEMS A-FILIERA-AZIENDA CAPABLE OF PRODUCING NEW AND TECHNOLOGICALLY ADVANCED PRODUCTS IN A LIGHT, ON A CONTRACT BASIS, WITH SECURE/SMART HANDLING WITH PIUÂ’EVOLVED PRODUCTS, AN INNOVATIVE DESIGN SOFTWARE THAT IS INTERCONNECTED BETWEEN TECHNICAL UNITS AND PRODUCTION LINES, UP TO A NEW MARKETING MODEL. (English)
0 references
Identifiers
D41B19000100007
0 references