(Created claim: summary (P836): INTERVENTION N.1: THERMAL INSULATION OF THE OUTER WALLS. OBJECTIVE? THAT OF REDUCING LOSSES BY BRINGING THE TRANSMITTANCE AT 0,212 W/M2K, AND THE SUMMER THERMAL LOSSES, BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.02 W/M2K. THE INTERVENTION PROVIDES FOR THE COMPLETION OF ALL THE BUILDING BLOCKS OF AN EIGHT-COAT THERMAL INSULATION SYSTEM CARRIED OUT VIA SINTERED POLYSTYRENE FOAM PANEL OF THICKNESSES OF M120 WITH PLASTER MADE OF WIRED GLASS FI...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Toscana - ERDF / rank | |||
Normal rank |
Revision as of 15:01, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000093) ENERGY EFFICIENCY IN AVERAGE “PAPINI” AVERAGE SCHOOL |
Project in Italy financed by DG Regio |
Statements
197,794.0 Euro
0 references
439,542.2 Euro
0 references
45.0 percent
0 references
3 April 2018
0 references
3 April 2020
0 references
16 November 2020
0 references
COMUNE DI CASTELNUOVO BERARDENGA
0 references
INTERVENTO N.1: ISOLAMENTO TERMICO DELLE PARETI ESTERNE. L?OBBIETTIVO ? QUELLO DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA A 0,212 W/M2K, E LE RIENTRATE TERMICHE ESTIVE PORTANDO LA TRASMITTANZA TERMICA PERIODICA A 0.02 W/M2K. L?INTERVENTO PREVEDE LA REALIZZAZIONE SU TUTTI I PROSPETTI DEL FABBRICATO DI UN SISTEMA DI ISOLAMENTO TERMICO A CAPPOTTO REALIZZATO TRAMITE PANNELLI DI POLISTIRENE ESPANSO SINTERIZZATO DI SPESSORE MM120 CON FINITURA AD INTONACO ARMATO CON RETE IN FIBRA DI VETRO. LAVORAZIONI ESSENZIALI: MONTAGGIO PONTEGGIO, POSA STRATO DI ISOLANTE, SMONTAGGIO PONTEGGIO.INTERVENTO N.2: SOSTITUZIONE DI SERRAMENTI E INFISSI - INSTALLAZIONE SISTEMA DI OMBREGGIATURA.L?OBBIETTIVO ? QUELLO DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA DELL?INFISSO UW A 1,6W/M2K.L?INTERVENTO PREVEDE LA SOSTITUZIONE DI TUTTI I SERRAMENTI CON INFISSI IN ALLUMINIO A TAGLIO TERMICO E VETRO CAMERA DOPPIO ANTIRUMORE 66.2A/15/44.2, CON TRASMITTANZA TERMICA DELL? INTERO INFISSO COMPRESO TELAIO UW 1,6 (Italian)
0 references
INTERVENTION N.1: THERMAL INSULATION OF THE OUTER WALLS. OBJECTIVE? THAT OF REDUCING LOSSES BY BRINGING THE TRANSMITTANCE AT 0,212 W/M2K, AND THE SUMMER THERMAL LOSSES, BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.02 W/M2K. THE INTERVENTION PROVIDES FOR THE COMPLETION OF ALL THE BUILDING BLOCKS OF AN EIGHT-COAT THERMAL INSULATION SYSTEM CARRIED OUT VIA SINTERED POLYSTYRENE FOAM PANEL OF THICKNESSES OF M120 WITH PLASTER MADE OF WIRED GLASS FIBRE. ESSENTIAL WORK: SCAFFOLDING, INSULATION LAYER, DISASSEMBLY/DISMANTLING, NO 2: WINDOW FRAMES AND WINDOWS — INSTALLATION OF OMBREGGATURA.L? OBJECTIVE? DOES IT PROVIDE FOR THE REPLACEMENT OF ALL WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES AND HEAT-CUT WINDOWS AND DOUBLE ANTI-NOISE CHAMBER GLASS 66.2A/15/44.2, WITH A THERMAL TRANSMITTANCE OF THERMAL TRANSMITTANCE, BY REDUCING THE LOSSES BY BRINGING THE TRANSMITTANCE OF THE FIXED UW TO 1,6W/M2K.L.? FIXED WHOLE CONTAINER, INCLUDING CHASSIS UW 1,6 (English)
0 references
Identifiers
D78G17000010005
0 references