Construction of a water supply network in Narty (Q132484): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
(‎Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,)
label / dalabel / da
 
Opførelse af et vandforsyningsnet i Narty
label / ellabel / el
 
Κατασκευή δικτύου ύδρευσης στο Narty
label / hrlabel / hr
 
Izgradnja vodoopskrbne mreže u Nartyju
label / rolabel / ro
 
Construirea unei rețele de alimentare cu apă în Narty
label / sklabel / sk
 
Výstavba vodovodnej siete v Narty
label / mtlabel / mt
 
Kostruzzjoni ta’ netwerk tal-provvista tal-ilma f’Narty
label / ptlabel / pt
 
Construção de uma rede de abastecimento de água em Narty
label / filabel / fi
 
Vesijohtoverkon rakentaminen Nartyyn
label / sllabel / sl
 
Izgradnja vodovodnega omrežja v Nartyju
label / cslabel / cs
 
Výstavba vodovodní sítě v Narty
label / ltlabel / lt
 
Vandentiekio tinklo statyba Nartyje
label / lvlabel / lv
 
Ūdensapgādes tīkla izbūve Nartijā
label / bglabel / bg
 
Изграждане на водоснабдителна мрежа в Нарти
label / hulabel / hu
 
Vízellátó hálózat építése Nartyban
label / galabel / ga
 
Tógáil líonra soláthair uisce i Narty
label / svlabel / sv
 
Byggandet av ett vattenförsörjningsnät i Narty
label / etlabel / et
 
Veevarustusvõrgu ehitamine Nartys
description / bgdescription / bg
 
Проект Q132484 в Полша
description / hrdescription / hr
 
Projekt Q132484 u Poljskoj
description / hudescription / hu
 
Projekt Q132484 Lengyelországban
description / csdescription / cs
 
Projekt Q132484 v Polsku
description / dadescription / da
 
Projekt Q132484 i Polen
description / nldescription / nl
 
Project Q132484 in Polen
description / etdescription / et
 
Projekt Q132484 Poolas
description / fidescription / fi
 
Projekti Q132484 Puolassa
description / frdescription / fr
 
Projet Q132484 en Pologne
description / dedescription / de
 
Projekt Q132484 in Polen
description / eldescription / el
 
Έργο Q132484 στην Πολωνία
description / gadescription / ga
 
Tionscadal Q132484 sa Pholainn
description / itdescription / it
 
Progetto Q132484 in Polonia
description / lvdescription / lv
 
Projekts Q132484 Polijā
description / ltdescription / lt
 
Projektas Q132484 Lenkijoje
description / mtdescription / mt
 
Proġett Q132484 fil-Polonja
description / ptdescription / pt
 
Projeto Q132484 na Polônia
description / rodescription / ro
 
Proiectul Q132484 în Polonia
description / skdescription / sk
 
Projekt Q132484 v Poľsku
description / sldescription / sl
 
Projekt Q132484 na Poljskem
description / esdescription / es
 
Proyecto Q132484 en Polonia
description / svdescription / sv
 
Projekt Q132484 i Polen
Property / summary
 
Det er designet til at bygge et 8,59 km langt vandforsyningsnet til byen Narty: Område nr.: 23/2, WarchaÅa-regionen, område nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skiområde, område nr.: 104/18, 105, Burdig. Det planlagte vandforsyningssystem vil blive drevet af vandforsyning beliggende i WarchaÅy. Sektionerne er designet i vandværker WarchaÅy i området af plot nr. 23/2 WarchaÅa, gm. Jedwabno. Landsbyen Narty ligger i byområdet, som scannes. På nuværende tidspunkt har Nart beboere bygget et kloaknet, og de trækker vand fra dybvandsbrønde. Opførelsen af dybe brønde af beboere, sommermænd, pensionater og hoteller i landsbyen Narty får søen Swiejno til at tørre op. Gennemførelsen af projektet vil reducere brugen af dybvandsbrønde og bidrage til at forbedre vandforbindelserne i Åwijnosøen. 80 personer vil blive tilsluttet det nybyggede vandforsyningsnet. Projektet passer ind i antagelserne i SzOOP RPO WiM 2014-2020 â EUR et specifikt mål â EUR mere spildevandsrensning og bedre vandkvalitet gennem opførelse af et nyt vandforsyningsnet for beboere, turister, resorts og hoteller i Narty. Ansøger âEUR kommune Jedwabno. For at gennemføre projektet blev der oprettet en projektgennemførelsesenhed (forordning nr. 22/19 af 15.3.2019. (Danish)
Property / summary: Det er designet til at bygge et 8,59 km langt vandforsyningsnet til byen Narty: Område nr.: 23/2, WarchaÅa-regionen, område nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skiområde, område nr.: 104/18, 105, Burdig. Det planlagte vandforsyningssystem vil blive drevet af vandforsyning beliggende i WarchaÅy. Sektionerne er designet i vandværker WarchaÅy i området af plot nr. 23/2 WarchaÅa, gm. Jedwabno. Landsbyen Narty ligger i byområdet, som scannes. På nuværende tidspunkt har Nart beboere bygget et kloaknet, og de trækker vand fra dybvandsbrønde. Opførelsen af dybe brønde af beboere, sommermænd, pensionater og hoteller i landsbyen Narty får søen Swiejno til at tørre op. Gennemførelsen af projektet vil reducere brugen af dybvandsbrønde og bidrage til at forbedre vandforbindelserne i Åwijnosøen. 80 personer vil blive tilsluttet det nybyggede vandforsyningsnet. Projektet passer ind i antagelserne i SzOOP RPO WiM 2014-2020 â EUR et specifikt mål â EUR mere spildevandsrensning og bedre vandkvalitet gennem opførelse af et nyt vandforsyningsnet for beboere, turister, resorts og hoteller i Narty. Ansøger âEUR kommune Jedwabno. For at gennemføre projektet blev der oprettet en projektgennemførelsesenhed (forordning nr. 22/19 af 15.3.2019. (Danish) / rank
 
Normal rank
Property / summary: Det er designet til at bygge et 8,59 km langt vandforsyningsnet til byen Narty: Område nr.: 23/2, WarchaÅa-regionen, område nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skiområde, område nr.: 104/18, 105, Burdig. Det planlagte vandforsyningssystem vil blive drevet af vandforsyning beliggende i WarchaÅy. Sektionerne er designet i vandværker WarchaÅy i området af plot nr. 23/2 WarchaÅa, gm. Jedwabno. Landsbyen Narty ligger i byområdet, som scannes. På nuværende tidspunkt har Nart beboere bygget et kloaknet, og de trækker vand fra dybvandsbrønde. Opførelsen af dybe brønde af beboere, sommermænd, pensionater og hoteller i landsbyen Narty får søen Swiejno til at tørre op. Gennemførelsen af projektet vil reducere brugen af dybvandsbrønde og bidrage til at forbedre vandforbindelserne i Åwijnosøen. 80 personer vil blive tilsluttet det nybyggede vandforsyningsnet. Projektet passer ind i antagelserne i SzOOP RPO WiM 2014-2020 â EUR et specifikt mål â EUR mere spildevandsrensning og bedre vandkvalitet gennem opførelse af et nyt vandforsyningsnet for beboere, turister, resorts og hoteller i Narty. Ansøger âEUR kommune Jedwabno. For at gennemføre projektet blev der oprettet en projektgennemførelsesenhed (forordning nr. 22/19 af 15.3.2019. (Danish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Έχει σχεδιαστεί για την κατασκευή ενός δικτύου ύδρευσης μήκους 8,59 km για την πόλη Narty: Οικόπεδα αριθ.: 23/2, περιοχή WarchaÅa, οικόπεδα αριθ.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, χιονοδρομική περιοχή, οικόπεδα αρ.: 104/18, 105, Burdig. Το προγραμματισμένο σύστημα παροχής νερού θα τροφοδοτείται από την παροχή νερού που βρίσκεται στο WarchaÅy. Τα â EURsectionsâ EUR έχουν σχεδιαστεί στα έργα ύδρευσης του WarchaÅy στην περιοχή του οικοπέδου αρ. 23/2 WarchaÅa, gm. Jedwabno. Το χωριό Narty βρίσκεται στον οικισμό, ο οποίος σαρώνεται. Επί του παρόντος, οι κάτοικοι Nart έχουν κατασκευάσει ένα δίκτυο αποχέτευσης, και αντλούν νερό από πηγάδια βαθέων υδάτων. Η κατασκευή βαθέων πηγαδιών από κατοίκους, καλοκαιρινούς άνδρες, ξενώνες και ξενοδοχεία στο χωριό Narty προκαλεί την ξήρανση της λίμνης Swiejno. Η υλοποίηση του έργου θα μειώσει τη χρήση φρεάτων βαθέων υδάτων και θα συμβάλει στη βελτίωση των σχέσεων στον τομέα των υδάτων στη λίμνη Åwijno. 80 άτομα θα συνδεθούν με το νεόδμητο δίκτυο ύδρευσης. Το έργο ταιριάζει με τις παραδοχές που ορίζονται στο SzOOP RPO WiM 2014-2020 â EUR ένα ειδικό στόχο â EUR περισσότερη επεξεργασία λυμάτων και καλύτερη ποιότητα του νερού μέσω της κατασκευής ενός νέου δικτύου ύδρευσης για τους κατοίκους, τουρίστες, θέρετρα και ξενοδοχεία στο Narty. Αιτών â EUR Δήμος του Jedwabno. Για την υλοποίηση του έργου δημιουργήθηκε μονάδα υλοποίησης έργου (Κανονισμός αριθ. 22/19 της 15.3.2019. (Greek)
Property / summary: Έχει σχεδιαστεί για την κατασκευή ενός δικτύου ύδρευσης μήκους 8,59 km για την πόλη Narty: Οικόπεδα αριθ.: 23/2, περιοχή WarchaÅa, οικόπεδα αριθ.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, χιονοδρομική περιοχή, οικόπεδα αρ.: 104/18, 105, Burdig. Το προγραμματισμένο σύστημα παροχής νερού θα τροφοδοτείται από την παροχή νερού που βρίσκεται στο WarchaÅy. Τα â EURsectionsâ EUR έχουν σχεδιαστεί στα έργα ύδρευσης του WarchaÅy στην περιοχή του οικοπέδου αρ. 23/2 WarchaÅa, gm. Jedwabno. Το χωριό Narty βρίσκεται στον οικισμό, ο οποίος σαρώνεται. Επί του παρόντος, οι κάτοικοι Nart έχουν κατασκευάσει ένα δίκτυο αποχέτευσης, και αντλούν νερό από πηγάδια βαθέων υδάτων. Η κατασκευή βαθέων πηγαδιών από κατοίκους, καλοκαιρινούς άνδρες, ξενώνες και ξενοδοχεία στο χωριό Narty προκαλεί την ξήρανση της λίμνης Swiejno. Η υλοποίηση του έργου θα μειώσει τη χρήση φρεάτων βαθέων υδάτων και θα συμβάλει στη βελτίωση των σχέσεων στον τομέα των υδάτων στη λίμνη Åwijno. 80 άτομα θα συνδεθούν με το νεόδμητο δίκτυο ύδρευσης. Το έργο ταιριάζει με τις παραδοχές που ορίζονται στο SzOOP RPO WiM 2014-2020 â EUR ένα ειδικό στόχο â EUR περισσότερη επεξεργασία λυμάτων και καλύτερη ποιότητα του νερού μέσω της κατασκευής ενός νέου δικτύου ύδρευσης για τους κατοίκους, τουρίστες, θέρετρα και ξενοδοχεία στο Narty. Αιτών â EUR Δήμος του Jedwabno. Για την υλοποίηση του έργου δημιουργήθηκε μονάδα υλοποίησης έργου (Κανονισμός αριθ. 22/19 της 15.3.2019. (Greek) / rank
 
Normal rank
Property / summary: Έχει σχεδιαστεί για την κατασκευή ενός δικτύου ύδρευσης μήκους 8,59 km για την πόλη Narty: Οικόπεδα αριθ.: 23/2, περιοχή WarchaÅa, οικόπεδα αριθ.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, χιονοδρομική περιοχή, οικόπεδα αρ.: 104/18, 105, Burdig. Το προγραμματισμένο σύστημα παροχής νερού θα τροφοδοτείται από την παροχή νερού που βρίσκεται στο WarchaÅy. Τα â EURsectionsâ EUR έχουν σχεδιαστεί στα έργα ύδρευσης του WarchaÅy στην περιοχή του οικοπέδου αρ. 23/2 WarchaÅa, gm. Jedwabno. Το χωριό Narty βρίσκεται στον οικισμό, ο οποίος σαρώνεται. Επί του παρόντος, οι κάτοικοι Nart έχουν κατασκευάσει ένα δίκτυο αποχέτευσης, και αντλούν νερό από πηγάδια βαθέων υδάτων. Η κατασκευή βαθέων πηγαδιών από κατοίκους, καλοκαιρινούς άνδρες, ξενώνες και ξενοδοχεία στο χωριό Narty προκαλεί την ξήρανση της λίμνης Swiejno. Η υλοποίηση του έργου θα μειώσει τη χρήση φρεάτων βαθέων υδάτων και θα συμβάλει στη βελτίωση των σχέσεων στον τομέα των υδάτων στη λίμνη Åwijno. 80 άτομα θα συνδεθούν με το νεόδμητο δίκτυο ύδρευσης. Το έργο ταιριάζει με τις παραδοχές που ορίζονται στο SzOOP RPO WiM 2014-2020 â EUR ένα ειδικό στόχο â EUR περισσότερη επεξεργασία λυμάτων και καλύτερη ποιότητα του νερού μέσω της κατασκευής ενός νέου δικτύου ύδρευσης για τους κατοίκους, τουρίστες, θέρετρα και ξενοδοχεία στο Narty. Αιτών â EUR Δήμος του Jedwabno. Για την υλοποίηση του έργου δημιουργήθηκε μονάδα υλοποίησης έργου (Κανονισμός αριθ. 22/19 της 15.3.2019. (Greek) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Dizajniran je za izgradnju 8,59 km duge vodovodne mreže za grad Narty: Zemljište br.: 23/2, regija WarchaÅa, br. parcela: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skijalište, parcele br.: 104/18, 105, Burdig. Planirani vodoopskrbni sustav bit će napajan vodom koja se nalazi u WarchaÅyu. âEURsectionsâEUR su dizajnirani u vodovodima WarchaÅy u području parcele br. 23/2 WarchaÅa, gm. Jedwabno. Selo Narty nalazi se u aglomeraciji, koja je skenirana. Trenutno su stanovnici Narta izgradili kanalizacijsku mrežu i crpe vodu iz dubokih bunara. Izgradnja dubokih bunara od strane stanovnika, ljetnikovaca, pansiona i hotela u selu Narty uzrokuje da se jezero Swiejno osuši. Provedbom projekta smanjit će se upotreba dubokovodnih bušotina i doprinijeti poboljšanju vodnih odnosa u jezeru Åwijno. Na novoizgrađenu vodoopskrbnu mrežu bit će priključeno 80 osoba. Projekt se uklapa u pretpostavke navedene u SzOOP RPO WiM 2014 – 2020 â EUR poseban cilj â EUR više pročišćavanje otpadnih voda i bolju kvalitetu vode kroz izgradnju nove vodoopskrbne mreže za stanovnike, turiste, odmarališta i hotele u Narty. Tužitelj Općina Jedwabno. Za provedbu projekta osnovana je provedbena jedinica (Uredba br. 22/19 od 15.3.2019.). (Croatian)
Property / summary: Dizajniran je za izgradnju 8,59 km duge vodovodne mreže za grad Narty: Zemljište br.: 23/2, regija WarchaÅa, br. parcela: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skijalište, parcele br.: 104/18, 105, Burdig. Planirani vodoopskrbni sustav bit će napajan vodom koja se nalazi u WarchaÅyu. âEURsectionsâEUR su dizajnirani u vodovodima WarchaÅy u području parcele br. 23/2 WarchaÅa, gm. Jedwabno. Selo Narty nalazi se u aglomeraciji, koja je skenirana. Trenutno su stanovnici Narta izgradili kanalizacijsku mrežu i crpe vodu iz dubokih bunara. Izgradnja dubokih bunara od strane stanovnika, ljetnikovaca, pansiona i hotela u selu Narty uzrokuje da se jezero Swiejno osuši. Provedbom projekta smanjit će se upotreba dubokovodnih bušotina i doprinijeti poboljšanju vodnih odnosa u jezeru Åwijno. Na novoizgrađenu vodoopskrbnu mrežu bit će priključeno 80 osoba. Projekt se uklapa u pretpostavke navedene u SzOOP RPO WiM 2014 – 2020 â EUR poseban cilj â EUR više pročišćavanje otpadnih voda i bolju kvalitetu vode kroz izgradnju nove vodoopskrbne mreže za stanovnike, turiste, odmarališta i hotele u Narty. Tužitelj Općina Jedwabno. Za provedbu projekta osnovana je provedbena jedinica (Uredba br. 22/19 od 15.3.2019.). (Croatian) / rank
 
Normal rank
Property / summary: Dizajniran je za izgradnju 8,59 km duge vodovodne mreže za grad Narty: Zemljište br.: 23/2, regija WarchaÅa, br. parcela: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skijalište, parcele br.: 104/18, 105, Burdig. Planirani vodoopskrbni sustav bit će napajan vodom koja se nalazi u WarchaÅyu. âEURsectionsâEUR su dizajnirani u vodovodima WarchaÅy u području parcele br. 23/2 WarchaÅa, gm. Jedwabno. Selo Narty nalazi se u aglomeraciji, koja je skenirana. Trenutno su stanovnici Narta izgradili kanalizacijsku mrežu i crpe vodu iz dubokih bunara. Izgradnja dubokih bunara od strane stanovnika, ljetnikovaca, pansiona i hotela u selu Narty uzrokuje da se jezero Swiejno osuši. Provedbom projekta smanjit će se upotreba dubokovodnih bušotina i doprinijeti poboljšanju vodnih odnosa u jezeru Åwijno. Na novoizgrađenu vodoopskrbnu mrežu bit će priključeno 80 osoba. Projekt se uklapa u pretpostavke navedene u SzOOP RPO WiM 2014 – 2020 â EUR poseban cilj â EUR više pročišćavanje otpadnih voda i bolju kvalitetu vode kroz izgradnju nove vodoopskrbne mreže za stanovnike, turiste, odmarališta i hotele u Narty. Tužitelj Općina Jedwabno. Za provedbu projekta osnovana je provedbena jedinica (Uredba br. 22/19 od 15.3.2019.). (Croatian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Acesta este conceput pentru a construi o rețea de alimentare cu apă cu o lungime de 8,59 km pentru orașul Narty: Parcelele nr.: 23/2, regiunea WarchaÅa, parcele nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, zonă de schi, parcele nr.: 104/18, 105, Burdig. Sistemul planificat de alimentare cu apă va fi alimentat de alimentare cu apă situat în WarchaÅy. Secțiunile sunt proiectate în uzinele de apă din WarchaÅy în zona de teren nr. 23/2 WarchaÅa, gm. Jedwabno. Satul Narty este situat în aglomerarea care este scanată. În prezent, locuitorii Nart au construit o rețea de canalizare, și ei extrag apă din puțurile de adâncime. Construcția de puțuri adânci de către rezidenți, oameni de vară, case de oaspeți și hoteluri din satul Narty face ca lacul Swiejno să se usuce. Punerea în aplicare a proiectului va reduce utilizarea puțurilor de adâncime și va contribui la îmbunătățirea relațiilor cu apa din lacul Åwijno. 80 de persoane vor fi conectate la rețeaua de alimentare cu apă nou construită. Proiectul se încadrează în ipotezele stabilite în SzOOP RPO WiM 2014-2020 â EUR un obiectiv specific â EUR mai multe epurare a apelor uzate și o mai bună calitate a apei prin construirea unei noi rețele de alimentare cu apă pentru rezidenți, turiști, stațiuni și hoteluri în Narty. Reclamantă municipalitatea Jedwabno. Pentru implementarea proiectului a fost înființată o unitate de implementare a proiectului (Regulamentul nr. 22/19 din 15.03.2019. (Romanian)
Property / summary: Acesta este conceput pentru a construi o rețea de alimentare cu apă cu o lungime de 8,59 km pentru orașul Narty: Parcelele nr.: 23/2, regiunea WarchaÅa, parcele nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, zonă de schi, parcele nr.: 104/18, 105, Burdig. Sistemul planificat de alimentare cu apă va fi alimentat de alimentare cu apă situat în WarchaÅy. Secțiunile sunt proiectate în uzinele de apă din WarchaÅy în zona de teren nr. 23/2 WarchaÅa, gm. Jedwabno. Satul Narty este situat în aglomerarea care este scanată. În prezent, locuitorii Nart au construit o rețea de canalizare, și ei extrag apă din puțurile de adâncime. Construcția de puțuri adânci de către rezidenți, oameni de vară, case de oaspeți și hoteluri din satul Narty face ca lacul Swiejno să se usuce. Punerea în aplicare a proiectului va reduce utilizarea puțurilor de adâncime și va contribui la îmbunătățirea relațiilor cu apa din lacul Åwijno. 80 de persoane vor fi conectate la rețeaua de alimentare cu apă nou construită. Proiectul se încadrează în ipotezele stabilite în SzOOP RPO WiM 2014-2020 â EUR un obiectiv specific â EUR mai multe epurare a apelor uzate și o mai bună calitate a apei prin construirea unei noi rețele de alimentare cu apă pentru rezidenți, turiști, stațiuni și hoteluri în Narty. Reclamantă municipalitatea Jedwabno. Pentru implementarea proiectului a fost înființată o unitate de implementare a proiectului (Regulamentul nr. 22/19 din 15.03.2019. (Romanian) / rank
 
Normal rank
Property / summary: Acesta este conceput pentru a construi o rețea de alimentare cu apă cu o lungime de 8,59 km pentru orașul Narty: Parcelele nr.: 23/2, regiunea WarchaÅa, parcele nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, zonă de schi, parcele nr.: 104/18, 105, Burdig. Sistemul planificat de alimentare cu apă va fi alimentat de alimentare cu apă situat în WarchaÅy. Secțiunile sunt proiectate în uzinele de apă din WarchaÅy în zona de teren nr. 23/2 WarchaÅa, gm. Jedwabno. Satul Narty este situat în aglomerarea care este scanată. În prezent, locuitorii Nart au construit o rețea de canalizare, și ei extrag apă din puțurile de adâncime. Construcția de puțuri adânci de către rezidenți, oameni de vară, case de oaspeți și hoteluri din satul Narty face ca lacul Swiejno să se usuce. Punerea în aplicare a proiectului va reduce utilizarea puțurilor de adâncime și va contribui la îmbunătățirea relațiilor cu apa din lacul Åwijno. 80 de persoane vor fi conectate la rețeaua de alimentare cu apă nou construită. Proiectul se încadrează în ipotezele stabilite în SzOOP RPO WiM 2014-2020 â EUR un obiectiv specific â EUR mai multe epurare a apelor uzate și o mai bună calitate a apei prin construirea unei noi rețele de alimentare cu apă pentru rezidenți, turiști, stațiuni și hoteluri în Narty. Reclamantă municipalitatea Jedwabno. Pentru implementarea proiectului a fost înființată o unitate de implementare a proiectului (Regulamentul nr. 22/19 din 15.03.2019. (Romanian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Je určený na vybudovanie 8,59 km dlhej vodovodnej siete pre mesto Narty: Pozemky č.: 23/2, oblasť WarchaÅa, pozemky č.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, lyžiarsky areál, parcely č.: 104/18, 105, Burdig. Plánovaný systém zásobovania vodou bude napájaný prívodom vody nachádzajúcim sa v WarchaÅy. Oddiely EUR sú navrhnuté vo vodárni WarchaÅy v oblasti pozemku č. 23/2 WarchaÅa, gm. Jedwabno. Obec Narty sa nachádza v aglomerácii, ktorá je skenovaná. V súčasnosti obyvatelia Nart vybudovali kanalizačnú sieť a čerpajú vodu z hlbinných studní. Výstavba hlbokých studní obyvateľov, letákov, penziónov a hotelov v obci Narty spôsobuje vyschnutie jazera Swiejno. Realizácia projektu zníži využívanie hlbinných studní a prispeje k zlepšeniu vzťahov s vodou v Åwijnskom jazere. K novo vybudovanej vodovodnej sieti bude pripojených 80 osôb. Projekt zapadá do predpokladov stanovených v SzOOP RPO WiM 2014 – 2020 â EUR špecifický cieľ â EUR viac čistenie odpadových vôd a lepšiu kvalitu vody prostredníctvom výstavby novej vodovodnej siete pre obyvateľov, turistov, strediská a hotely v Narty. Žalobkyňa â EUR Obec Jedwabno. Na realizáciu projektu bola zriadená jednotka realizácie projektu (nariadenie č. 22/19 z 15. 3. 2019. (Slovak)
Property / summary: Je určený na vybudovanie 8,59 km dlhej vodovodnej siete pre mesto Narty: Pozemky č.: 23/2, oblasť WarchaÅa, pozemky č.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, lyžiarsky areál, parcely č.: 104/18, 105, Burdig. Plánovaný systém zásobovania vodou bude napájaný prívodom vody nachádzajúcim sa v WarchaÅy. Oddiely EUR sú navrhnuté vo vodárni WarchaÅy v oblasti pozemku č. 23/2 WarchaÅa, gm. Jedwabno. Obec Narty sa nachádza v aglomerácii, ktorá je skenovaná. V súčasnosti obyvatelia Nart vybudovali kanalizačnú sieť a čerpajú vodu z hlbinných studní. Výstavba hlbokých studní obyvateľov, letákov, penziónov a hotelov v obci Narty spôsobuje vyschnutie jazera Swiejno. Realizácia projektu zníži využívanie hlbinných studní a prispeje k zlepšeniu vzťahov s vodou v Åwijnskom jazere. K novo vybudovanej vodovodnej sieti bude pripojených 80 osôb. Projekt zapadá do predpokladov stanovených v SzOOP RPO WiM 2014 – 2020 â EUR špecifický cieľ â EUR viac čistenie odpadových vôd a lepšiu kvalitu vody prostredníctvom výstavby novej vodovodnej siete pre obyvateľov, turistov, strediská a hotely v Narty. Žalobkyňa â EUR Obec Jedwabno. Na realizáciu projektu bola zriadená jednotka realizácie projektu (nariadenie č. 22/19 z 15. 3. 2019. (Slovak) / rank
 
Normal rank
Property / summary: Je určený na vybudovanie 8,59 km dlhej vodovodnej siete pre mesto Narty: Pozemky č.: 23/2, oblasť WarchaÅa, pozemky č.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, lyžiarsky areál, parcely č.: 104/18, 105, Burdig. Plánovaný systém zásobovania vodou bude napájaný prívodom vody nachádzajúcim sa v WarchaÅy. Oddiely EUR sú navrhnuté vo vodárni WarchaÅy v oblasti pozemku č. 23/2 WarchaÅa, gm. Jedwabno. Obec Narty sa nachádza v aglomerácii, ktorá je skenovaná. V súčasnosti obyvatelia Nart vybudovali kanalizačnú sieť a čerpajú vodu z hlbinných studní. Výstavba hlbokých studní obyvateľov, letákov, penziónov a hotelov v obci Narty spôsobuje vyschnutie jazera Swiejno. Realizácia projektu zníži využívanie hlbinných studní a prispeje k zlepšeniu vzťahov s vodou v Åwijnskom jazere. K novo vybudovanej vodovodnej sieti bude pripojených 80 osôb. Projekt zapadá do predpokladov stanovených v SzOOP RPO WiM 2014 – 2020 â EUR špecifický cieľ â EUR viac čistenie odpadových vôd a lepšiu kvalitu vody prostredníctvom výstavby novej vodovodnej siete pre obyvateľov, turistov, strediská a hotely v Narty. Žalobkyňa â EUR Obec Jedwabno. Na realizáciu projektu bola zriadená jednotka realizácie projektu (nariadenie č. 22/19 z 15. 3. 2019. (Slovak) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Huwa mfassal biex jibni netwerk tal-provvista tal-ilma twil 8.59 km għall-belt ta’ Narty: Il-plottijiet nru.: 23/2, ir-reġjun ta’ WarchaÅa, il-plottijiet nru.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, iż-żona tal-iskijjar, il-plottijiet nru.: 104/18, 105, Burdig. Is-sistema ppjanata tal-provvista tal-ilma se tkun imħaddma bil-provvista tal-ilma li tinsab fi WarchaÅy. Il-EUR â EUR œEURsectionsâ huma mfassla fil-waterworks tal WarchaÅy fil-qasam tal-plott nru 23/2 WarchaÅa, gm. Jedwabno. Il-villaġġ ta’ Narty jinsab fl-agglomerazzjoni, li hija skennjata. Fil-preżent, ir-residenti ta’ Nart bnew netwerk tad-drenaġġ, u jiġbdu l-ilma minn bjar tal-baħar fond. Il-kostruzzjoni ta ‘bjar fil-fond minn residenti, summermen, guesthouses u lukandi fir-raħal ta’ Narty tikkawża l-Lag Swiejno jinxef. L-implimentazzjoni tal-proġett ser tnaqqas l-użu tal-bjar tal-baħar fond u tikkontribwixxi għat-titjib tar-relazzjonijiet tal-ilma fil-Lag Åwijno. 80 persuna se jkunu konnessi man-netwerk tal-provvista tal-ilma mibni ġdid. Il-proġett jidħol fis-suppożizzjonijiet stabbiliti fil-SzOOP RPO WiM 2014–2020 â EUR â EUR objettiv speċifiku trattament tad-drenaġġ aktar u kwalità aħjar ta ‘ilma permezz tal-kostruzzjoni ta’ netwerk ġdid provvista ta ‘ilma għar-residenti, turisti, resorts u lukandi fil Narty. Applikant â EUR TM Muniċipalità ta ‘Jedwabno. Sabiex jiġi implimentat il-proġett, ġiet stabbilita unità għall-implimentazzjoni tal-proġett (ir-Regolament Nru 22/19 tal-15.03.2019. (Maltese)
Property / summary: Huwa mfassal biex jibni netwerk tal-provvista tal-ilma twil 8.59 km għall-belt ta’ Narty: Il-plottijiet nru.: 23/2, ir-reġjun ta’ WarchaÅa, il-plottijiet nru.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, iż-żona tal-iskijjar, il-plottijiet nru.: 104/18, 105, Burdig. Is-sistema ppjanata tal-provvista tal-ilma se tkun imħaddma bil-provvista tal-ilma li tinsab fi WarchaÅy. Il-EUR â EUR œEURsectionsâ huma mfassla fil-waterworks tal WarchaÅy fil-qasam tal-plott nru 23/2 WarchaÅa, gm. Jedwabno. Il-villaġġ ta’ Narty jinsab fl-agglomerazzjoni, li hija skennjata. Fil-preżent, ir-residenti ta’ Nart bnew netwerk tad-drenaġġ, u jiġbdu l-ilma minn bjar tal-baħar fond. Il-kostruzzjoni ta ‘bjar fil-fond minn residenti, summermen, guesthouses u lukandi fir-raħal ta’ Narty tikkawża l-Lag Swiejno jinxef. L-implimentazzjoni tal-proġett ser tnaqqas l-użu tal-bjar tal-baħar fond u tikkontribwixxi għat-titjib tar-relazzjonijiet tal-ilma fil-Lag Åwijno. 80 persuna se jkunu konnessi man-netwerk tal-provvista tal-ilma mibni ġdid. Il-proġett jidħol fis-suppożizzjonijiet stabbiliti fil-SzOOP RPO WiM 2014–2020 â EUR â EUR objettiv speċifiku trattament tad-drenaġġ aktar u kwalità aħjar ta ‘ilma permezz tal-kostruzzjoni ta’ netwerk ġdid provvista ta ‘ilma għar-residenti, turisti, resorts u lukandi fil Narty. Applikant â EUR TM Muniċipalità ta ‘Jedwabno. Sabiex jiġi implimentat il-proġett, ġiet stabbilita unità għall-implimentazzjoni tal-proġett (ir-Regolament Nru 22/19 tal-15.03.2019. (Maltese) / rank
 
Normal rank
Property / summary: Huwa mfassal biex jibni netwerk tal-provvista tal-ilma twil 8.59 km għall-belt ta’ Narty: Il-plottijiet nru.: 23/2, ir-reġjun ta’ WarchaÅa, il-plottijiet nru.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, iż-żona tal-iskijjar, il-plottijiet nru.: 104/18, 105, Burdig. Is-sistema ppjanata tal-provvista tal-ilma se tkun imħaddma bil-provvista tal-ilma li tinsab fi WarchaÅy. Il-EUR â EUR œEURsectionsâ huma mfassla fil-waterworks tal WarchaÅy fil-qasam tal-plott nru 23/2 WarchaÅa, gm. Jedwabno. Il-villaġġ ta’ Narty jinsab fl-agglomerazzjoni, li hija skennjata. Fil-preżent, ir-residenti ta’ Nart bnew netwerk tad-drenaġġ, u jiġbdu l-ilma minn bjar tal-baħar fond. Il-kostruzzjoni ta ‘bjar fil-fond minn residenti, summermen, guesthouses u lukandi fir-raħal ta’ Narty tikkawża l-Lag Swiejno jinxef. L-implimentazzjoni tal-proġett ser tnaqqas l-użu tal-bjar tal-baħar fond u tikkontribwixxi għat-titjib tar-relazzjonijiet tal-ilma fil-Lag Åwijno. 80 persuna se jkunu konnessi man-netwerk tal-provvista tal-ilma mibni ġdid. Il-proġett jidħol fis-suppożizzjonijiet stabbiliti fil-SzOOP RPO WiM 2014–2020 â EUR â EUR objettiv speċifiku trattament tad-drenaġġ aktar u kwalità aħjar ta ‘ilma permezz tal-kostruzzjoni ta’ netwerk ġdid provvista ta ‘ilma għar-residenti, turisti, resorts u lukandi fil Narty. Applikant â EUR TM Muniċipalità ta ‘Jedwabno. Sabiex jiġi implimentat il-proġett, ġiet stabbilita unità għall-implimentazzjoni tal-proġett (ir-Regolament Nru 22/19 tal-15.03.2019. (Maltese) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Ele foi projetado para construir uma rede de abastecimento de água de 8,59 km de comprimento para a cidade de Narty: N.º das parcelas: 23/2, região de WarchaÅa, parcelas n.º: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, área de esqui, parcelas n.º: 104/18, 105, Burdig. O sistema de abastecimento de água planejado será alimentado por abastecimento de água localizado em WarchaÅy. As seções são projetadas nas usinas de água de WarchaÅy na área do terreno n.º 23/2 WarchaÅa, gm. Jedwabno. A aldeia de Narty está localizada na aglomeração, que é escaneada. Atualmente, os moradores de Nart construíram uma rede de esgotos e tiram água de poços de águas profundas. A construção de poços profundos por residentes, Summermen, pousadas e hotéis na aldeia de Narty faz com que o lago Swiejno seque. A execução do projeto reduzirá a utilização de poços de profundidade e contribuirá para melhorar as relações com a água no lago de Åwijno. 80 pessoas serão conectadas à rede de abastecimento de água recém-construída. O projeto enquadra-se nos pressupostos estabelecidos no SzOOP RPO WiM 2014-2020 âEUR um objetivo específico âEUR mais tratamento de esgotos e melhor qualidade da água através da construção de uma nova rede de abastecimento de água para residentes, turistas, resorts e hotéis em Narty. Candidato âEUR Município de Jedwabno. Para a execução do projeto, foi criada uma unidade de execução do projeto (Regulamento n.º 22/19 de 15.3.2019. (Portuguese)
Property / summary: Ele foi projetado para construir uma rede de abastecimento de água de 8,59 km de comprimento para a cidade de Narty: N.º das parcelas: 23/2, região de WarchaÅa, parcelas n.º: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, área de esqui, parcelas n.º: 104/18, 105, Burdig. O sistema de abastecimento de água planejado será alimentado por abastecimento de água localizado em WarchaÅy. As seções são projetadas nas usinas de água de WarchaÅy na área do terreno n.º 23/2 WarchaÅa, gm. Jedwabno. A aldeia de Narty está localizada na aglomeração, que é escaneada. Atualmente, os moradores de Nart construíram uma rede de esgotos e tiram água de poços de águas profundas. A construção de poços profundos por residentes, Summermen, pousadas e hotéis na aldeia de Narty faz com que o lago Swiejno seque. A execução do projeto reduzirá a utilização de poços de profundidade e contribuirá para melhorar as relações com a água no lago de Åwijno. 80 pessoas serão conectadas à rede de abastecimento de água recém-construída. O projeto enquadra-se nos pressupostos estabelecidos no SzOOP RPO WiM 2014-2020 âEUR um objetivo específico âEUR mais tratamento de esgotos e melhor qualidade da água através da construção de uma nova rede de abastecimento de água para residentes, turistas, resorts e hotéis em Narty. Candidato âEUR Município de Jedwabno. Para a execução do projeto, foi criada uma unidade de execução do projeto (Regulamento n.º 22/19 de 15.3.2019. (Portuguese) / rank
 
Normal rank
Property / summary: Ele foi projetado para construir uma rede de abastecimento de água de 8,59 km de comprimento para a cidade de Narty: N.º das parcelas: 23/2, região de WarchaÅa, parcelas n.º: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, área de esqui, parcelas n.º: 104/18, 105, Burdig. O sistema de abastecimento de água planejado será alimentado por abastecimento de água localizado em WarchaÅy. As seções são projetadas nas usinas de água de WarchaÅy na área do terreno n.º 23/2 WarchaÅa, gm. Jedwabno. A aldeia de Narty está localizada na aglomeração, que é escaneada. Atualmente, os moradores de Nart construíram uma rede de esgotos e tiram água de poços de águas profundas. A construção de poços profundos por residentes, Summermen, pousadas e hotéis na aldeia de Narty faz com que o lago Swiejno seque. A execução do projeto reduzirá a utilização de poços de profundidade e contribuirá para melhorar as relações com a água no lago de Åwijno. 80 pessoas serão conectadas à rede de abastecimento de água recém-construída. O projeto enquadra-se nos pressupostos estabelecidos no SzOOP RPO WiM 2014-2020 âEUR um objetivo específico âEUR mais tratamento de esgotos e melhor qualidade da água através da construção de uma nova rede de abastecimento de água para residentes, turistas, resorts e hotéis em Narty. Candidato âEUR Município de Jedwabno. Para a execução do projeto, foi criada uma unidade de execução do projeto (Regulamento n.º 22/19 de 15.3.2019. (Portuguese) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Se on suunniteltu rakentamaan 8,59 km pitkä vesijohtoverkosto kaupungin Narty: Tontit nro: 23/2, WarchaÅan alue, tontit nro: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, hiihtoalue, tontit nro: 104/18, 105, Burdig. Suunniteltu vesihuoltojärjestelmä toimii WarchaÅyn vesihuollon avulla. Osat on suunniteltu WarchaÅyn vesilaitoksiin tontin nro 23/2 WarchaÅa, gm. Jedwabno. Nartyn kylä sijaitsee taajamassa, joka on skannattu. Tällä hetkellä Nartin asukkaat ovat rakentaneet viemäriverkoston ja vetäneet vettä syvänmeren kaivoista. Asukkaiden, kesämiesten, majataloiden ja hotellien rakentaminen Nartyn kylään aiheuttaa Swiejno-järven kuivumisen. Hankkeen toteuttaminen vähentää syvänmeren kaivojen käyttöä ja parantaa vesisuhteita Åwijno-järvellä. 80 ihmistä kytketään hiljattain rakennettuun vesihuoltoverkkoon. Hanke sopii oletuksiin, jotka on esitetty SzOOP RPO WiM 2014–2020: ssä, erityistavoitteeksi â EUR enemmän jäteveden käsittelyä ja parempaa veden laatua rakentamalla uusi vesihuoltoverkosto asukkaille, matkailijoille, lomakohteille ja hotelleille Nartyssa. Kantaja Jedwabnon kunta. Hankkeen toteuttamiseksi perustettiin hankkeen täytäntöönpanoyksikkö (asetus N:o 22/19, 15.3.2019). (Finnish)
Property / summary: Se on suunniteltu rakentamaan 8,59 km pitkä vesijohtoverkosto kaupungin Narty: Tontit nro: 23/2, WarchaÅan alue, tontit nro: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, hiihtoalue, tontit nro: 104/18, 105, Burdig. Suunniteltu vesihuoltojärjestelmä toimii WarchaÅyn vesihuollon avulla. Osat on suunniteltu WarchaÅyn vesilaitoksiin tontin nro 23/2 WarchaÅa, gm. Jedwabno. Nartyn kylä sijaitsee taajamassa, joka on skannattu. Tällä hetkellä Nartin asukkaat ovat rakentaneet viemäriverkoston ja vetäneet vettä syvänmeren kaivoista. Asukkaiden, kesämiesten, majataloiden ja hotellien rakentaminen Nartyn kylään aiheuttaa Swiejno-järven kuivumisen. Hankkeen toteuttaminen vähentää syvänmeren kaivojen käyttöä ja parantaa vesisuhteita Åwijno-järvellä. 80 ihmistä kytketään hiljattain rakennettuun vesihuoltoverkkoon. Hanke sopii oletuksiin, jotka on esitetty SzOOP RPO WiM 2014–2020: ssä, erityistavoitteeksi â EUR enemmän jäteveden käsittelyä ja parempaa veden laatua rakentamalla uusi vesihuoltoverkosto asukkaille, matkailijoille, lomakohteille ja hotelleille Nartyssa. Kantaja Jedwabnon kunta. Hankkeen toteuttamiseksi perustettiin hankkeen täytäntöönpanoyksikkö (asetus N:o 22/19, 15.3.2019). (Finnish) / rank
 
Normal rank
Property / summary: Se on suunniteltu rakentamaan 8,59 km pitkä vesijohtoverkosto kaupungin Narty: Tontit nro: 23/2, WarchaÅan alue, tontit nro: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, hiihtoalue, tontit nro: 104/18, 105, Burdig. Suunniteltu vesihuoltojärjestelmä toimii WarchaÅyn vesihuollon avulla. Osat on suunniteltu WarchaÅyn vesilaitoksiin tontin nro 23/2 WarchaÅa, gm. Jedwabno. Nartyn kylä sijaitsee taajamassa, joka on skannattu. Tällä hetkellä Nartin asukkaat ovat rakentaneet viemäriverkoston ja vetäneet vettä syvänmeren kaivoista. Asukkaiden, kesämiesten, majataloiden ja hotellien rakentaminen Nartyn kylään aiheuttaa Swiejno-järven kuivumisen. Hankkeen toteuttaminen vähentää syvänmeren kaivojen käyttöä ja parantaa vesisuhteita Åwijno-järvellä. 80 ihmistä kytketään hiljattain rakennettuun vesihuoltoverkkoon. Hanke sopii oletuksiin, jotka on esitetty SzOOP RPO WiM 2014–2020: ssä, erityistavoitteeksi â EUR enemmän jäteveden käsittelyä ja parempaa veden laatua rakentamalla uusi vesihuoltoverkosto asukkaille, matkailijoille, lomakohteille ja hotelleille Nartyssa. Kantaja Jedwabnon kunta. Hankkeen toteuttamiseksi perustettiin hankkeen täytäntöönpanoyksikkö (asetus N:o 22/19, 15.3.2019). (Finnish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Zasnovan je za izgradnjo 8,59 km dolgega vodovodnega omrežja za mesto Narty: Št. parcel: 23/2, regija Warchaža, št. parcel: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, smučišče, št. parcel: 104/18, 105, Burdig. Načrtovani sistem oskrbe z vodo se bo napajal z vodo, ki se nahaja v WarchaÅy. The EURsectionsâ EUR so zasnovani v vodovodih WarchaÅy na območju parcele št. 23/2 WarchaÅa, gm. Jedwabno. Vas Narty se nahaja v aglomeraciji, ki je skenirana. Trenutno so prebivalci Narta zgradili kanalizacijsko omrežje in črpajo vodo iz globokomorskih vodnjakov. Gradnja globokih vodnjakov, ki jih prebivalci, poletniki, gostišča in hoteli v vasi Narty povzroči, da se jezero Swiejno posuši. Izvajanje projekta bo zmanjšalo uporabo globokomorskih vodnjakov in prispevalo k izboljšanju odnosov z vodo na jezeru Åwijno. 80 ljudi bo priključenih na novo zgrajeno omrežje za oskrbo z vodo. Projekt se ujema s predpostavkami, določenimi v SzOOP RPO WiM 2014–2020 â EUR â EUR poseben cilj â EUR več čiščenje odplak in boljšo kakovost vode z izgradnjo novega vodovodnega omrežja za prebivalce, turiste, naselja in hoteli v Narty. Tožeča stranka: Občina Jedwabno. Za izvedbo projekta je bila ustanovljena enota za izvajanje projekta (Uredba št. 22/19 z dne 15. 3. 2019. (Slovenian)
Property / summary: Zasnovan je za izgradnjo 8,59 km dolgega vodovodnega omrežja za mesto Narty: Št. parcel: 23/2, regija Warchaža, št. parcel: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, smučišče, št. parcel: 104/18, 105, Burdig. Načrtovani sistem oskrbe z vodo se bo napajal z vodo, ki se nahaja v WarchaÅy. The EURsectionsâ EUR so zasnovani v vodovodih WarchaÅy na območju parcele št. 23/2 WarchaÅa, gm. Jedwabno. Vas Narty se nahaja v aglomeraciji, ki je skenirana. Trenutno so prebivalci Narta zgradili kanalizacijsko omrežje in črpajo vodo iz globokomorskih vodnjakov. Gradnja globokih vodnjakov, ki jih prebivalci, poletniki, gostišča in hoteli v vasi Narty povzroči, da se jezero Swiejno posuši. Izvajanje projekta bo zmanjšalo uporabo globokomorskih vodnjakov in prispevalo k izboljšanju odnosov z vodo na jezeru Åwijno. 80 ljudi bo priključenih na novo zgrajeno omrežje za oskrbo z vodo. Projekt se ujema s predpostavkami, določenimi v SzOOP RPO WiM 2014–2020 â EUR â EUR poseben cilj â EUR več čiščenje odplak in boljšo kakovost vode z izgradnjo novega vodovodnega omrežja za prebivalce, turiste, naselja in hoteli v Narty. Tožeča stranka: Občina Jedwabno. Za izvedbo projekta je bila ustanovljena enota za izvajanje projekta (Uredba št. 22/19 z dne 15. 3. 2019. (Slovenian) / rank
 
Normal rank
Property / summary: Zasnovan je za izgradnjo 8,59 km dolgega vodovodnega omrežja za mesto Narty: Št. parcel: 23/2, regija Warchaža, št. parcel: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, smučišče, št. parcel: 104/18, 105, Burdig. Načrtovani sistem oskrbe z vodo se bo napajal z vodo, ki se nahaja v WarchaÅy. The EURsectionsâ EUR so zasnovani v vodovodih WarchaÅy na območju parcele št. 23/2 WarchaÅa, gm. Jedwabno. Vas Narty se nahaja v aglomeraciji, ki je skenirana. Trenutno so prebivalci Narta zgradili kanalizacijsko omrežje in črpajo vodo iz globokomorskih vodnjakov. Gradnja globokih vodnjakov, ki jih prebivalci, poletniki, gostišča in hoteli v vasi Narty povzroči, da se jezero Swiejno posuši. Izvajanje projekta bo zmanjšalo uporabo globokomorskih vodnjakov in prispevalo k izboljšanju odnosov z vodo na jezeru Åwijno. 80 ljudi bo priključenih na novo zgrajeno omrežje za oskrbo z vodo. Projekt se ujema s predpostavkami, določenimi v SzOOP RPO WiM 2014–2020 â EUR â EUR poseben cilj â EUR več čiščenje odplak in boljšo kakovost vode z izgradnjo novega vodovodnega omrežja za prebivalce, turiste, naselja in hoteli v Narty. Tožeča stranka: Občina Jedwabno. Za izvedbo projekta je bila ustanovljena enota za izvajanje projekta (Uredba št. 22/19 z dne 15. 3. 2019. (Slovenian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Je určen k vybudování 8,59 km dlouhé vodovodní sítě pro město Narty: Pozemky č.: 23/2, Warchařský kraj, parcely č.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, lyžařský areál, pozemky č.: 104/18, 105, Burdig. Plánovaný systém zásobování vodou bude napájen vodním zdrojem nacházejícím se ve WarchaÅy. â EUR ¢ sekce jsou navrženy ve vodárnách WarchaÅy v oblasti pozemku č. 23/2 WarchaÅa, gm. Jedwabno. Obec Narty se nachází v aglomeraci, která je skenována. V současné době obyvatelé Nart vybudovali kanalizační síť a čerpá vodu z hlubinných studní. Výstavba hlubokých studní obyvateli, letáři, penziony a hotely v obci Narty způsobí, že jezero Swiejno vyschne. Realizace projektu sníží využívání hlubinných vrtů a přispěje ke zlepšení vodohospodářských vztahů v jezeře Åwijno. K nově vybudované vodovodní síti bude připojeno 80 osob. Projekt zapadá do předpokladů stanovených v SzOOP RPO WiM 2014–2020 â EUR specifický cíl › více čištění odpadních vod a lepší kvalitu vody prostřednictvím výstavby nové vodovodní sítě pro obyvatele, turisty, střediska a hotely v Narty. Žalobkyně: obec Jedwabno. Za účelem realizace projektu byla zřízena prováděcí jednotka projektu (nařízení č. 22/19 ze dne 15. března 2019). (Czech)
Property / summary: Je určen k vybudování 8,59 km dlouhé vodovodní sítě pro město Narty: Pozemky č.: 23/2, Warchařský kraj, parcely č.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, lyžařský areál, pozemky č.: 104/18, 105, Burdig. Plánovaný systém zásobování vodou bude napájen vodním zdrojem nacházejícím se ve WarchaÅy. â EUR ¢ sekce jsou navrženy ve vodárnách WarchaÅy v oblasti pozemku č. 23/2 WarchaÅa, gm. Jedwabno. Obec Narty se nachází v aglomeraci, která je skenována. V současné době obyvatelé Nart vybudovali kanalizační síť a čerpá vodu z hlubinných studní. Výstavba hlubokých studní obyvateli, letáři, penziony a hotely v obci Narty způsobí, že jezero Swiejno vyschne. Realizace projektu sníží využívání hlubinných vrtů a přispěje ke zlepšení vodohospodářských vztahů v jezeře Åwijno. K nově vybudované vodovodní síti bude připojeno 80 osob. Projekt zapadá do předpokladů stanovených v SzOOP RPO WiM 2014–2020 â EUR specifický cíl › více čištění odpadních vod a lepší kvalitu vody prostřednictvím výstavby nové vodovodní sítě pro obyvatele, turisty, střediska a hotely v Narty. Žalobkyně: obec Jedwabno. Za účelem realizace projektu byla zřízena prováděcí jednotka projektu (nařízení č. 22/19 ze dne 15. března 2019). (Czech) / rank
 
Normal rank
Property / summary: Je určen k vybudování 8,59 km dlouhé vodovodní sítě pro město Narty: Pozemky č.: 23/2, Warchařský kraj, parcely č.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, lyžařský areál, pozemky č.: 104/18, 105, Burdig. Plánovaný systém zásobování vodou bude napájen vodním zdrojem nacházejícím se ve WarchaÅy. â EUR ¢ sekce jsou navrženy ve vodárnách WarchaÅy v oblasti pozemku č. 23/2 WarchaÅa, gm. Jedwabno. Obec Narty se nachází v aglomeraci, která je skenována. V současné době obyvatelé Nart vybudovali kanalizační síť a čerpá vodu z hlubinných studní. Výstavba hlubokých studní obyvateli, letáři, penziony a hotely v obci Narty způsobí, že jezero Swiejno vyschne. Realizace projektu sníží využívání hlubinných vrtů a přispěje ke zlepšení vodohospodářských vztahů v jezeře Åwijno. K nově vybudované vodovodní síti bude připojeno 80 osob. Projekt zapadá do předpokladů stanovených v SzOOP RPO WiM 2014–2020 â EUR specifický cíl › více čištění odpadních vod a lepší kvalitu vody prostřednictvím výstavby nové vodovodní sítě pro obyvatele, turisty, střediska a hotely v Narty. Žalobkyně: obec Jedwabno. Za účelem realizace projektu byla zřízena prováděcí jednotka projektu (nařízení č. 22/19 ze dne 15. března 2019). (Czech) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Jis skirtas statyti 8,59 km ilgio vandens tiekimo tinklą Narty miestui: Apskaitos barelių nr.: 23/2, WarchaÅa sritis, sklypai nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, slidinėjimo plotas, sklypai Nr.: 104/18, 105, Burdigas. Planuojama vandens tiekimo sistema bus maitinama vandentiekio, esančio Warchajuje. â EURsectionsâ EUR yra suprojektuoti WarchaÅy vandentiekio srityje sklype Nr. 23/2 WarchaÅa, gm. Jedwabno. Narty kaimas yra aglomeracijoje, kuri yra nuskaitoma. Šiuo metu Nart gyventojai pastatė nuotekų tinklą, ir jie gauna vandenį iš giliavandenių šulinių. Dėl gyventojų, vasarnamių, svečių namų ir viešbučių giluminių šulinių statybos Narty kaime Swiejno ežeras išdžiūsta. Projekto įgyvendinimas sumažins giliavandenių šulinių naudojimą ir prisidės prie vandens santykių gerinimo Åwijno ežere. 80 žmonių bus prijungti prie naujai pastatyto vandens tiekimo tinklo. Projektas atitinka prielaidas, išdėstytas SzOOP RPO WiM 2014–2020 â EUR konkretus tikslas â daugiau nuotekų valymo ir geresnės kokybės vandens per naują vandens tiekimo tinklą gyventojams, turistams, kurortams ir viešbučiams Narty statybos. Pareiškėja ā EUR Jedwabno savivaldybė. Projektui įgyvendinti buvo įsteigtas projekto įgyvendinimo skyrius (2019 m. kovo 15 d. Reglamentas Nr. 22/19). (Lithuanian)
Property / summary: Jis skirtas statyti 8,59 km ilgio vandens tiekimo tinklą Narty miestui: Apskaitos barelių nr.: 23/2, WarchaÅa sritis, sklypai nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, slidinėjimo plotas, sklypai Nr.: 104/18, 105, Burdigas. Planuojama vandens tiekimo sistema bus maitinama vandentiekio, esančio Warchajuje. â EURsectionsâ EUR yra suprojektuoti WarchaÅy vandentiekio srityje sklype Nr. 23/2 WarchaÅa, gm. Jedwabno. Narty kaimas yra aglomeracijoje, kuri yra nuskaitoma. Šiuo metu Nart gyventojai pastatė nuotekų tinklą, ir jie gauna vandenį iš giliavandenių šulinių. Dėl gyventojų, vasarnamių, svečių namų ir viešbučių giluminių šulinių statybos Narty kaime Swiejno ežeras išdžiūsta. Projekto įgyvendinimas sumažins giliavandenių šulinių naudojimą ir prisidės prie vandens santykių gerinimo Åwijno ežere. 80 žmonių bus prijungti prie naujai pastatyto vandens tiekimo tinklo. Projektas atitinka prielaidas, išdėstytas SzOOP RPO WiM 2014–2020 â EUR konkretus tikslas â daugiau nuotekų valymo ir geresnės kokybės vandens per naują vandens tiekimo tinklą gyventojams, turistams, kurortams ir viešbučiams Narty statybos. Pareiškėja ā EUR Jedwabno savivaldybė. Projektui įgyvendinti buvo įsteigtas projekto įgyvendinimo skyrius (2019 m. kovo 15 d. Reglamentas Nr. 22/19). (Lithuanian) / rank
 
Normal rank
Property / summary: Jis skirtas statyti 8,59 km ilgio vandens tiekimo tinklą Narty miestui: Apskaitos barelių nr.: 23/2, WarchaÅa sritis, sklypai nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, slidinėjimo plotas, sklypai Nr.: 104/18, 105, Burdigas. Planuojama vandens tiekimo sistema bus maitinama vandentiekio, esančio Warchajuje. â EURsectionsâ EUR yra suprojektuoti WarchaÅy vandentiekio srityje sklype Nr. 23/2 WarchaÅa, gm. Jedwabno. Narty kaimas yra aglomeracijoje, kuri yra nuskaitoma. Šiuo metu Nart gyventojai pastatė nuotekų tinklą, ir jie gauna vandenį iš giliavandenių šulinių. Dėl gyventojų, vasarnamių, svečių namų ir viešbučių giluminių šulinių statybos Narty kaime Swiejno ežeras išdžiūsta. Projekto įgyvendinimas sumažins giliavandenių šulinių naudojimą ir prisidės prie vandens santykių gerinimo Åwijno ežere. 80 žmonių bus prijungti prie naujai pastatyto vandens tiekimo tinklo. Projektas atitinka prielaidas, išdėstytas SzOOP RPO WiM 2014–2020 â EUR konkretus tikslas â daugiau nuotekų valymo ir geresnės kokybės vandens per naują vandens tiekimo tinklą gyventojams, turistams, kurortams ir viešbučiams Narty statybos. Pareiškėja ā EUR Jedwabno savivaldybė. Projektui įgyvendinti buvo įsteigtas projekto įgyvendinimo skyrius (2019 m. kovo 15 d. Reglamentas Nr. 22/19). (Lithuanian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Tas ir paredzēts, lai izveidotu 8,59 km garu ūdensapgādes tīklu Narty pilsētai: Zemes gabalu Nr.: 23/2, WarchaÅa reģions, zemesgabali Nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, slēpošanas zona, zemes gabalu Nr.: 104/18, 105, Burdig. Plānotā ūdensapgādes sistēma tiks darbināta ar ūdens piegādi, kas atrodas WarchaÅy. â EURsectionsâ EUR ir paredzēti ūdensdarbiem WarchaÅy jomā zemes gabala Nr. 23/2 WarchaÅa, gm. Jedwabno. Narty ciemats atrodas aglomerācijā, kas tiek skenēta. Pašlaik Nart iedzīvotāji ir izveidojuši kanalizācijas tīklu, un viņi iegūst ūdeni no dziļūdens akām. Dziļu aku būvniecība, ko veic iedzīvotāji, vasarnieki, viesu nami un viesnīcas Narty ciematā, liek Swiejno ezeram nožūt. Projekta īstenošana samazinās dziļūdens aku izmantošanu un palīdzēs uzlabot ūdens attiecības Ūvijno ezerā. 80 cilvēki tiks pieslēgti jaunceltajam ūdensapgādes tīklam. Projekts atbilst pieņēmumiem, kas izklāstīti SzOOP RPO WiM 2014–2020 â EUR konkrētu mērķi â EUR vairāk notekūdeņu attīrīšanas un labāku ūdens kvalitāti, veidojot jaunu ūdensapgādes tīklu iedzīvotājiem, tūristiem, kūrortiem un viesnīcām Narty. Pieteikuma iesniedzējs Jedwabno pašvaldība. Projekta īstenošanai tika izveidota projekta īstenošanas struktūrvienība (15.03.2019. noteikumi Nr. 22/19. (Latvian)
Property / summary: Tas ir paredzēts, lai izveidotu 8,59 km garu ūdensapgādes tīklu Narty pilsētai: Zemes gabalu Nr.: 23/2, WarchaÅa reģions, zemesgabali Nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, slēpošanas zona, zemes gabalu Nr.: 104/18, 105, Burdig. Plānotā ūdensapgādes sistēma tiks darbināta ar ūdens piegādi, kas atrodas WarchaÅy. â EURsectionsâ EUR ir paredzēti ūdensdarbiem WarchaÅy jomā zemes gabala Nr. 23/2 WarchaÅa, gm. Jedwabno. Narty ciemats atrodas aglomerācijā, kas tiek skenēta. Pašlaik Nart iedzīvotāji ir izveidojuši kanalizācijas tīklu, un viņi iegūst ūdeni no dziļūdens akām. Dziļu aku būvniecība, ko veic iedzīvotāji, vasarnieki, viesu nami un viesnīcas Narty ciematā, liek Swiejno ezeram nožūt. Projekta īstenošana samazinās dziļūdens aku izmantošanu un palīdzēs uzlabot ūdens attiecības Ūvijno ezerā. 80 cilvēki tiks pieslēgti jaunceltajam ūdensapgādes tīklam. Projekts atbilst pieņēmumiem, kas izklāstīti SzOOP RPO WiM 2014–2020 â EUR konkrētu mērķi â EUR vairāk notekūdeņu attīrīšanas un labāku ūdens kvalitāti, veidojot jaunu ūdensapgādes tīklu iedzīvotājiem, tūristiem, kūrortiem un viesnīcām Narty. Pieteikuma iesniedzējs Jedwabno pašvaldība. Projekta īstenošanai tika izveidota projekta īstenošanas struktūrvienība (15.03.2019. noteikumi Nr. 22/19. (Latvian) / rank
 
Normal rank
Property / summary: Tas ir paredzēts, lai izveidotu 8,59 km garu ūdensapgādes tīklu Narty pilsētai: Zemes gabalu Nr.: 23/2, WarchaÅa reģions, zemesgabali Nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, slēpošanas zona, zemes gabalu Nr.: 104/18, 105, Burdig. Plānotā ūdensapgādes sistēma tiks darbināta ar ūdens piegādi, kas atrodas WarchaÅy. â EURsectionsâ EUR ir paredzēti ūdensdarbiem WarchaÅy jomā zemes gabala Nr. 23/2 WarchaÅa, gm. Jedwabno. Narty ciemats atrodas aglomerācijā, kas tiek skenēta. Pašlaik Nart iedzīvotāji ir izveidojuši kanalizācijas tīklu, un viņi iegūst ūdeni no dziļūdens akām. Dziļu aku būvniecība, ko veic iedzīvotāji, vasarnieki, viesu nami un viesnīcas Narty ciematā, liek Swiejno ezeram nožūt. Projekta īstenošana samazinās dziļūdens aku izmantošanu un palīdzēs uzlabot ūdens attiecības Ūvijno ezerā. 80 cilvēki tiks pieslēgti jaunceltajam ūdensapgādes tīklam. Projekts atbilst pieņēmumiem, kas izklāstīti SzOOP RPO WiM 2014–2020 â EUR konkrētu mērķi â EUR vairāk notekūdeņu attīrīšanas un labāku ūdens kvalitāti, veidojot jaunu ūdensapgādes tīklu iedzīvotājiem, tūristiem, kūrortiem un viesnīcām Narty. Pieteikuma iesniedzējs Jedwabno pašvaldība. Projekta īstenošanai tika izveidota projekta īstenošanas struktūrvienība (15.03.2019. noteikumi Nr. 22/19. (Latvian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Проектирана е за изграждане на водоснабдителна мрежа с дължина 8,59 км за град Нарти: Парцели №: 23/2, област WarchaÅa, парцел №: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ски зона, парцели №: 104/18, 105, Бърдиг. Планираната система за водоснабдяване ще се захранва от водоснабдяване, разположено в WarchaÅy. â EURsectionsâ EUR са проектирани във водните заводи на WarchaÅy в района на парцел № 23/2 WarchaÅa, gm. Jedwabno. Село Нарти се намира в агломерацията, която се сканира. В момента жителите на Нарт са изградили канализационна мрежа и те черпят вода от дълбоководни кладенци. Изграждането на дълбоки кладенци от обитатели, летовници, къщи за гости и хотели в село Нарти води до изсъхване на езерото Swiejno. Изпълнението на проекта ще намали използването на дълбоководни кладенци и ще допринесе за подобряване на водните отношения в езерото Åwijno. 80 души ще бъдат свързани към новоизградената водоснабдителна мрежа. Проектът се вписва в допусканията, изложени в SzOOP RPO WiM 2014—2020 г. — конкретна цел — повече пречистване на отпадъчните води и по-добро качество на водата чрез изграждането на нова водоснабдителна мрежа за жителите, туристите, курортите и хотелите в Нарти. Жалбоподател в община Джедвабно. За изпълнението на проекта е създадено звено за изпълнение на проекта (Наредба № 22/19 от 15.03.2019 г.). (Bulgarian)
Property / summary: Проектирана е за изграждане на водоснабдителна мрежа с дължина 8,59 км за град Нарти: Парцели №: 23/2, област WarchaÅa, парцел №: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ски зона, парцели №: 104/18, 105, Бърдиг. Планираната система за водоснабдяване ще се захранва от водоснабдяване, разположено в WarchaÅy. â EURsectionsâ EUR са проектирани във водните заводи на WarchaÅy в района на парцел № 23/2 WarchaÅa, gm. Jedwabno. Село Нарти се намира в агломерацията, която се сканира. В момента жителите на Нарт са изградили канализационна мрежа и те черпят вода от дълбоководни кладенци. Изграждането на дълбоки кладенци от обитатели, летовници, къщи за гости и хотели в село Нарти води до изсъхване на езерото Swiejno. Изпълнението на проекта ще намали използването на дълбоководни кладенци и ще допринесе за подобряване на водните отношения в езерото Åwijno. 80 души ще бъдат свързани към новоизградената водоснабдителна мрежа. Проектът се вписва в допусканията, изложени в SzOOP RPO WiM 2014—2020 г. — конкретна цел — повече пречистване на отпадъчните води и по-добро качество на водата чрез изграждането на нова водоснабдителна мрежа за жителите, туристите, курортите и хотелите в Нарти. Жалбоподател в община Джедвабно. За изпълнението на проекта е създадено звено за изпълнение на проекта (Наредба № 22/19 от 15.03.2019 г.). (Bulgarian) / rank
 
Normal rank
Property / summary: Проектирана е за изграждане на водоснабдителна мрежа с дължина 8,59 км за град Нарти: Парцели №: 23/2, област WarchaÅa, парцел №: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ски зона, парцели №: 104/18, 105, Бърдиг. Планираната система за водоснабдяване ще се захранва от водоснабдяване, разположено в WarchaÅy. â EURsectionsâ EUR са проектирани във водните заводи на WarchaÅy в района на парцел № 23/2 WarchaÅa, gm. Jedwabno. Село Нарти се намира в агломерацията, която се сканира. В момента жителите на Нарт са изградили канализационна мрежа и те черпят вода от дълбоководни кладенци. Изграждането на дълбоки кладенци от обитатели, летовници, къщи за гости и хотели в село Нарти води до изсъхване на езерото Swiejno. Изпълнението на проекта ще намали използването на дълбоководни кладенци и ще допринесе за подобряване на водните отношения в езерото Åwijno. 80 души ще бъдат свързани към новоизградената водоснабдителна мрежа. Проектът се вписва в допусканията, изложени в SzOOP RPO WiM 2014—2020 г. — конкретна цел — повече пречистване на отпадъчните води и по-добро качество на водата чрез изграждането на нова водоснабдителна мрежа за жителите, туристите, курортите и хотелите в Нарти. Жалбоподател в община Джедвабно. За изпълнението на проекта е създадено звено за изпълнение на проекта (Наредба № 22/19 от 15.03.2019 г.). (Bulgarian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Úgy tervezték, hogy építsen egy 8,59 km hosszú vízellátó hálózatot Narty város számára: Telkek száma: 23/2, WarchaÅa régió, telkek száma: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, síterület, telkek száma: 104/18, 105, Burdig. A tervezett vízellátó rendszert a WarchaÅyben található vízellátás biztosítja. A szakaszok a Warchay vízműveiben vannak kialakítva a 23/2 WarchaÅa, gm. Jedwabno telek területén. Narty falu az agglomerációban található, amely szkennelt. Jelenleg a Nart lakói szennyvízhálózatot építettek, és mélyvízi kutakból vonnak vizet. A lakók, a nyaralók, a vendégházak és a szállodák mély kutak építése Narty faluban a Swiejno tó kiszáradását okozza. A projekt végrehajtása csökkenti a mélyvízi kutak használatát, és hozzájárul az Åwijno-tó vízügyi kapcsolatainak javításához. 80 fő csatlakozik az újonnan épített vízellátó hálózathoz. A projekt illeszkedik a SzOOP RPO WiM 2014–2020-as időszakra vonatkozó feltevéseihez, amely egy új vízellátó hálózat kiépítésével több szennyvízkezelést és jobb vízminőséget határoz meg a Narty-ban lakók, turisták, üdülőhelyek és szállodák számára. Felperes Jedwabno önkormányzata. A projekt végrehajtása érdekében létrehoztak egy projektvégrehajtási egységet (2019. március 15-i 22/19 rendelet). (Hungarian)
Property / summary: Úgy tervezték, hogy építsen egy 8,59 km hosszú vízellátó hálózatot Narty város számára: Telkek száma: 23/2, WarchaÅa régió, telkek száma: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, síterület, telkek száma: 104/18, 105, Burdig. A tervezett vízellátó rendszert a WarchaÅyben található vízellátás biztosítja. A szakaszok a Warchay vízműveiben vannak kialakítva a 23/2 WarchaÅa, gm. Jedwabno telek területén. Narty falu az agglomerációban található, amely szkennelt. Jelenleg a Nart lakói szennyvízhálózatot építettek, és mélyvízi kutakból vonnak vizet. A lakók, a nyaralók, a vendégházak és a szállodák mély kutak építése Narty faluban a Swiejno tó kiszáradását okozza. A projekt végrehajtása csökkenti a mélyvízi kutak használatát, és hozzájárul az Åwijno-tó vízügyi kapcsolatainak javításához. 80 fő csatlakozik az újonnan épített vízellátó hálózathoz. A projekt illeszkedik a SzOOP RPO WiM 2014–2020-as időszakra vonatkozó feltevéseihez, amely egy új vízellátó hálózat kiépítésével több szennyvízkezelést és jobb vízminőséget határoz meg a Narty-ban lakók, turisták, üdülőhelyek és szállodák számára. Felperes Jedwabno önkormányzata. A projekt végrehajtása érdekében létrehoztak egy projektvégrehajtási egységet (2019. március 15-i 22/19 rendelet). (Hungarian) / rank
 
Normal rank
Property / summary: Úgy tervezték, hogy építsen egy 8,59 km hosszú vízellátó hálózatot Narty város számára: Telkek száma: 23/2, WarchaÅa régió, telkek száma: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, síterület, telkek száma: 104/18, 105, Burdig. A tervezett vízellátó rendszert a WarchaÅyben található vízellátás biztosítja. A szakaszok a Warchay vízműveiben vannak kialakítva a 23/2 WarchaÅa, gm. Jedwabno telek területén. Narty falu az agglomerációban található, amely szkennelt. Jelenleg a Nart lakói szennyvízhálózatot építettek, és mélyvízi kutakból vonnak vizet. A lakók, a nyaralók, a vendégházak és a szállodák mély kutak építése Narty faluban a Swiejno tó kiszáradását okozza. A projekt végrehajtása csökkenti a mélyvízi kutak használatát, és hozzájárul az Åwijno-tó vízügyi kapcsolatainak javításához. 80 fő csatlakozik az újonnan épített vízellátó hálózathoz. A projekt illeszkedik a SzOOP RPO WiM 2014–2020-as időszakra vonatkozó feltevéseihez, amely egy új vízellátó hálózat kiépítésével több szennyvízkezelést és jobb vízminőséget határoz meg a Narty-ban lakók, turisták, üdülőhelyek és szállodák számára. Felperes Jedwabno önkormányzata. A projekt végrehajtása érdekében létrehoztak egy projektvégrehajtási egységet (2019. március 15-i 22/19 rendelet). (Hungarian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Tá sé deartha chun gréasán soláthair uisce 8.59 km a thógáil do bhaile Narty: Ceapacha uimh.: 23/2, réigiún WarchaÅa, ceapacha uimh.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, limistéar sciála, ceapacha uimh.: 104/18, 105, Burdig. Beidh an córas soláthar uisce atá beartaithe a thiomáint ag soláthar uisce atá suite i WarchaÅy. An EUR â EURsectionsâ EURTá siad deartha in oibreacha uisce WarchaÅy i réimse an plota uimh. 23/2 WarchaÅa, gm. Jedwabno. Tá sráidbhaile Narty suite sa cheirtleán, atá scanta. Faoi láthair, tá cónaitheoirí Nart tar éis líonra séarachais a thógáil, agus tarraingíonn siad uisce ó thoibreacha domhainuisce. Is é an tógáil toibreacha domhain ag cónaitheoirí, summermen, tithe aíochta agus óstáin i sráidbhaile Narty cúiseanna an loch Swiejno a thriomú suas. Laghdóidh cur chun feidhme an tionscadail an úsáid a bhaintear as toibreacha domhainuisce agus cuideoidh sé le feabhas a chur ar chaidreamh uisce i Loch Åwijno. Beidh 80 duine ceangailte leis an líonra soláthair uisce nuathógtha. Luíonn an tionscadal isteach na boinn tuisceana atá leagtha amach sa SzOOP RPO WiM 2014-2020 â EUR â EUR â ar leith â EUR â EUR â EUR â EUR â ar leith cóireála séarachais agus ar chaighdeán níos fearr uisce trí thógáil líonra soláthair uisce nua do chónaitheoirí, turasóirí, ionaid saoire agus óstáin i Narty. Iarratasóir â EUR Bardas na Jedwabno. Chun an tionscadal a chur chun feidhme, bunaíodh aonad cur chun feidhme tionscadail (Rialachán Uimh. 22/19 an 15.03.2019. (Irish)
Property / summary: Tá sé deartha chun gréasán soláthair uisce 8.59 km a thógáil do bhaile Narty: Ceapacha uimh.: 23/2, réigiún WarchaÅa, ceapacha uimh.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, limistéar sciála, ceapacha uimh.: 104/18, 105, Burdig. Beidh an córas soláthar uisce atá beartaithe a thiomáint ag soláthar uisce atá suite i WarchaÅy. An EUR â EURsectionsâ EURTá siad deartha in oibreacha uisce WarchaÅy i réimse an plota uimh. 23/2 WarchaÅa, gm. Jedwabno. Tá sráidbhaile Narty suite sa cheirtleán, atá scanta. Faoi láthair, tá cónaitheoirí Nart tar éis líonra séarachais a thógáil, agus tarraingíonn siad uisce ó thoibreacha domhainuisce. Is é an tógáil toibreacha domhain ag cónaitheoirí, summermen, tithe aíochta agus óstáin i sráidbhaile Narty cúiseanna an loch Swiejno a thriomú suas. Laghdóidh cur chun feidhme an tionscadail an úsáid a bhaintear as toibreacha domhainuisce agus cuideoidh sé le feabhas a chur ar chaidreamh uisce i Loch Åwijno. Beidh 80 duine ceangailte leis an líonra soláthair uisce nuathógtha. Luíonn an tionscadal isteach na boinn tuisceana atá leagtha amach sa SzOOP RPO WiM 2014-2020 â EUR â EUR â ar leith â EUR â EUR â EUR â EUR â ar leith cóireála séarachais agus ar chaighdeán níos fearr uisce trí thógáil líonra soláthair uisce nua do chónaitheoirí, turasóirí, ionaid saoire agus óstáin i Narty. Iarratasóir â EUR Bardas na Jedwabno. Chun an tionscadal a chur chun feidhme, bunaíodh aonad cur chun feidhme tionscadail (Rialachán Uimh. 22/19 an 15.03.2019. (Irish) / rank
 
Normal rank
Property / summary: Tá sé deartha chun gréasán soláthair uisce 8.59 km a thógáil do bhaile Narty: Ceapacha uimh.: 23/2, réigiún WarchaÅa, ceapacha uimh.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, limistéar sciála, ceapacha uimh.: 104/18, 105, Burdig. Beidh an córas soláthar uisce atá beartaithe a thiomáint ag soláthar uisce atá suite i WarchaÅy. An EUR â EURsectionsâ EURTá siad deartha in oibreacha uisce WarchaÅy i réimse an plota uimh. 23/2 WarchaÅa, gm. Jedwabno. Tá sráidbhaile Narty suite sa cheirtleán, atá scanta. Faoi láthair, tá cónaitheoirí Nart tar éis líonra séarachais a thógáil, agus tarraingíonn siad uisce ó thoibreacha domhainuisce. Is é an tógáil toibreacha domhain ag cónaitheoirí, summermen, tithe aíochta agus óstáin i sráidbhaile Narty cúiseanna an loch Swiejno a thriomú suas. Laghdóidh cur chun feidhme an tionscadail an úsáid a bhaintear as toibreacha domhainuisce agus cuideoidh sé le feabhas a chur ar chaidreamh uisce i Loch Åwijno. Beidh 80 duine ceangailte leis an líonra soláthair uisce nuathógtha. Luíonn an tionscadal isteach na boinn tuisceana atá leagtha amach sa SzOOP RPO WiM 2014-2020 â EUR â EUR â ar leith â EUR â EUR â EUR â EUR â ar leith cóireála séarachais agus ar chaighdeán níos fearr uisce trí thógáil líonra soláthair uisce nua do chónaitheoirí, turasóirí, ionaid saoire agus óstáin i Narty. Iarratasóir â EUR Bardas na Jedwabno. Chun an tionscadal a chur chun feidhme, bunaíodh aonad cur chun feidhme tionscadail (Rialachán Uimh. 22/19 an 15.03.2019. (Irish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Det är utformat för att bygga ett 8,59 km långt vattenförsörjningsnät för staden Narty: Tomter nr: 23/2, WarchaÅa-regionen, tomter nr: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skidområde, tomt nr: 104/18, 105, Burdig. Det planerade vattenförsörjningssystemet kommer att drivas av vattenförsörjning i WarchaÅy. Avsnitten är utformade i vattenverken i WarchaÅy i området tomt nr 23/2 WarchaÅa, gm. Jedwabno. Byn Narty ligger i tätorten, som är skannad. För närvarande har Narts invånare byggt ett avloppsnät, och de hämtar vatten från djupa vattenbrunnar. Byggandet av djupa brunnar av invånare, somrar, pensionat och hotell i byn Narty orsakar sjön Swiejno att torka upp. Genomförandet av projektet kommer att minska användningen av djuphavsbrunnar och bidra till att förbättra vattenrelationerna i sjön Åwijno. 80 personer kommer att anslutas till det nybyggda vattenförsörjningsnätet. Projektet passar in i antagandena i SzOOP RPO WiM 2014–2020 â EUR ett specifikt mål â EUR mer avloppsrening och bättre vattenkvalitet genom byggandet av ett nytt vattenförsörjningsnät för invånare, turister, orter och hotell i Narty. Sökande â EUR kommun Jedwabno. För att genomföra projektet inrättades en genomförandeenhet för projektet (föreskrifter nr 22/19 av den 15 mars 2019). (Swedish)
Property / summary: Det är utformat för att bygga ett 8,59 km långt vattenförsörjningsnät för staden Narty: Tomter nr: 23/2, WarchaÅa-regionen, tomter nr: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skidområde, tomt nr: 104/18, 105, Burdig. Det planerade vattenförsörjningssystemet kommer att drivas av vattenförsörjning i WarchaÅy. Avsnitten är utformade i vattenverken i WarchaÅy i området tomt nr 23/2 WarchaÅa, gm. Jedwabno. Byn Narty ligger i tätorten, som är skannad. För närvarande har Narts invånare byggt ett avloppsnät, och de hämtar vatten från djupa vattenbrunnar. Byggandet av djupa brunnar av invånare, somrar, pensionat och hotell i byn Narty orsakar sjön Swiejno att torka upp. Genomförandet av projektet kommer att minska användningen av djuphavsbrunnar och bidra till att förbättra vattenrelationerna i sjön Åwijno. 80 personer kommer att anslutas till det nybyggda vattenförsörjningsnätet. Projektet passar in i antagandena i SzOOP RPO WiM 2014–2020 â EUR ett specifikt mål â EUR mer avloppsrening och bättre vattenkvalitet genom byggandet av ett nytt vattenförsörjningsnät för invånare, turister, orter och hotell i Narty. Sökande â EUR kommun Jedwabno. För att genomföra projektet inrättades en genomförandeenhet för projektet (föreskrifter nr 22/19 av den 15 mars 2019). (Swedish) / rank
 
Normal rank
Property / summary: Det är utformat för att bygga ett 8,59 km långt vattenförsörjningsnät för staden Narty: Tomter nr: 23/2, WarchaÅa-regionen, tomter nr: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skidområde, tomt nr: 104/18, 105, Burdig. Det planerade vattenförsörjningssystemet kommer att drivas av vattenförsörjning i WarchaÅy. Avsnitten är utformade i vattenverken i WarchaÅy i området tomt nr 23/2 WarchaÅa, gm. Jedwabno. Byn Narty ligger i tätorten, som är skannad. För närvarande har Narts invånare byggt ett avloppsnät, och de hämtar vatten från djupa vattenbrunnar. Byggandet av djupa brunnar av invånare, somrar, pensionat och hotell i byn Narty orsakar sjön Swiejno att torka upp. Genomförandet av projektet kommer att minska användningen av djuphavsbrunnar och bidra till att förbättra vattenrelationerna i sjön Åwijno. 80 personer kommer att anslutas till det nybyggda vattenförsörjningsnätet. Projektet passar in i antagandena i SzOOP RPO WiM 2014–2020 â EUR ett specifikt mål â EUR mer avloppsrening och bättre vattenkvalitet genom byggandet av ett nytt vattenförsörjningsnät för invånare, turister, orter och hotell i Narty. Sökande â EUR kommun Jedwabno. För att genomföra projektet inrättades en genomförandeenhet för projektet (föreskrifter nr 22/19 av den 15 mars 2019). (Swedish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Selle eesmärk on ehitada Narty linnale 8,59 km pikkune veevarustusvõrk: Proovitükid nr: 23/2, WarchaÅa piirkond, krundid nr: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, suusaala, krundid nr: 104/18, 105, Burdig. Planeeritud veevarustussüsteemi toidetakse veevarustus asub WarchaÅy. â EUR Sektsioonid on kavandatud veetööd WarchaÅy piirkonnas krundi nr 23/2 WarchaÅa, gm. Jedwabno. Narty küla asub linnastus, mis on skaneeritud. Praegu on Narti elanikud ehitanud kanalisatsioonivõrgu ja nad tõmbavad vett süvaveekaevudest. Narty küla elanike, suvilate, külalistemajade ja hotellide sügavate kaevude ehitamine põhjustab Swiejno järve kuivamise. Projekti rakendamine vähendab süvaveekaevude kasutamist ja aitab parandada veesuhteid Åwijno järves. Uue veevarustusvõrguga ühendatakse 80 inimest. Projekt sobib eeldustega, mis on sätestatud SzOOP RPO WiM 2014–2020 erieesmärgiks âEUR rohkem reoveepuhastust ja vee kvaliteedi parandamist, ehitades Narty elanikele, turistidele, kuurortidele ja hotellidele uue veevarustusvõrgu. Taotleja Jedwabno vald. Projekti elluviimiseks loodi projekti rakendamise üksus (15. märtsi 2019. aasta määrus nr 22/19). (Estonian)
Property / summary: Selle eesmärk on ehitada Narty linnale 8,59 km pikkune veevarustusvõrk: Proovitükid nr: 23/2, WarchaÅa piirkond, krundid nr: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, suusaala, krundid nr: 104/18, 105, Burdig. Planeeritud veevarustussüsteemi toidetakse veevarustus asub WarchaÅy. â EUR Sektsioonid on kavandatud veetööd WarchaÅy piirkonnas krundi nr 23/2 WarchaÅa, gm. Jedwabno. Narty küla asub linnastus, mis on skaneeritud. Praegu on Narti elanikud ehitanud kanalisatsioonivõrgu ja nad tõmbavad vett süvaveekaevudest. Narty küla elanike, suvilate, külalistemajade ja hotellide sügavate kaevude ehitamine põhjustab Swiejno järve kuivamise. Projekti rakendamine vähendab süvaveekaevude kasutamist ja aitab parandada veesuhteid Åwijno järves. Uue veevarustusvõrguga ühendatakse 80 inimest. Projekt sobib eeldustega, mis on sätestatud SzOOP RPO WiM 2014–2020 erieesmärgiks âEUR rohkem reoveepuhastust ja vee kvaliteedi parandamist, ehitades Narty elanikele, turistidele, kuurortidele ja hotellidele uue veevarustusvõrgu. Taotleja Jedwabno vald. Projekti elluviimiseks loodi projekti rakendamise üksus (15. märtsi 2019. aasta määrus nr 22/19). (Estonian) / rank
 
Normal rank
Property / summary: Selle eesmärk on ehitada Narty linnale 8,59 km pikkune veevarustusvõrk: Proovitükid nr: 23/2, WarchaÅa piirkond, krundid nr: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, suusaala, krundid nr: 104/18, 105, Burdig. Planeeritud veevarustussüsteemi toidetakse veevarustus asub WarchaÅy. â EUR Sektsioonid on kavandatud veetööd WarchaÅy piirkonnas krundi nr 23/2 WarchaÅa, gm. Jedwabno. Narty küla asub linnastus, mis on skaneeritud. Praegu on Narti elanikud ehitanud kanalisatsioonivõrgu ja nad tõmbavad vett süvaveekaevudest. Narty küla elanike, suvilate, külalistemajade ja hotellide sügavate kaevude ehitamine põhjustab Swiejno järve kuivamise. Projekti rakendamine vähendab süvaveekaevude kasutamist ja aitab parandada veesuhteid Åwijno järves. Uue veevarustusvõrguga ühendatakse 80 inimest. Projekt sobib eeldustega, mis on sätestatud SzOOP RPO WiM 2014–2020 erieesmärgiks âEUR rohkem reoveepuhastust ja vee kvaliteedi parandamist, ehitades Narty elanikele, turistidele, kuurortidele ja hotellidele uue veevarustusvõrgu. Taotleja Jedwabno vald. Projekti elluviimiseks loodi projekti rakendamise üksus (15. märtsi 2019. aasta määrus nr 22/19). (Estonian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:00, 2 July 2022

Project Q132484 in Poland
Language Label Description Also known as
English
Construction of a water supply network in Narty
Project Q132484 in Poland

    Statements

    0 references
    1,421,791.61 zloty
    0 references
    341,229.99 Euro
    13 January 2020
    0 references
    1,672,696.01 zloty
    0 references
    401,447.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 September 2019
    0 references
    31 August 2020
    0 references
    GMINA JEDWABNO
    0 references

    53°31'47.3"N, 20°43'36.5"E
    0 references
    Projektuje się budowę sieci wodociągowej o długości 8,59 km dla miejscowości Narty: Działki nr ewid.: 23/2, obręb Warchały, Działki nr ewid.: 15, 18/38, 18/42, 18/52, 18/54, 20/10, 20/17, 20/22, 20/23, 20/26, 25/1, 26/5, 26/6, 26/8, 26/9, 27, 28, 29, 30, 31, 32/1, 34, 35, 36/1, 36/4, 37, 38, 39, 40/3, 41/7, 41/9, 41/13, 41/16, 41/45, 41/70, 41/71, 41/72, 43/18, 46/8, 46/21, 46/37, 46/38, 46/59, 46/60, 46/66, 46/67, 46/72, 46/73, 49/1, 50/1, 61/8, 61/16, 61/36, 61/46, 61/47, 61/78, 61/102, 61/123, 62, 76/1, 77/1, 77/3, 79/1, 79/5, 81/20, 81/25, 82/5, 82/9, 82/10, 82/11, 82/12, 82/14, 85/3, 85/8, 105/23, 105/42, 105/78, 105/102, 105/115, 110/1, 111, 114, 116/1, 118/1, 120/1, 121/8, 141/3; 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, obręb Narty, działki nr ewid.: 104/18, 105 obręb Burdąg. Projektowana sieć wodociągowa będzie zasilana z wodociągu zlokalizowanego w miejscowości Warchały. Projektuje się "wcinki" w wodociąg miejscowości Warchały na terenie działki nr 23/2 obręb Warchały, gm. Jedwabno. Miejscowość Narty położona jest na terenie aglomeracji, który jest skanalizowana. W chwili obecnej mieszkańcy Nart mają wybudowaną sieć kanalizacyjną, a wodę pobierają ze studni głębinowych. Budowa studni głębinowych przez mieszkańców, letników, pensjonaty i hotele w miejscowości Narty powoduje osuszanie się jeziora Świętajno. Realizacja projektu ograniczy korzystanie ze studni głębinowych i przyczyni się do poprawy stosunków wodnych jeziora Świętajno. Do nowo wybudowanej sieci wodociągowej zostanie podłączonych 80 os. Projekt wpisuje się w założenia określone w SzOOP RPO WiM 2014-2020 - cel szczegółowy - więcej oczyszczonych ścieków i lepsza jakość wody poprzez budowę nowej sieci wodociągowej dla mieszkańców, turystów, ośrodków wypoczynkowych i hoteli w miejscowości Narty. Wnioskodawca - Gmina Jedwabno. W celu realizacji projektu została powołana jednostka realizująca projekt (Zarządzenie Nr 22/19 z dnia 15.03.2019 r. Wójta Gminy Jedwabno). (Polish)
    0 references
    It is designed to build a 8.59 km long water supply network for the town of Narty: Plots no.: 23/2, Warchała region, plots no.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ski area, plots no.: 104/18, 105, Burdig. The planned water supply system will be powered by water supply located in Warchały. The “sections” are designed in the waterworks of Warchały in the area of plot no. 23/2 Warchała, gm. Jedwabno. The village of Narty is located in the agglomeration, which is scanned. At present, Nart residents have built a sewage network, and they draw water from deep-water wells. The construction of deep wells by residents, summermen, guesthouses and hotels in the village of Narty causes the lake Swiejno to dry up. The implementation of the project will reduce the use of deep-water wells and contribute to improving water relations in Lake Świjno. 80 people will be connected to the newly built water supply network. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 – a specific objective – more sewage treatment and better quality of water through the construction of a new water supply network for residents, tourists, resorts and hotels in Narty. Applicant – Municipality of Jedwabno. In order to implement the project, a project implementation unit was established (Regulation No. 22/19 of 15.03.2019. (English)
    21 October 2020
    0 references
    La construction d’un réseau d’approvisionnement en eau d’une longueur de 8,59 km est prévue pour le village de Narty: No de la parcelle: 23/2, région de Warchala, parcelle no: 15, 18/38, 18/42, 18/52, 18/54, 20/10, 20/17, 20/22, 20/23, 20/26, 25/1, 26/5, 26/6, 26/8, 26/9, 27, 28, 29, 30, 31, 32/1, 34, 35, 36/1, 36/4, 37, 38, 39, 40/3, 41/7, 41/9, 41/13, 41/16, 41/45, 41/70, 41/71, 41/72, 43/18, 46/8, 46/21, 46/37, 46/38, 46/59, 46/60, 46/66, 46/67, 46/72, 46/73, 49/1, 50/1, 61/8, 61/16, 61/36, 61/46, 61/47, 61/78, 61/102, 61/123, 62, 76/1, 77/1, 77/3, 79/1, 79/5, 81/20, 81/25, 82/5, 82/9, 82/10, 82/11, 82/12, 82/14, 85/3, 85/8, 105/23, 105/42, 105/78, 105/102, 105/115, 110/1, 111, 114, 116/1, 118/1, 120/1, 121/8, 141/3; 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, domaine skiable, parcelle no. 104/18, 105 périmètres Burdag. Le réseau d’approvisionnement en eau prévu sera alimenté par un réseau d’approvisionnement en eau situé à Warchały. Les «cinths» sont conçus pour les ouvrages d’eau de Warchały dans la zone de la parcelle no 23/2 de Warchala, Silkwabno. Le village de Ski est situé dans une agglomération, qui est scannée. À l’heure actuelle, les habitants de Nart ont construit un réseau d’assainissement et ils prennent de l’eau dans les puits profonds. La construction de puits profonds par les résidents, les étés, les maisons d’hôtes et les hôtels dans le village de Narty fait sécher le lac Świętajno. La mise en œuvre du projet réduira l’utilisation des puits d’eau profonde et contribuera à améliorer les relations avec l’eau du lac Świętajno. 80 personnes seront reliées au nouveau réseau d’approvisionnement en eau. Le projet est conforme aux hypothèses énoncées dans le SzOOP ROP WiM 2014-2020 — un objectif spécifique — des eaux usées plus traitées et une meilleure qualité de l’eau grâce à la construction d’un nouveau réseau d’approvisionnement en eau pour les résidents, les touristes, les centres de vacances et les hôtels à Narty. Partie requérante — Municipalité de Silkwabno. Afin de mettre en œuvre le projet, une unité de mise en œuvre du projet a été créée (ordonnance no 22/19 du 15 mars 2019, maire de la municipalité de Jedwabno). (French)
    2 December 2021
    0 references
    Der Bau eines Wasserversorgungsnetzes mit einer Länge von 8,59 km ist für das Dorf Narty geplant: Grundstück Nr.: 23/2, Warchala Bereich, Grundstücks-Nr.: 15, 18/38, 18/42, 18/52, 18/54, 20/10, 20/17, 20/22, 20/23, 20/26, 25/1, 26/5, 26/6, 26/8, 26/9, 27, 28, 29, 30, 31, 32/1, 34, 35, 36/1, 36/4, 37, 38, 39, 40/3, 41/7, 41/9, 41/13, 41/16, 41/45, 41/70, 41/71, 41/72, 43/18, 46/8, 46/21, 46/37, 46/38, 46/59, 46/60, 46/66, 46/67, 46/72, 46/73, 49/1, 50/1, 61/8, 61/16, 61/36, 61/46, 61/47, 61/78, 61/102, 61/123, 62, 76/1, 77/1, 77/3, 79/1, 79/5, 81/20, 81/25, 82/5, 82/9, 82/10, 82/11, 82/12, 82/14, 85/3, 85/8, 105/23, 105/42, 105/78, 105/102, 105/1, 110/1, 111, 114, 116/1, 118/1, 120/1, 121/8, 141/3; 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, Skigebiet, Grundstück Nr. 104/18, 105 Perimeter Burdag. Das geplante Wasserversorgungsnetz wird durch eine Wasserversorgung in Warchały versorgt. Die „Cinths“ sind für das Wasserwerk von Warchały im Bereich des Grundstücks Nr. 23/2 von Warchala, Silkwabno konzipiert. Das Dorf Ski befindet sich in einem Ballungsraum, das gescannt ist. Derzeit haben die Bewohner von Nart ein Kanalisationsnetz gebaut, und sie nehmen Wasser aus den Tiefseebrunnen. Der Bau von Tiefseebrunnen durch Bewohner, Sommer, Pensionen und Hotels im Dorf Narty führt dazu, dass der See Świętajno trocken wird. Die Durchführung des Projekts wird den Einsatz von Tiefseebrunnen verringern und zur Verbesserung der Wasserverhältnisse des Sees Świętajno beitragen. 80 Personen werden an das neu errichtete Wasserversorgungsnetz angeschlossen. Das Projekt steht im Einklang mit den Annahmen des SzOOP ROP WiM 2014-2020 – einem spezifischen Ziel – besser behandeltes Abwasser und bessere Wasserqualität durch den Bau eines neuen Wasserversorgungsnetzes für Anwohner, Touristen, Ferienzentren und Hotels in Narty. Klägerin – Gemeinde Silkwabno. Zur Durchführung des Projekts wurde eine Projektdurchführungseinheit eingerichtet (Beschluss Nr. 22/19 vom 15. März 2019, Bürgermeister der Gemeinde Jedwabno). (German)
    8 December 2021
    0 references
    De aanleg van een waterleidingnet met een lengte van 8,59 km is gepland voor het dorp Narty: Perceel nr.: 23/2, Warchala gebied, perceel nr.: 15, 18/38, 18/42, 18/52, 18/54, 20/10, 20/17, 20/22, 20/23, 20/26, 25/1, 26/5, 26/6, 26/8, 26/9, 27, 28, 29, 30, 31, 32/1, 34, 35, 36/1, 36/4, 37, 38, 39, 40/3, 41/7, 41/9, 41/13, 41/16, 41/45, 41/70, 41/71, 41/72, 43/18, 46/8, 46/21, 46/37, 46/38, 46/59, 46/60, 46/66, 46/67, 46/72, 46/73, 49/1, 50/1, 61/8, 61/16, 61/36, 61/46, 61/47, 61/78, 61/102, 61/123, 62, 76/1, 77/1, 77/3, 79/1, 79/5, 81/20, 81/25, 82/5, 82/9, 82/10, 82/11, 82/12, 82/14, 85/3, 85/8, 105/23, 105/42, 105/78, 105/102, 105/115, 110/1, 111, 114, 116/1, 118/1, 120/1, 121/8, 141/3; 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, Skigebied, perceel nr. 104/18, 105 omtrek Burdag. Het geplande waterleidingnet zal worden aangedreven door een watervoorziening in Warchały. De „cinths” zijn ontworpen voor de waterwerken van Warchały op het gebied van perceel nr. 23/2 van Warchala, Silkwabno. Het dorp Ski is gelegen in een agglomeratie, die wordt gescand. Op dit moment hebben de inwoners van Nart een rioleringsnetwerk aangelegd en nemen ze water uit de diepzeeputten. De bouw van diepzeeputten door bewoners, zomers, pensions en hotels in het dorp Narty zorgt ervoor dat het meer Świętajno droogt. De uitvoering van het project zal het gebruik van diepzeeputten verminderen en bijdragen tot de verbetering van de waterverhoudingen van het meer Świętajno. 80 mensen zullen worden aangesloten op het nieuw aangelegde waterleidingnet. Het project is in overeenstemming met de veronderstellingen in het SzOOP ROP WiM 2014-2020 — een specifieke doelstelling — meer gezuiverd afvalwater en een betere waterkwaliteit door de aanleg van een nieuw watervoorzieningsnetwerk voor bewoners, toeristen, vakantiecentra en hotels in Narty. Verzoekster — gemeente Silkwabno. Om het project uit te voeren werd een projectuitvoeringseenheid opgericht (besluit nr. 22/19 van 15 maart 2019, burgemeester van de gemeente Jedwabno). (Dutch)
    17 December 2021
    0 references
    La costruzione di una rete di approvvigionamento idrico con una lunghezza di 8,59 km è prevista per il villaggio di Narty: Grafico n.: 23/2, zona di Warchala, lotto n.: 15, 18/38, 18/42, 18/52, 18/54, 20/10, 20/17, 20/22, 20/23, 20/26, 25/1, 26/5, 26/6, 26/8, 26/9, 27, 28, 29, 30, 31, 32/1, 34, 35, 36/1, 36/4, 37, 38, 39, 40/3, 41/7, 41/9, 41/13, 41/16, 41/45, 41/70, 41/71, 41/72, 43/18, 46/8, 46/21, 46/37, 46/38, 46/59, 46/60, 46/66, 46/67, 46/72, 46/73, 49/1, 50/1, 61/8, 61/16, 61/36, 61/46, 61/47, 61/78, 61/102, 61/123, 62, 76/1, 77/1, 77/3, 79/1, 79/5, 81/20, 81/25, 82/5, 82/9, 82/10, 82/11, 82/12, 82/14, 85/3, 85/8, 105/23, 105/42, 105/78, 105/102, 105/115, 110/1, 111, 114, 116/1, 118/1, 120/1, 121/8, 141/3; 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, Area sciistica, terreno n. 104/18, 105 perimetrale Burdag. La rete di approvvigionamento idrico prevista sarà alimentata da un approvvigionamento idrico situato a Warchały. I "cinths" sono progettati per le acquedotto di Warchały nella zona del terreno n. 23/2 di Warchala, Silkwabno. Il villaggio di Ski è situato in un agglomerato, che è scansionato. Attualmente, gli abitanti di Nart hanno una rete fognaria costruita, e prendono l'acqua dai pozzi di acque profonde. La costruzione di pozzi di acque profonde da parte di residenti, estati, pensioni e alberghi nel villaggio di Narty fa asciugare il lago Świętajno. L'attuazione del progetto ridurrà l'uso di pozzi di acque profonde e contribuirà a migliorare le relazioni idriche del lago di Świętajno. 80 persone saranno collegate alla rete di approvvigionamento idrico di nuova costruzione. Il progetto è in linea con le ipotesi del POR WiM 2014-2020 — obiettivo specifico — più trattate e di migliore qualità dell'acqua attraverso la costruzione di una nuova rete di approvvigionamento idrico per residenti, turisti, centri turistici e alberghi a Narty. Ricorrente — Comune di Silkwabno. Per l'attuazione del progetto è stata istituita un'unità di attuazione del progetto (ordinanza n. 22/19 del 15 marzo 2019, sindaco del comune di Jedwabno). (Italian)
    15 January 2022
    0 references
    La construcción de una red de abastecimiento de agua con una longitud de 8,59 km está prevista para el pueblo de Narty: Parcela N.º: 23/2, área de Warchala, parcela n.º: 15, 18/38, 18/42, 18/52, 18/54, 20/10, 20/17, 20/22, 20/23, 20/26, 25/1, 26/5, 26/6, 26/8, 26/9, 27, 28, 29, 30, 31, 32/1, 34, 35, 36/1, 36/4, 37, 38, 39, 40/3, 41/7, 41/9, 41/13, 41/16, 41/45, 41/70, 41/71, 41/72, 43/18, 46/8, 46/21, 46/37, 46/38, 46/59, 46/60, 46/66, 46/67, 46/72, 46/73, 49/1, 50/1, 61/8, 61/16, 61/36, 61/46, 61/47, 61/78, 61/102, 61/123, 62, 76/1, 77/1, 77/3, 79/1, 79/5, 81/20, 81/25, 82/5, 82/9, 82/10, 82/11, 82/12, 82/14, 85/3, 85/8, 105/23, 105/42, 105/78, 105/102, 105/115, 110/1, 111, 114, 116/1, 118/1, 120/1, 121/8, 141/3; 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, Zona de esquí, parcela No. 104/18, 105 perímetro Burdag. La red de suministro de agua prevista será alimentada por un suministro de agua situado en Warchały. Los «cintos» están diseñados para las obras de agua de Warchały en el área de la parcela n.º 23/2 de Warchala, Silkwabno. El pueblo de Ski está situado en una aglomeración, que se escanea. En la actualidad, los habitantes de Nart tienen una red de alcantarillado construida, y toman agua de los pozos de aguas profundas. La construcción de pozos de aguas profundas por residentes, veranos, casas de huéspedes y hoteles en el pueblo de Narty hace que el lago Świętajno se seque. La ejecución del proyecto reducirá el uso de pozos de aguas profundas y contribuirá a mejorar las relaciones hídricas del lago Świętajno. 80 personas estarán conectadas a la red de suministro de agua de nueva construcción. El proyecto está en consonancia con los supuestos establecidos en el SzOOP ROP WiM 2014-2020 -un objetivo específico- de aguas residuales más tratadas y mejor calidad del agua mediante la construcción de una nueva red de suministro de agua para residentes, turistas, centros de vacaciones y hoteles en Narty. Demandante — Municipio de Silkwabno. Con el fin de ejecutar el proyecto, se creó una unidad de ejecución del proyecto (Orden n.º 22/19, de 15 de marzo de 2019, alcalde del municipio de Jedwabno). (Spanish)
    18 January 2022
    0 references
    Det er designet til at bygge et 8,59 km langt vandforsyningsnet til byen Narty: Område nr.: 23/2, WarchaÅa-regionen, område nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skiområde, område nr.: 104/18, 105, Burdig. Det planlagte vandforsyningssystem vil blive drevet af vandforsyning beliggende i WarchaÅy. Sektionerne er designet i vandværker WarchaÅy i området af plot nr. 23/2 WarchaÅa, gm. Jedwabno. Landsbyen Narty ligger i byområdet, som scannes. På nuværende tidspunkt har Nart beboere bygget et kloaknet, og de trækker vand fra dybvandsbrønde. Opførelsen af dybe brønde af beboere, sommermænd, pensionater og hoteller i landsbyen Narty får søen Swiejno til at tørre op. Gennemførelsen af projektet vil reducere brugen af dybvandsbrønde og bidrage til at forbedre vandforbindelserne i Åwijnosøen. 80 personer vil blive tilsluttet det nybyggede vandforsyningsnet. Projektet passer ind i antagelserne i SzOOP RPO WiM 2014-2020 â EUR et specifikt mål â EUR mere spildevandsrensning og bedre vandkvalitet gennem opførelse af et nyt vandforsyningsnet for beboere, turister, resorts og hoteller i Narty. Ansøger âEUR kommune Jedwabno. For at gennemføre projektet blev der oprettet en projektgennemførelsesenhed (forordning nr. 22/19 af 15.3.2019. (Danish)
    2 July 2022
    0 references
    Έχει σχεδιαστεί για την κατασκευή ενός δικτύου ύδρευσης μήκους 8,59 km για την πόλη Narty: Οικόπεδα αριθ.: 23/2, περιοχή WarchaÅa, οικόπεδα αριθ.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, χιονοδρομική περιοχή, οικόπεδα αρ.: 104/18, 105, Burdig. Το προγραμματισμένο σύστημα παροχής νερού θα τροφοδοτείται από την παροχή νερού που βρίσκεται στο WarchaÅy. Τα â EURsectionsâ EUR έχουν σχεδιαστεί στα έργα ύδρευσης του WarchaÅy στην περιοχή του οικοπέδου αρ. 23/2 WarchaÅa, gm. Jedwabno. Το χωριό Narty βρίσκεται στον οικισμό, ο οποίος σαρώνεται. Επί του παρόντος, οι κάτοικοι Nart έχουν κατασκευάσει ένα δίκτυο αποχέτευσης, και αντλούν νερό από πηγάδια βαθέων υδάτων. Η κατασκευή βαθέων πηγαδιών από κατοίκους, καλοκαιρινούς άνδρες, ξενώνες και ξενοδοχεία στο χωριό Narty προκαλεί την ξήρανση της λίμνης Swiejno. Η υλοποίηση του έργου θα μειώσει τη χρήση φρεάτων βαθέων υδάτων και θα συμβάλει στη βελτίωση των σχέσεων στον τομέα των υδάτων στη λίμνη Åwijno. 80 άτομα θα συνδεθούν με το νεόδμητο δίκτυο ύδρευσης. Το έργο ταιριάζει με τις παραδοχές που ορίζονται στο SzOOP RPO WiM 2014-2020 â EUR ένα ειδικό στόχο â EUR περισσότερη επεξεργασία λυμάτων και καλύτερη ποιότητα του νερού μέσω της κατασκευής ενός νέου δικτύου ύδρευσης για τους κατοίκους, τουρίστες, θέρετρα και ξενοδοχεία στο Narty. Αιτών â EUR Δήμος του Jedwabno. Για την υλοποίηση του έργου δημιουργήθηκε μονάδα υλοποίησης έργου (Κανονισμός αριθ. 22/19 της 15.3.2019. (Greek)
    2 July 2022
    0 references
    Dizajniran je za izgradnju 8,59 km duge vodovodne mreže za grad Narty: Zemljište br.: 23/2, regija WarchaÅa, br. parcela: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skijalište, parcele br.: 104/18, 105, Burdig. Planirani vodoopskrbni sustav bit će napajan vodom koja se nalazi u WarchaÅyu. âEURsectionsâEUR su dizajnirani u vodovodima WarchaÅy u području parcele br. 23/2 WarchaÅa, gm. Jedwabno. Selo Narty nalazi se u aglomeraciji, koja je skenirana. Trenutno su stanovnici Narta izgradili kanalizacijsku mrežu i crpe vodu iz dubokih bunara. Izgradnja dubokih bunara od strane stanovnika, ljetnikovaca, pansiona i hotela u selu Narty uzrokuje da se jezero Swiejno osuši. Provedbom projekta smanjit će se upotreba dubokovodnih bušotina i doprinijeti poboljšanju vodnih odnosa u jezeru Åwijno. Na novoizgrađenu vodoopskrbnu mrežu bit će priključeno 80 osoba. Projekt se uklapa u pretpostavke navedene u SzOOP RPO WiM 2014 – 2020 â EUR poseban cilj â EUR više pročišćavanje otpadnih voda i bolju kvalitetu vode kroz izgradnju nove vodoopskrbne mreže za stanovnike, turiste, odmarališta i hotele u Narty. Tužitelj Općina Jedwabno. Za provedbu projekta osnovana je provedbena jedinica (Uredba br. 22/19 od 15.3.2019.). (Croatian)
    2 July 2022
    0 references
    Acesta este conceput pentru a construi o rețea de alimentare cu apă cu o lungime de 8,59 km pentru orașul Narty: Parcelele nr.: 23/2, regiunea WarchaÅa, parcele nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, zonă de schi, parcele nr.: 104/18, 105, Burdig. Sistemul planificat de alimentare cu apă va fi alimentat de alimentare cu apă situat în WarchaÅy. Secțiunile sunt proiectate în uzinele de apă din WarchaÅy în zona de teren nr. 23/2 WarchaÅa, gm. Jedwabno. Satul Narty este situat în aglomerarea care este scanată. În prezent, locuitorii Nart au construit o rețea de canalizare, și ei extrag apă din puțurile de adâncime. Construcția de puțuri adânci de către rezidenți, oameni de vară, case de oaspeți și hoteluri din satul Narty face ca lacul Swiejno să se usuce. Punerea în aplicare a proiectului va reduce utilizarea puțurilor de adâncime și va contribui la îmbunătățirea relațiilor cu apa din lacul Åwijno. 80 de persoane vor fi conectate la rețeaua de alimentare cu apă nou construită. Proiectul se încadrează în ipotezele stabilite în SzOOP RPO WiM 2014-2020 â EUR un obiectiv specific â EUR mai multe epurare a apelor uzate și o mai bună calitate a apei prin construirea unei noi rețele de alimentare cu apă pentru rezidenți, turiști, stațiuni și hoteluri în Narty. Reclamantă municipalitatea Jedwabno. Pentru implementarea proiectului a fost înființată o unitate de implementare a proiectului (Regulamentul nr. 22/19 din 15.03.2019. (Romanian)
    2 July 2022
    0 references
    Je určený na vybudovanie 8,59 km dlhej vodovodnej siete pre mesto Narty: Pozemky č.: 23/2, oblasť WarchaÅa, pozemky č.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, lyžiarsky areál, parcely č.: 104/18, 105, Burdig. Plánovaný systém zásobovania vodou bude napájaný prívodom vody nachádzajúcim sa v WarchaÅy. Oddiely EUR sú navrhnuté vo vodárni WarchaÅy v oblasti pozemku č. 23/2 WarchaÅa, gm. Jedwabno. Obec Narty sa nachádza v aglomerácii, ktorá je skenovaná. V súčasnosti obyvatelia Nart vybudovali kanalizačnú sieť a čerpajú vodu z hlbinných studní. Výstavba hlbokých studní obyvateľov, letákov, penziónov a hotelov v obci Narty spôsobuje vyschnutie jazera Swiejno. Realizácia projektu zníži využívanie hlbinných studní a prispeje k zlepšeniu vzťahov s vodou v Åwijnskom jazere. K novo vybudovanej vodovodnej sieti bude pripojených 80 osôb. Projekt zapadá do predpokladov stanovených v SzOOP RPO WiM 2014 – 2020 â EUR špecifický cieľ â EUR viac čistenie odpadových vôd a lepšiu kvalitu vody prostredníctvom výstavby novej vodovodnej siete pre obyvateľov, turistov, strediská a hotely v Narty. Žalobkyňa â EUR Obec Jedwabno. Na realizáciu projektu bola zriadená jednotka realizácie projektu (nariadenie č. 22/19 z 15. 3. 2019. (Slovak)
    2 July 2022
    0 references
    Huwa mfassal biex jibni netwerk tal-provvista tal-ilma twil 8.59 km għall-belt ta’ Narty: Il-plottijiet nru.: 23/2, ir-reġjun ta’ WarchaÅa, il-plottijiet nru.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, iż-żona tal-iskijjar, il-plottijiet nru.: 104/18, 105, Burdig. Is-sistema ppjanata tal-provvista tal-ilma se tkun imħaddma bil-provvista tal-ilma li tinsab fi WarchaÅy. Il-EUR â EUR œEURsectionsâ huma mfassla fil-waterworks tal WarchaÅy fil-qasam tal-plott nru 23/2 WarchaÅa, gm. Jedwabno. Il-villaġġ ta’ Narty jinsab fl-agglomerazzjoni, li hija skennjata. Fil-preżent, ir-residenti ta’ Nart bnew netwerk tad-drenaġġ, u jiġbdu l-ilma minn bjar tal-baħar fond. Il-kostruzzjoni ta ‘bjar fil-fond minn residenti, summermen, guesthouses u lukandi fir-raħal ta’ Narty tikkawża l-Lag Swiejno jinxef. L-implimentazzjoni tal-proġett ser tnaqqas l-użu tal-bjar tal-baħar fond u tikkontribwixxi għat-titjib tar-relazzjonijiet tal-ilma fil-Lag Åwijno. 80 persuna se jkunu konnessi man-netwerk tal-provvista tal-ilma mibni ġdid. Il-proġett jidħol fis-suppożizzjonijiet stabbiliti fil-SzOOP RPO WiM 2014–2020 â EUR â EUR objettiv speċifiku trattament tad-drenaġġ aktar u kwalità aħjar ta ‘ilma permezz tal-kostruzzjoni ta’ netwerk ġdid provvista ta ‘ilma għar-residenti, turisti, resorts u lukandi fil Narty. Applikant â EUR TM Muniċipalità ta ‘Jedwabno. Sabiex jiġi implimentat il-proġett, ġiet stabbilita unità għall-implimentazzjoni tal-proġett (ir-Regolament Nru 22/19 tal-15.03.2019. (Maltese)
    2 July 2022
    0 references
    Ele foi projetado para construir uma rede de abastecimento de água de 8,59 km de comprimento para a cidade de Narty: N.º das parcelas: 23/2, região de WarchaÅa, parcelas n.º: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, área de esqui, parcelas n.º: 104/18, 105, Burdig. O sistema de abastecimento de água planejado será alimentado por abastecimento de água localizado em WarchaÅy. As seções são projetadas nas usinas de água de WarchaÅy na área do terreno n.º 23/2 WarchaÅa, gm. Jedwabno. A aldeia de Narty está localizada na aglomeração, que é escaneada. Atualmente, os moradores de Nart construíram uma rede de esgotos e tiram água de poços de águas profundas. A construção de poços profundos por residentes, Summermen, pousadas e hotéis na aldeia de Narty faz com que o lago Swiejno seque. A execução do projeto reduzirá a utilização de poços de profundidade e contribuirá para melhorar as relações com a água no lago de Åwijno. 80 pessoas serão conectadas à rede de abastecimento de água recém-construída. O projeto enquadra-se nos pressupostos estabelecidos no SzOOP RPO WiM 2014-2020 âEUR um objetivo específico âEUR mais tratamento de esgotos e melhor qualidade da água através da construção de uma nova rede de abastecimento de água para residentes, turistas, resorts e hotéis em Narty. Candidato âEUR Município de Jedwabno. Para a execução do projeto, foi criada uma unidade de execução do projeto (Regulamento n.º 22/19 de 15.3.2019. (Portuguese)
    2 July 2022
    0 references
    Se on suunniteltu rakentamaan 8,59 km pitkä vesijohtoverkosto kaupungin Narty: Tontit nro: 23/2, WarchaÅan alue, tontit nro: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, hiihtoalue, tontit nro: 104/18, 105, Burdig. Suunniteltu vesihuoltojärjestelmä toimii WarchaÅyn vesihuollon avulla. Osat on suunniteltu WarchaÅyn vesilaitoksiin tontin nro 23/2 WarchaÅa, gm. Jedwabno. Nartyn kylä sijaitsee taajamassa, joka on skannattu. Tällä hetkellä Nartin asukkaat ovat rakentaneet viemäriverkoston ja vetäneet vettä syvänmeren kaivoista. Asukkaiden, kesämiesten, majataloiden ja hotellien rakentaminen Nartyn kylään aiheuttaa Swiejno-järven kuivumisen. Hankkeen toteuttaminen vähentää syvänmeren kaivojen käyttöä ja parantaa vesisuhteita Åwijno-järvellä. 80 ihmistä kytketään hiljattain rakennettuun vesihuoltoverkkoon. Hanke sopii oletuksiin, jotka on esitetty SzOOP RPO WiM 2014–2020: ssä, erityistavoitteeksi â EUR enemmän jäteveden käsittelyä ja parempaa veden laatua rakentamalla uusi vesihuoltoverkosto asukkaille, matkailijoille, lomakohteille ja hotelleille Nartyssa. Kantaja Jedwabnon kunta. Hankkeen toteuttamiseksi perustettiin hankkeen täytäntöönpanoyksikkö (asetus N:o 22/19, 15.3.2019). (Finnish)
    2 July 2022
    0 references
    Zasnovan je za izgradnjo 8,59 km dolgega vodovodnega omrežja za mesto Narty: Št. parcel: 23/2, regija Warchaža, št. parcel: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, smučišče, št. parcel: 104/18, 105, Burdig. Načrtovani sistem oskrbe z vodo se bo napajal z vodo, ki se nahaja v WarchaÅy. The EURsectionsâ EUR so zasnovani v vodovodih WarchaÅy na območju parcele št. 23/2 WarchaÅa, gm. Jedwabno. Vas Narty se nahaja v aglomeraciji, ki je skenirana. Trenutno so prebivalci Narta zgradili kanalizacijsko omrežje in črpajo vodo iz globokomorskih vodnjakov. Gradnja globokih vodnjakov, ki jih prebivalci, poletniki, gostišča in hoteli v vasi Narty povzroči, da se jezero Swiejno posuši. Izvajanje projekta bo zmanjšalo uporabo globokomorskih vodnjakov in prispevalo k izboljšanju odnosov z vodo na jezeru Åwijno. 80 ljudi bo priključenih na novo zgrajeno omrežje za oskrbo z vodo. Projekt se ujema s predpostavkami, določenimi v SzOOP RPO WiM 2014–2020 â EUR â EUR poseben cilj â EUR več čiščenje odplak in boljšo kakovost vode z izgradnjo novega vodovodnega omrežja za prebivalce, turiste, naselja in hoteli v Narty. Tožeča stranka: Občina Jedwabno. Za izvedbo projekta je bila ustanovljena enota za izvajanje projekta (Uredba št. 22/19 z dne 15. 3. 2019. (Slovenian)
    2 July 2022
    0 references
    Je určen k vybudování 8,59 km dlouhé vodovodní sítě pro město Narty: Pozemky č.: 23/2, Warchařský kraj, parcely č.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, lyžařský areál, pozemky č.: 104/18, 105, Burdig. Plánovaný systém zásobování vodou bude napájen vodním zdrojem nacházejícím se ve WarchaÅy. â EUR ¢ sekce jsou navrženy ve vodárnách WarchaÅy v oblasti pozemku č. 23/2 WarchaÅa, gm. Jedwabno. Obec Narty se nachází v aglomeraci, která je skenována. V současné době obyvatelé Nart vybudovali kanalizační síť a čerpá vodu z hlubinných studní. Výstavba hlubokých studní obyvateli, letáři, penziony a hotely v obci Narty způsobí, že jezero Swiejno vyschne. Realizace projektu sníží využívání hlubinných vrtů a přispěje ke zlepšení vodohospodářských vztahů v jezeře Åwijno. K nově vybudované vodovodní síti bude připojeno 80 osob. Projekt zapadá do předpokladů stanovených v SzOOP RPO WiM 2014–2020 â EUR specifický cíl › více čištění odpadních vod a lepší kvalitu vody prostřednictvím výstavby nové vodovodní sítě pro obyvatele, turisty, střediska a hotely v Narty. Žalobkyně: obec Jedwabno. Za účelem realizace projektu byla zřízena prováděcí jednotka projektu (nařízení č. 22/19 ze dne 15. března 2019). (Czech)
    2 July 2022
    0 references
    Jis skirtas statyti 8,59 km ilgio vandens tiekimo tinklą Narty miestui: Apskaitos barelių nr.: 23/2, WarchaÅa sritis, sklypai nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, slidinėjimo plotas, sklypai Nr.: 104/18, 105, Burdigas. Planuojama vandens tiekimo sistema bus maitinama vandentiekio, esančio Warchajuje. â EURsectionsâ EUR yra suprojektuoti WarchaÅy vandentiekio srityje sklype Nr. 23/2 WarchaÅa, gm. Jedwabno. Narty kaimas yra aglomeracijoje, kuri yra nuskaitoma. Šiuo metu Nart gyventojai pastatė nuotekų tinklą, ir jie gauna vandenį iš giliavandenių šulinių. Dėl gyventojų, vasarnamių, svečių namų ir viešbučių giluminių šulinių statybos Narty kaime Swiejno ežeras išdžiūsta. Projekto įgyvendinimas sumažins giliavandenių šulinių naudojimą ir prisidės prie vandens santykių gerinimo Åwijno ežere. 80 žmonių bus prijungti prie naujai pastatyto vandens tiekimo tinklo. Projektas atitinka prielaidas, išdėstytas SzOOP RPO WiM 2014–2020 â EUR konkretus tikslas â daugiau nuotekų valymo ir geresnės kokybės vandens per naują vandens tiekimo tinklą gyventojams, turistams, kurortams ir viešbučiams Narty statybos. Pareiškėja ā EUR Jedwabno savivaldybė. Projektui įgyvendinti buvo įsteigtas projekto įgyvendinimo skyrius (2019 m. kovo 15 d. Reglamentas Nr. 22/19). (Lithuanian)
    2 July 2022
    0 references
    Tas ir paredzēts, lai izveidotu 8,59 km garu ūdensapgādes tīklu Narty pilsētai: Zemes gabalu Nr.: 23/2, WarchaÅa reģions, zemesgabali Nr.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, slēpošanas zona, zemes gabalu Nr.: 104/18, 105, Burdig. Plānotā ūdensapgādes sistēma tiks darbināta ar ūdens piegādi, kas atrodas WarchaÅy. â EURsectionsâ EUR ir paredzēti ūdensdarbiem WarchaÅy jomā zemes gabala Nr. 23/2 WarchaÅa, gm. Jedwabno. Narty ciemats atrodas aglomerācijā, kas tiek skenēta. Pašlaik Nart iedzīvotāji ir izveidojuši kanalizācijas tīklu, un viņi iegūst ūdeni no dziļūdens akām. Dziļu aku būvniecība, ko veic iedzīvotāji, vasarnieki, viesu nami un viesnīcas Narty ciematā, liek Swiejno ezeram nožūt. Projekta īstenošana samazinās dziļūdens aku izmantošanu un palīdzēs uzlabot ūdens attiecības Ūvijno ezerā. 80 cilvēki tiks pieslēgti jaunceltajam ūdensapgādes tīklam. Projekts atbilst pieņēmumiem, kas izklāstīti SzOOP RPO WiM 2014–2020 â EUR konkrētu mērķi â EUR vairāk notekūdeņu attīrīšanas un labāku ūdens kvalitāti, veidojot jaunu ūdensapgādes tīklu iedzīvotājiem, tūristiem, kūrortiem un viesnīcām Narty. Pieteikuma iesniedzējs Jedwabno pašvaldība. Projekta īstenošanai tika izveidota projekta īstenošanas struktūrvienība (15.03.2019. noteikumi Nr. 22/19. (Latvian)
    2 July 2022
    0 references
    Проектирана е за изграждане на водоснабдителна мрежа с дължина 8,59 км за град Нарти: Парцели №: 23/2, област WarchaÅa, парцел №: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ски зона, парцели №: 104/18, 105, Бърдиг. Планираната система за водоснабдяване ще се захранва от водоснабдяване, разположено в WarchaÅy. â EURsectionsâ EUR са проектирани във водните заводи на WarchaÅy в района на парцел № 23/2 WarchaÅa, gm. Jedwabno. Село Нарти се намира в агломерацията, която се сканира. В момента жителите на Нарт са изградили канализационна мрежа и те черпят вода от дълбоководни кладенци. Изграждането на дълбоки кладенци от обитатели, летовници, къщи за гости и хотели в село Нарти води до изсъхване на езерото Swiejno. Изпълнението на проекта ще намали използването на дълбоководни кладенци и ще допринесе за подобряване на водните отношения в езерото Åwijno. 80 души ще бъдат свързани към новоизградената водоснабдителна мрежа. Проектът се вписва в допусканията, изложени в SzOOP RPO WiM 2014—2020 г. — конкретна цел — повече пречистване на отпадъчните води и по-добро качество на водата чрез изграждането на нова водоснабдителна мрежа за жителите, туристите, курортите и хотелите в Нарти. Жалбоподател в община Джедвабно. За изпълнението на проекта е създадено звено за изпълнение на проекта (Наредба № 22/19 от 15.03.2019 г.). (Bulgarian)
    2 July 2022
    0 references
    Úgy tervezték, hogy építsen egy 8,59 km hosszú vízellátó hálózatot Narty város számára: Telkek száma: 23/2, WarchaÅa régió, telkek száma: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, síterület, telkek száma: 104/18, 105, Burdig. A tervezett vízellátó rendszert a WarchaÅyben található vízellátás biztosítja. A szakaszok a Warchay vízműveiben vannak kialakítva a 23/2 WarchaÅa, gm. Jedwabno telek területén. Narty falu az agglomerációban található, amely szkennelt. Jelenleg a Nart lakói szennyvízhálózatot építettek, és mélyvízi kutakból vonnak vizet. A lakók, a nyaralók, a vendégházak és a szállodák mély kutak építése Narty faluban a Swiejno tó kiszáradását okozza. A projekt végrehajtása csökkenti a mélyvízi kutak használatát, és hozzájárul az Åwijno-tó vízügyi kapcsolatainak javításához. 80 fő csatlakozik az újonnan épített vízellátó hálózathoz. A projekt illeszkedik a SzOOP RPO WiM 2014–2020-as időszakra vonatkozó feltevéseihez, amely egy új vízellátó hálózat kiépítésével több szennyvízkezelést és jobb vízminőséget határoz meg a Narty-ban lakók, turisták, üdülőhelyek és szállodák számára. Felperes Jedwabno önkormányzata. A projekt végrehajtása érdekében létrehoztak egy projektvégrehajtási egységet (2019. március 15-i 22/19 rendelet). (Hungarian)
    2 July 2022
    0 references
    Tá sé deartha chun gréasán soláthair uisce 8.59 km a thógáil do bhaile Narty: Ceapacha uimh.: 23/2, réigiún WarchaÅa, ceapacha uimh.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, limistéar sciála, ceapacha uimh.: 104/18, 105, Burdig. Beidh an córas soláthar uisce atá beartaithe a thiomáint ag soláthar uisce atá suite i WarchaÅy. An EUR â EURsectionsâ EURTá siad deartha in oibreacha uisce WarchaÅy i réimse an plota uimh. 23/2 WarchaÅa, gm. Jedwabno. Tá sráidbhaile Narty suite sa cheirtleán, atá scanta. Faoi láthair, tá cónaitheoirí Nart tar éis líonra séarachais a thógáil, agus tarraingíonn siad uisce ó thoibreacha domhainuisce. Is é an tógáil toibreacha domhain ag cónaitheoirí, summermen, tithe aíochta agus óstáin i sráidbhaile Narty cúiseanna an loch Swiejno a thriomú suas. Laghdóidh cur chun feidhme an tionscadail an úsáid a bhaintear as toibreacha domhainuisce agus cuideoidh sé le feabhas a chur ar chaidreamh uisce i Loch Åwijno. Beidh 80 duine ceangailte leis an líonra soláthair uisce nuathógtha. Luíonn an tionscadal isteach na boinn tuisceana atá leagtha amach sa SzOOP RPO WiM 2014-2020 â EUR â EUR â ar leith â EUR â EUR â EUR â EUR â ar leith cóireála séarachais agus ar chaighdeán níos fearr uisce trí thógáil líonra soláthair uisce nua do chónaitheoirí, turasóirí, ionaid saoire agus óstáin i Narty. Iarratasóir â EUR Bardas na Jedwabno. Chun an tionscadal a chur chun feidhme, bunaíodh aonad cur chun feidhme tionscadail (Rialachán Uimh. 22/19 an 15.03.2019. (Irish)
    2 July 2022
    0 references
    Det är utformat för att bygga ett 8,59 km långt vattenförsörjningsnät för staden Narty: Tomter nr: 23/2, WarchaÅa-regionen, tomter nr: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, skidområde, tomt nr: 104/18, 105, Burdig. Det planerade vattenförsörjningssystemet kommer att drivas av vattenförsörjning i WarchaÅy. Avsnitten är utformade i vattenverken i WarchaÅy i området tomt nr 23/2 WarchaÅa, gm. Jedwabno. Byn Narty ligger i tätorten, som är skannad. För närvarande har Narts invånare byggt ett avloppsnät, och de hämtar vatten från djupa vattenbrunnar. Byggandet av djupa brunnar av invånare, somrar, pensionat och hotell i byn Narty orsakar sjön Swiejno att torka upp. Genomförandet av projektet kommer att minska användningen av djuphavsbrunnar och bidra till att förbättra vattenrelationerna i sjön Åwijno. 80 personer kommer att anslutas till det nybyggda vattenförsörjningsnätet. Projektet passar in i antagandena i SzOOP RPO WiM 2014–2020 â EUR ett specifikt mål â EUR mer avloppsrening och bättre vattenkvalitet genom byggandet av ett nytt vattenförsörjningsnät för invånare, turister, orter och hotell i Narty. Sökande â EUR kommun Jedwabno. För att genomföra projektet inrättades en genomförandeenhet för projektet (föreskrifter nr 22/19 av den 15 mars 2019). (Swedish)
    2 July 2022
    0 references
    Selle eesmärk on ehitada Narty linnale 8,59 km pikkune veevarustusvõrk: Proovitükid nr: 23/2, WarchaÅa piirkond, krundid nr: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, suusaala, krundid nr: 104/18, 105, Burdig. Planeeritud veevarustussüsteemi toidetakse veevarustus asub WarchaÅy. â EUR Sektsioonid on kavandatud veetööd WarchaÅy piirkonnas krundi nr 23/2 WarchaÅa, gm. Jedwabno. Narty küla asub linnastus, mis on skaneeritud. Praegu on Narti elanikud ehitanud kanalisatsioonivõrgu ja nad tõmbavad vett süvaveekaevudest. Narty küla elanike, suvilate, külalistemajade ja hotellide sügavate kaevude ehitamine põhjustab Swiejno järve kuivamise. Projekti rakendamine vähendab süvaveekaevude kasutamist ja aitab parandada veesuhteid Åwijno järves. Uue veevarustusvõrguga ühendatakse 80 inimest. Projekt sobib eeldustega, mis on sätestatud SzOOP RPO WiM 2014–2020 erieesmärgiks âEUR rohkem reoveepuhastust ja vee kvaliteedi parandamist, ehitades Narty elanikele, turistidele, kuurortidele ja hotellidele uue veevarustusvõrgu. Taotleja Jedwabno vald. Projekti elluviimiseks loodi projekti rakendamise üksus (15. märtsi 2019. aasta määrus nr 22/19). (Estonian)
    2 July 2022
    0 references

    Identifiers

    RPWM.05.02.00-28-0006/19
    0 references