Project Q3950306 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Complex building energy development in Mezőtúr |
Project Q3950306 in Hungary |
Statements
117,705,413.45 forint
0 references
138,476,957.0 forint
0 references
85.0 percent
0 references
1 August 2017
0 references
31 August 2021
0 references
MEZŐTÚR VÁROS ÖNKORMÁNYZATA
0 references
Q3961955 (Deleted Item)
0 references
A pályázat megvalósítási helyszíne Mezőtúr, Zrínyi Miklós utca 1. szám alatt a Csoda-Vár (Zrínyi) Óvoda. Jelen pályázat célja, hogy javaslatot tegyen a Mezőtúr település fejlesztésbe bevont épületeinek komplex energetikai korszerűsítésére. Az épület és ezáltal az önkormányzat üzemeltetési költségeinek csökkentését célzó fejlesztési javaslatok: - külső falak hőszigetelése 16 cm vastag EPS hőszigetelő rendszerrel; - tetőfödém hőszigetelése 18 cm vastag EPS hőszigetelő rendszerrel; - árkádfödém hőszigetelése 22 cm vastag EPS hőszigetelő rendszerrel; - meglévő nyílászárók cseréje műanyag keretszerkezetű hőszigetelő üvegezésű ajtókra és ablakokra, fém üvegezett ajtókra, valamint polikarbonát falra; - fűtési rendszer korszerűsítése: o időjáráskövető szabályozással ellátott kondenzációs gázkazán beépítése; o lapradiátorok felszerelése termosztatikus szeleppel; - HMV rendszer korszerűsítése: o indirekt fűtésű tároló beépítése, melyet a tervezett kondenzációs gázkazán, illetve a napkollektorok együttesen látnak el; - 10 kW csatlakozási teljesítményű napelemes rendszer betelepítése; - 14 m2 abszorber felülettel rendelkező napkollektoros rendszer kiépítése. Az energetikai korszerűsítéssel elérhető energiahatékonyság növelés elsősorban az épület használóit, látogatóit szolgálná. Az energiafelhasználás csökkenés környezeti hatásterülete azonban túlmutat az épület határain és közvetve az egész ország energiaellátásának biztonságát és versenyképességét javítja, továbbá a környezeti állapot megőrzését érdemben szolgálja. Az épület valamennyi, a korszerűsítésben érintett külső határoló szerkezetének tervezett állapota úgy került meghatározásra, hogy megfeleljen a 7/2006 (V.24.) TNM rendelet hőátbocsátási tényezőkre vonatkozó költségoptimalizált követelményértékeinek. A Felhívás 3.2. pontjában szereplő esélyegyenlőségi és környezetvédelmi előírásoknak megfelel a projekt. A projektnek előrelátható klímakockázata nincs. A projektnek a vizek állapotára nincs hatása, vízjogi létesítési engedély nem szükséges. A műszaki tervdokumentáció elkészítése és a teljes projektelőkészítés a fejezetben bemutatott projekt kidolgozására vonatkozó feltételek alapján készült. Tartalmi értékelési szempontok A projekt a 1.1-1.7, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1 - 4.4, 5.1, 7.1, 7.2, 10.1-10.6 értékelési szempontok mindegyikének megfelel. A tervezett fejlesztés illeszkedik a TOP céljaihoz, szakmai indokoltság, igény és kihasználtság megfelelő. A projekt megalapozottsága megfelelő. Az esetleges kockázatok elemzésre kerültek. A projekt keretében műemlék épület fejlesztésére nem kerül sor. A fenntarthatósági kritériumoknak megfelel a projekt. A projekt kapcsolódik más OP-k projektjeihez, illetve a TOP más intézkedéseihez. A beruházás nem kirekesztő egyetlen társadalmi csoport számára sem. a pénzügyi belső megtérülési ráta (BMR) -4 % és 4 % közé esik. Az adott épületek fejlesztés előtti energiaigénye meghaladja a 150 kWh/m2a értéket. Terület-specifikus mellékletben szereplő kritériumok 1. Illeszkedés a megyei területfejlesztési programhoz és a vonatkozó indikátoraihoz A fejlesztés illeszkedik a Jász-Nagykun-Szolnok Megyei Területfejlesztési Programban rögzített célokhoz és intézkedésekhez,és intézkedés szintű kapcsolat mutatható ki, ugyanis a 13.2. intézkedés Az energiahatékonyság javítása és a megújuló energia fokozott bevonása az energiaellátásba, amely egyezik a fejlesztés célkitűzéseivel. 2. Hozzájárulás a pénzügyi egyensúly fenntartásához A fejlesztés megvalósulása hozzájárul a Kedvezményezett működési jellegű kiadásainak csökkenéséhez, és ez a kérelem benyújtásához készülő szakmai megalapozó tanulmányban részletesen bemutatásra került. A projekt keretében önállóan támogatható, illetve önállóan nem támogatható, választható tevékenységek is megvalósulnak. 3. Hozzájárulás belső területi kiegyenlítődéshez A projekt a 105/2015. Korm. rendelet szerint nem kedvezményezett településen valósul meg. A megújuló-energiaforrás hasznosításából nyert energiával ellátni kívánt középületek száma 1. 4. Hozzájárulás a munkához jutás feltételeinek javításához A fejlesztés nem teremt új munkahelyet. 5. Hozzájárulás a fejlesztések térségi hatásának erősítéséhez fejlesztés térségre gyakorolt hatása nem összetett, más projekt kapcsolatokat nem eredményez a térségben. A fejlesztés kapcsolódik térségi/ágazati programokhoz, komplex fejlesztésekhez, és ez a kérelem benyújtásához készülő szakmai megalapozó tanulmányban részletesen bemutatásra került (kapcsolat ágazati és hazai finanszírozású programokkal). A hiánypótlásban megjelölt részletezés a FAIR rendszer karakterkorlátja miatt külön dokumentumban kerül csatolásra. (Hungarian)
0 references
The venue for the implementation of the project is Mezőtúr, Zrínyi Miklós utca 1, the Csoda-Vár (Zrínyi) Kindergarten. The purpose of this tender is to propose the complex energy modernisation of the buildings of the Mezőtúr settlement involved in the development. Development proposals aimed at reducing the operating costs of the building and thus of the municipality: — thermal insulation of external walls with 16 cm thick EPS thermal insulation system; — thermal insulation of the roof ceiling with 18 cm thick EPS thermal insulation system; — the thermal insulation of an arcade slab with EPS thermal insulation system 22 cm thick; — replacement of existing doors and windows with plastic framed thermal insulation glazed doors and windows, metal glazed doors and polycarbonate walls; — modernisation of the heating system: O installation of a condensation gas boiler with weather monitoring control; O installation of sheet radiators with thermostatic valves; — Modernisation of the HMV system: O installation of an indirect heating storage facility supplied by the planned condensation gas boiler or solar collectors together; — Installation of a solar system with a connection power of 10 kW; — Installation of a solar collector system with an absorber surface of 14 m². Increasing energy efficiency through energy modernisation would primarily serve the occupants and visitors of the building. However, the environmental impact area of the reduction of energy consumption extends beyond the boundaries of the building and indirectly improves the security and competitiveness of the entire country’s energy supply and serves to preserve the state of the environment. The planned state of all external boundaries of the building affected by the renovation was determined in such a way as to comply with the cost-optimal requirements for heat transmission factors in Decree No 7/2006 of 24 May 2006. The project complies with the equal opportunities and environmental standards set out in point 3.2 of the call. The project has no foreseeable climate risk. The project has no impact on the status of the water, and no water rights permit is required. The technical design documentation and the complete project preparation were prepared on the basis of the criteria for the development of the project described in this chapter. The project meets all the evaluation criteria 1.1-1.7, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1-4.4, 5.1, 7.1, 7.2, 10.1-10.6 The planned development fits the goals of the TOP, professional justification, demand and utilisation are appropriate. The project is well founded. Potential risks have been analysed. No monument building will be developed under the project. The project meets the sustainability criteria. The project is linked to projects of other OPs and other measures of the TOP. The investment is not excluded for any social group. The financial internal rate of return (IRR) is between -4 % and 4 %. The pre-development energy demand of the buildings concerned exceeds 150 kWh/m2a. Criteria in an area-specific annex 1. Alignment with the regional development programme of the county and the relevant indicators The development is in line with the objectives and measures set out in the Jász-Nagykun-Szolnok County Regional Development Programme, and a link can be shown at measure level, as measure 13.2 Improving energy efficiency and increasing the involvement of renewable energy in energy supply, which is consistent with the objectives of the development. 2. Contribution to maintaining financial equilibrium The realisation of the development contributes to the reduction of the Beneficiary’s operational expenditure, and this has been detailed in the professional foundation study prepared for the submission of the application. Optional activities that are eligible for individual support under the project or which are not eligible on its own will also be implemented. 3. Contribution to internal territorial equilibrium Project 105/2015. According to the Government Decree, it takes place in a non-beneficiary settlement. Number of public buildings to be supplied with energy from renewable energy sources 1. 4. Contributing to improving the conditions for access to employment Development does not create new jobs. 5. Contributing to strengthening the regional impact of development on the region is not complex, other projects do not lead to links in the region. The development is related to regional/sectoral programmes and complex developments, and this has been described in detail in the technical foundation study prepared for the submission of the application (link to sectoral and domestic funded programmes). The details indicated in the defects will be attached in a separate document due to the character limitation of the FAIR system. (English)
9 February 2022
0 references
Le lieu de mise en œuvre du projet est Mezőtúr, Zrínyi Miklós utca 1, la maternelle Csoda-Vár (Zrínyi). L’objet du présent appel d’offres est de proposer la modernisation énergétique complexe des bâtiments du village de Mezőtúr impliqués dans le développement. Propositions de développement visant à réduire les coûts de fonctionnement du bâtiment et donc de la municipalité: — isolation thermique des murs extérieurs avec 16 cm d’épaisseur EPS système d’isolation thermique; — isolation thermique du plafond du toit avec 18 cm d’épaisseur EPS système d’isolation thermique; — l’isolation thermique d’une dalle d’arcade avec système d’isolation thermique EPS de 22 cm d’épaisseur; — remplacement des portes et fenêtres existantes par des portes et fenêtres à isolation thermique encadrées en plastique, des portes vitrées en métal et des murs en polycarbonate; — modernisation du système de chauffage: O l’installation d’une chaudière à gaz de condensation avec contrôle des intempéries; O installation de radiateurs en tôle avec vannes thermostatiques; — Modernisation du système HMV: O l’installation d’une installation de stockage de chaleur indirecte fournie par la chaudière à gaz à condensation prévue ou par des capteurs solaires ensemble; — Installation d’un système solaire d’une puissance de raccordement de 10 kW; — Installation d’un système de collecteur solaire avec une surface absorbante de 14 m². L’amélioration de l’efficacité énergétique par la modernisation de l’énergie servirait principalement les occupants et les visiteurs du bâtiment. Toutefois, le domaine de l’impact environnemental de la réduction de la consommation d’énergie s’étend au-delà des limites du bâtiment et améliore indirectement la sécurité et la compétitivité de l’approvisionnement énergétique de l’ensemble du pays et contribue à préserver l’état de l’environnement. L’état prévu de toutes les limites extérieures du bâtiment concerné par la rénovation a été déterminé de manière à satisfaire aux exigences optimales en termes de coûts pour les facteurs de transmission de chaleur prévues par le décret no 7/2006 du 24 mai 2006. Le projet est conforme aux normes en matière d’égalité des chances et d’environnement énoncées au point 3.2 de l’appel. Le projet ne présente aucun risque climatique prévisible. Le projet n’a pas d’incidence sur l’état de l’eau et aucun permis d’accès à l’eau n’est requis. La documentation de conception technique et la préparation complète du projet ont été préparées sur la base des critères d’élaboration du projet décrits dans le présent chapitre. Le projet répond à tous les critères d’évaluation 1.1-1,7, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1-4.4, 5.1, 7.1, 7.2, 10,1-10,6 Le développement prévu correspond aux objectifs du TOP, la justification professionnelle, la demande et l’utilisation sont appropriées. Le projet est bien fondé. Les risques potentiels ont été analysés. Aucun bâtiment monumental ne sera aménagé dans le cadre du projet. Le projet répond aux critères de durabilité. Le projet est lié aux projets d’autres PO et à d’autres mesures du POT. L’investissement n’est exclu pour aucun groupe social. Le taux de rendement interne financier (IRR) est compris entre -4 % et 4 %. La demande d’énergie avant le développement des bâtiments concernés dépasse 150 kWh/m2a. Critères d’une zone spécifique annexe 1. Alignement sur le programme de développement régional du comté de Jász-Nagykun et les indicateurs pertinents Le développement est conforme aux objectifs et aux mesures énoncés dans le programme de développement régional du comté de Jász-Nagykun-Szolnok, et un lien peut être établi au niveau de la mesure, en tant que mesure 13.2 Améliorer l’efficacité énergétique et accroître la participation des énergies renouvelables à l’approvisionnement en énergie, ce qui est conforme aux objectifs du développement. 2. Contribution au maintien de l’équilibre financier La réalisation du développement contribue à la réduction des dépenses opérationnelles du bénéficiaire, ce qui a été détaillé dans l’étude de la fondation professionnelle préparée pour la soumission de la demande. Les activités facultatives qui peuvent bénéficier d’un soutien individuel dans le cadre du projet ou qui ne sont pas éligibles en soi seront également mises en œuvre. 3. Contribution à l’équilibre territorial interne Projet 105/2015. Selon le décret gouvernemental, il s’agit d’un règlement non bénéficiaire. Nombre de bâtiments publics à approvisionner en énergie produite à partir de sources d’énergie renouvelables 1. 4. Contribuer à l’amélioration des conditions d’accès à l’emploi Le développement ne crée pas de nouveaux emplois. 5. Contribuer au renforcement de l’impact régional du développement sur la région n’est pas complexe, d’autres projets n’entraînent pas de liens dans la région. Le développement est lié à des programmes régionaux/sectoriels et à des développements complexes, et cela a été décrit en détail dans l’étude technique de base préparée pour la présen... (French)
10 February 2022
0 references
Mezőtúr, Jász-Nagykun-Szolnok
0 references
Identifiers
TOP-3.2.1-15-JN1-2016-00006