(‎Created claim: summary (P836): INTERVENTION N.1: THERMAL INSULATION OF THE OUTER WALLS. OBJECTIVE? THAT OF REDUCING LOSSES BY BRINGING THE TRANSMITTANCE AT 0,212 W/M2K, AND THE SUMMER THERMAL LOSSES, BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.02 W/M2K. THE INTERVENTION PROVIDES FOR THE COMPLETION OF ALL THE BUILDING BLOCKS OF AN EIGHT-COAT THERMAL INSULATION SYSTEM CARRIED OUT VIA SINTERED POLYSTYRENE FOAM PANEL OF THICKNESSES OF M120 WITH PLASTER MADE OF WIRED GLASS FI...)
Property / summary
 
INTERVENTION N.1: THERMAL INSULATION OF THE OUTER WALLS. OBJECTIVE? THAT OF REDUCING LOSSES BY BRINGING THE TRANSMITTANCE AT 0,212 W/M2K, AND THE SUMMER THERMAL LOSSES, BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.02 W/M2K. THE INTERVENTION PROVIDES FOR THE COMPLETION OF ALL THE BUILDING BLOCKS OF AN EIGHT-COAT THERMAL INSULATION SYSTEM CARRIED OUT VIA SINTERED POLYSTYRENE FOAM PANEL OF THICKNESSES OF M120 WITH PLASTER MADE OF WIRED GLASS FIBRE. ESSENTIAL WORK: SCAFFOLDING, INSULATION LAYER, DISASSEMBLY/DISMANTLING, NO 2: WINDOW FRAMES AND WINDOWS — INSTALLATION OF OMBREGGATURA.L? OBJECTIVE? DOES IT PROVIDE FOR THE REPLACEMENT OF ALL WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES AND HEAT-CUT WINDOWS AND DOUBLE ANTI-NOISE CHAMBER GLASS 66.2A/15/44.2, WITH A THERMAL TRANSMITTANCE OF THERMAL TRANSMITTANCE, BY REDUCING THE LOSSES BY BRINGING THE TRANSMITTANCE OF THE FIXED UW TO 1,6W/M2K.L.? FIXED WHOLE CONTAINER, INCLUDING CHASSIS UW 1,6 (English)
Property / summary: INTERVENTION N.1: THERMAL INSULATION OF THE OUTER WALLS. OBJECTIVE? THAT OF REDUCING LOSSES BY BRINGING THE TRANSMITTANCE AT 0,212 W/M2K, AND THE SUMMER THERMAL LOSSES, BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.02 W/M2K. THE INTERVENTION PROVIDES FOR THE COMPLETION OF ALL THE BUILDING BLOCKS OF AN EIGHT-COAT THERMAL INSULATION SYSTEM CARRIED OUT VIA SINTERED POLYSTYRENE FOAM PANEL OF THICKNESSES OF M120 WITH PLASTER MADE OF WIRED GLASS FIBRE. ESSENTIAL WORK: SCAFFOLDING, INSULATION LAYER, DISASSEMBLY/DISMANTLING, NO 2: WINDOW FRAMES AND WINDOWS — INSTALLATION OF OMBREGGATURA.L? OBJECTIVE? DOES IT PROVIDE FOR THE REPLACEMENT OF ALL WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES AND HEAT-CUT WINDOWS AND DOUBLE ANTI-NOISE CHAMBER GLASS 66.2A/15/44.2, WITH A THERMAL TRANSMITTANCE OF THERMAL TRANSMITTANCE, BY REDUCING THE LOSSES BY BRINGING THE TRANSMITTANCE OF THE FIXED UW TO 1,6W/M2K.L.? FIXED WHOLE CONTAINER, INCLUDING CHASSIS UW 1,6 (English) / rank
 
Normal rank

Revision as of 09:58, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000093) ENERGY EFFICIENCY IN AVERAGE “PAPINI” AVERAGE SCHOOL
Project in Italy financed by DG Regio

    Statements

    0 references
    197,794.0 Euro
    0 references
    439,542.2 Euro
    0 references
    45.0 percent
    0 references
    3 April 2018
    0 references
    3 April 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI CASTELNUOVO BERARDENGA
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INTERVENTO N.1: ISOLAMENTO TERMICO DELLE PARETI ESTERNE. L?OBBIETTIVO ? QUELLO DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA A 0,212 W/M2K, E LE RIENTRATE TERMICHE ESTIVE PORTANDO LA TRASMITTANZA TERMICA PERIODICA A 0.02 W/M2K. L?INTERVENTO PREVEDE LA REALIZZAZIONE SU TUTTI I PROSPETTI DEL FABBRICATO DI UN SISTEMA DI ISOLAMENTO TERMICO A CAPPOTTO REALIZZATO TRAMITE PANNELLI DI POLISTIRENE ESPANSO SINTERIZZATO DI SPESSORE MM120 CON FINITURA AD INTONACO ARMATO CON RETE IN FIBRA DI VETRO. LAVORAZIONI ESSENZIALI: MONTAGGIO PONTEGGIO, POSA STRATO DI ISOLANTE, SMONTAGGIO PONTEGGIO.INTERVENTO N.2: SOSTITUZIONE DI SERRAMENTI E INFISSI - INSTALLAZIONE SISTEMA DI OMBREGGIATURA.L?OBBIETTIVO ? QUELLO DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA DELL?INFISSO UW A 1,6W/M2K.L?INTERVENTO PREVEDE LA SOSTITUZIONE DI TUTTI I SERRAMENTI CON INFISSI IN ALLUMINIO A TAGLIO TERMICO E VETRO CAMERA DOPPIO ANTIRUMORE 66.2A/15/44.2, CON TRASMITTANZA TERMICA DELL? INTERO INFISSO COMPRESO TELAIO UW 1,6 (Italian)
    0 references
    INTERVENTION N.1: THERMAL INSULATION OF THE OUTER WALLS. OBJECTIVE? THAT OF REDUCING LOSSES BY BRINGING THE TRANSMITTANCE AT 0,212 W/M2K, AND THE SUMMER THERMAL LOSSES, BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.02 W/M2K. THE INTERVENTION PROVIDES FOR THE COMPLETION OF ALL THE BUILDING BLOCKS OF AN EIGHT-COAT THERMAL INSULATION SYSTEM CARRIED OUT VIA SINTERED POLYSTYRENE FOAM PANEL OF THICKNESSES OF M120 WITH PLASTER MADE OF WIRED GLASS FIBRE. ESSENTIAL WORK: SCAFFOLDING, INSULATION LAYER, DISASSEMBLY/DISMANTLING, NO 2: WINDOW FRAMES AND WINDOWS — INSTALLATION OF OMBREGGATURA.L? OBJECTIVE? DOES IT PROVIDE FOR THE REPLACEMENT OF ALL WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES AND HEAT-CUT WINDOWS AND DOUBLE ANTI-NOISE CHAMBER GLASS 66.2A/15/44.2, WITH A THERMAL TRANSMITTANCE OF THERMAL TRANSMITTANCE, BY REDUCING THE LOSSES BY BRINGING THE TRANSMITTANCE OF THE FIXED UW TO 1,6W/M2K.L.? FIXED WHOLE CONTAINER, INCLUDING CHASSIS UW 1,6 (English)