MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND PORT SYSTEM OF NAPOL’ A3 — SURFACE CLEAN-UP OF UNEXPLODED REMNANTS OF WAR ON THE AREAS AFFECTED BY THE CABLE (Q2023264): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): THE FIRST ACTIVITY WILL BE THAT OF THE EXISTING SURVEY OF THE EXISTING BATHYMETRIC EXISTING IN ORDER TO OPTIMISE THE USE OF SEARCH AND MAPPING TOOLS FOR POSSIBLE EXPLOSIVE REMNANTS OF WAR. SUBSEQUENTLY, A SURVEY WITH THE APPROPRIATE INSTRUMENTS FOR IDENTIFYING THE TARGETS HELD IN THE FONEAPOI IS EXPECTED TO BE CARRIED OUT IN THE ‘TARGET AREAS’ IDENTIFIED WITH THE PREVIOUS INSTRUMENTATION TO DETECT METAL OBJECTS. AT THE END OF THE VERIFICATION,...)
Property / summary
 
THE FIRST ACTIVITY WILL BE THAT OF THE EXISTING SURVEY OF THE EXISTING BATHYMETRIC EXISTING IN ORDER TO OPTIMISE THE USE OF SEARCH AND MAPPING TOOLS FOR POSSIBLE EXPLOSIVE REMNANTS OF WAR. SUBSEQUENTLY, A SURVEY WITH THE APPROPRIATE INSTRUMENTS FOR IDENTIFYING THE TARGETS HELD IN THE FONEAPOI IS EXPECTED TO BE CARRIED OUT IN THE ‘TARGET AREAS’ IDENTIFIED WITH THE PREVIOUS INSTRUMENTATION TO DETECT METAL OBJECTS. AT THE END OF THE VERIFICATION, YOU WILL FIND OUT ANY CLEAN-UP OPERATIONS THAT WILL HAVE TO BE CARRIED OUT BY SPECIALISTS THROUGH THE COMPETENT AUTHORITIES. GIVEN THAT INTERVENTIONS IN THE FIELD OF PROSPECTING AND INVESTIGATION AND PROSPECTION OPERATIONS ARE CONCERNED, THE PRESENCE OF UNDERWATER ARCHAEOLOGISTS IS NOT CONSIDERED INDISPENSABLE, AND THE REPORT ON THE ARCHAEOLOGICAL RISK ASSESSMENT HAS NOT BEEN DRAWN UP. (English)
Property / summary: THE FIRST ACTIVITY WILL BE THAT OF THE EXISTING SURVEY OF THE EXISTING BATHYMETRIC EXISTING IN ORDER TO OPTIMISE THE USE OF SEARCH AND MAPPING TOOLS FOR POSSIBLE EXPLOSIVE REMNANTS OF WAR. SUBSEQUENTLY, A SURVEY WITH THE APPROPRIATE INSTRUMENTS FOR IDENTIFYING THE TARGETS HELD IN THE FONEAPOI IS EXPECTED TO BE CARRIED OUT IN THE ‘TARGET AREAS’ IDENTIFIED WITH THE PREVIOUS INSTRUMENTATION TO DETECT METAL OBJECTS. AT THE END OF THE VERIFICATION, YOU WILL FIND OUT ANY CLEAN-UP OPERATIONS THAT WILL HAVE TO BE CARRIED OUT BY SPECIALISTS THROUGH THE COMPETENT AUTHORITIES. GIVEN THAT INTERVENTIONS IN THE FIELD OF PROSPECTING AND INVESTIGATION AND PROSPECTION OPERATIONS ARE CONCERNED, THE PRESENCE OF UNDERWATER ARCHAEOLOGISTS IS NOT CONSIDERED INDISPENSABLE, AND THE REPORT ON THE ARCHAEOLOGICAL RISK ASSESSMENT HAS NOT BEEN DRAWN UP. (English) / rank
 
Normal rank

Revision as of 09:24, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND PORT SYSTEM OF NAPOL’ A3 — SURFACE CLEAN-UP OF UNEXPLODED REMNANTS OF WAR ON THE AREAS AFFECTED BY THE CABLE
Project in Italy financed by DG Regio

    Statements

    0 references
    3,750,000.0 Euro
    0 references
    5,000,000.0 Euro
    0 references
    75.0 percent
    0 references
    28 February 2015
    0 references
    1 January 2020
    0 references
    AUTORITA' DI SISTEMA PORTUALE DEL MAR TIRRENO CENTRALE
    0 references
    0 references

    40°50'9.35"N, 14°14'55.61"E
    0 references
    LA PRIMA ATTIVITà SARà QUELLA DELLO STUDIO DEL RILIEVO BATIMETRICO ESISTENTE AL FINE DI OTTIMIZZARE L'IMPIEGO DEGLI STRUMENTI DI RICERCA E DI MAPPATURA DI EVENTUALI RESIDUATI BELLICI. SUCCESSIVAMENTE SI PROVVEDERà AD UNA PROSPEZIONE CON IDONEA STRUMENTAZIONE CAPACE DI INDIVIDUARE I BERSAGLI GIACENTI SUL FONDALE.POI SI PROVVEDERà AD UN RILIEVO CHE VERRà ESEGUITO NELLE 'AREE BERSAGLIO' GIà INDIVIDUATE CON LA PRECEDENTE STRUMENTAZIONE AL FINE DI RILEVARE LA PRESENZA DI OGGETTI METALLICI. AL TERMINE DELLA VERIFICA SI PROVVEDERà ALLE EVENTUALI OPERAZIONI DI BONIFICA CHE DOVRANNO ESSERE ESEGUITE DA OPERATORI SPECIALISTI TRAMITE AMMINISTRAZIONI COMPETENTI. ESSENDO GLI INTERVENTI IN ARGOMENTO OPERAZIONI DI PROSPEZIONE E DI INDAGINE E NON DI SCAVO NON SI RITIENE INDISPENSABILE LA PRESENZA DI ARCHEOLOGI SUBACQUEI E QUINDI NON Ê STATA ELABORATA LA RELAZIONE DELLA VALUTAZIONE DEL RISCHIO ARCHEOLOGICO. (Italian)
    0 references
    THE FIRST ACTIVITY WILL BE THAT OF THE EXISTING SURVEY OF THE EXISTING BATHYMETRIC EXISTING IN ORDER TO OPTIMISE THE USE OF SEARCH AND MAPPING TOOLS FOR POSSIBLE EXPLOSIVE REMNANTS OF WAR. SUBSEQUENTLY, A SURVEY WITH THE APPROPRIATE INSTRUMENTS FOR IDENTIFYING THE TARGETS HELD IN THE FONEAPOI IS EXPECTED TO BE CARRIED OUT IN THE ‘TARGET AREAS’ IDENTIFIED WITH THE PREVIOUS INSTRUMENTATION TO DETECT METAL OBJECTS. AT THE END OF THE VERIFICATION, YOU WILL FIND OUT ANY CLEAN-UP OPERATIONS THAT WILL HAVE TO BE CARRIED OUT BY SPECIALISTS THROUGH THE COMPETENT AUTHORITIES. GIVEN THAT INTERVENTIONS IN THE FIELD OF PROSPECTING AND INVESTIGATION AND PROSPECTION OPERATIONS ARE CONCERNED, THE PRESENCE OF UNDERWATER ARCHAEOLOGISTS IS NOT CONSIDERED INDISPENSABLE, AND THE REPORT ON THE ARCHAEOLOGICAL RISK ASSESSMENT HAS NOT BEEN DRAWN UP. (English)
    0 references