SILENT CAB ON FREE FLOAT AND DECOUPLED BRIDGES (Q2034317): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): THE AIM OF THE PROJECT IS TO DEVELOP CALCULATIONS AND EXPERIENCE FOR THE DESIGN OF SYSTEMS AND METHODS FOR BUILDING PREFABRICATED CABINS INCLUDING FLOATING FLOORS, INTEGRATING THE INSTALLATION OF THE BOOTHS WITH THE ASSEMBLY OF DECKS AND USING THE ADVANCED SYSTEM OF STRUCTURAL DECOUPLING TO OPTIMISE THE VARRO-ACUSTICO, WITH A VIEW TO REDUCING PRODUCTION COSTS AND ENSURING GREATER ECO-LALITY., Adding English summary)
Property / summary
 
THE AIM OF THE PROJECT IS TO DEVELOP CALCULATIONS AND EXPERIENCE FOR THE DESIGN OF SYSTEMS AND METHODS FOR BUILDING PREFABRICATED CABINS INCLUDING FLOATING FLOORS, INTEGRATING THE INSTALLATION OF THE BOOTHS WITH THE ASSEMBLY OF DECKS AND USING THE ADVANCED SYSTEM OF STRUCTURAL DECOUPLING TO OPTIMISE THE VARRO-ACUSTICO, WITH A VIEW TO REDUCING PRODUCTION COSTS AND ENSURING GREATER ECO-LALITY. (English)
Property / summary: THE AIM OF THE PROJECT IS TO DEVELOP CALCULATIONS AND EXPERIENCE FOR THE DESIGN OF SYSTEMS AND METHODS FOR BUILDING PREFABRICATED CABINS INCLUDING FLOATING FLOORS, INTEGRATING THE INSTALLATION OF THE BOOTHS WITH THE ASSEMBLY OF DECKS AND USING THE ADVANCED SYSTEM OF STRUCTURAL DECOUPLING TO OPTIMISE THE VARRO-ACUSTICO, WITH A VIEW TO REDUCING PRODUCTION COSTS AND ENSURING GREATER ECO-LALITY. (English) / rank
 
Normal rank

Revision as of 09:14, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
SILENT CAB ON FREE FLOAT AND DECOUPLED BRIDGES
Project in Italy financed by DG Regio

    Statements

    0 references
    88,949.74 Euro
    0 references
    177,899.37 Euro
    0 references
    50.0 percent
    0 references
    10 November 2017
    0 references
    30 June 2021
    0 references
    CSNI - CONSORZIO SERVIZI NAVALI E INDUSTRIALI - SOCIETA' A RESPONSABILITA' LIMITATA
    0 references
    0 references
    IL PROGETTO INTENDE SVILUPPARE I CALCOLI E LE ESPERIENZE PER L¿IDEAZIONE DI SISTEMI E METODI CHE CONSENTANO DI ALLESTIRE CABINE PREFABBRICATE COMPRENSIVE DI PAVIMENTAZIONI FLOTTANTI, INTEGRANDO I PROCESSI DI INSTALLAZIONE DELLE CABINE CON QUELLI DI ASSEMBLAGGIO DEI PUNTELLI DEI PONTI E UTILIZZANDO I PIù AVANZATI DISPOSITIVI DI DISACCOPPIAMENTO STRUTTURALE PER OTTIMIZZARE IL COMFORT VIBRO-ACUSTICO, CON L¿OBIETTIVO DI ABBATTERE I COSTI DI PRODUZIONE GARANTENDO ANCHE UNA MAGGIORE ECO-SOSTENIB (Italian)
    0 references
    THE AIM OF THE PROJECT IS TO DEVELOP CALCULATIONS AND EXPERIENCE FOR THE DESIGN OF SYSTEMS AND METHODS FOR BUILDING PREFABRICATED CABINS INCLUDING FLOATING FLOORS, INTEGRATING THE INSTALLATION OF THE BOOTHS WITH THE ASSEMBLY OF DECKS AND USING THE ADVANCED SYSTEM OF STRUCTURAL DECOUPLING TO OPTIMISE THE VARRO-ACUSTICO, WITH A VIEW TO REDUCING PRODUCTION COSTS AND ENSURING GREATER ECO-LALITY. (English)
    0 references

    Identifiers

    D43D19000050007
    0 references