Energy renovation of the building of the Cultural House and Mayor’s Office in Gyöngyöspata_x000D_ (Q3951089): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
85.0 percent
| |||||||||||||||
Property / co-financing rate: 85.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
195,882,610.0 forint
| |||||||||||||||
Property / budget: 195,882,610.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
553,760.14 Euro
| |||||||||||||||
Property / budget: 553,760.14 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 553,760.14 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 553,760.14 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
166,500,218.5 forint
| |||||||||||||||
Property / EU contribution: 166,500,218.5 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
470,696.12 Euro
| |||||||||||||||
Property / EU contribution: 470,696.12 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 470,696.12 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 470,696.12 Euro / qualifier | |||||||||||||||
point in time: 15 February 2022
|
Revision as of 04:08, 15 February 2022
Project Q3951089 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of the building of the Cultural House and Mayor’s Office in Gyöngyöspata_x000D_ |
Project Q3951089 in Hungary |
Statements
166,500,218.5 forint
0 references
195,882,610.0 forint
0 references
85.0 percent
0 references
1 April 2018
0 references
28 February 2021
0 references
GYÖNGYÖSPATA VÁROS ÖNKORMÁNYZATA
0 references
A projekt megvalósításának szükségességét az önkormányzati épületek hatékonyabb energiahasználatának, racionálisabb energiagazdálkodásának elérése indokolja. A fejlesztéseknek köszönhetően nem csak az épületek energetikai mutatói javulhatnak jelentősen, hanem a városkép megújításában, modernizálásában is előrelépés történhet. A projekt célja a 100%-ban önkormányzati tulajdonban lévő épületek energiahatékonyságot célzó felújításainak és fejlesztéseinek megvalósítása, melyek a fosszilis energiahordozókból származó üvegházhatású gázok kibocsátásának csökkentését szolgálják. A projektbe bevonni kívánt épületek energetikai felújítása a pályázati kiírással összhangban valósul meg és illeszkedik ahhoz. A projekt megvalósításának eredményéül szolgáló értékek hozzá járulnak a 2012/27/EU irányelv szerinti energiahatékonysági illetve a 2009/28/EK irányelv szerinti megújuló energia részarányra vonatkozó kötelezettségek tagállami teljesítéséhez. A fejlesztéssel érintett projekt helyszínek:.Polgármesteri Hivatal és a Művelődési ház Általánosságban megállapítható, hogy a fejlesztésbe bevont épületek külső határolószerkezeteinek rétegtervi hőátbocsátási tényezője nem megfelelő a fejlesztéssel érintett épület energetikai jellemzőinek meghatározásáról szóló 7/2006. (V.24.) TNM rendelet alapján, továbbá a fűtési rendszereik sem tesznek eleget a kor követelményeinek, ezzel sok esetben energiapazarló, gazdaságtalan üzemet létrehozva. Jelen pályázat célja, hogy javaslatot tegyen Gyöngyöspata település fejlesztésbe bevont épületének energetikai korszerűsítésére. Az épület és ezáltal az önkormányzat üzemeltetési költségeinek csökkentését célzó fejlesztési javaslatok: 1. épület: Polgármesteri Hivatal: - külső falak hőszigetelése 14 cm és 15 cm vastag EPS hőszigetelő rendszerrel; - belső fal hőszigetelése 14 cm vastag EPS hőszigetelő rendszerrel; - nyílászárók cseréje korszerű, műanyag keretszerkezetű, hőszigetelő üvegezésű ajtókra és ablakokra (U=1,15 W/m2K); - pincefödém hőszigetelése 14 cm vastag EPS hőszigetelő rendszerrel; - padlásfödém hőszigetelése 22 cm vastag ásványgyapot hőszigetelő rendszerrel; - tető hőszigetelése 20 cm vastag EPS hőszigetelő rendszerrel; - Fűtési rendszer hőleadói hálózatának korszerűsítése: o új csővezeték rendszer; o radiátorok cseréje termosztatikus szeleppel ellátott acéllemez lapradiátorokra; o új intelligens szabályzás kiépítése hőtermelői oldalon - meglévő napelemes rendszer bővítése 5,46 kWp-kel (6kVA csatlakozási teljesítménnyel) - projektarányos akadálymentesítés. 2. épület: Művelődési ház: - külső falak hőszigetelése 15 cm és 16 cm vastag EPS hőszigetelő rendszerrel; - belső fal hőszigetelése 14 cm vastag EPS hőszigetelő rendszerrel; - nyílászárók cseréje korszerű, műanyag keretszerkezetű, hőszigetelő üvegezésű ajtókra és ablakokra (U=1,15 W/m2K), valamint műanyag külső ajtókra (U=1,45 W/m2K); - pincefödém hőszigetelése 14 cm vastag EPS hőszigetelő rendszerrel; - tető hőszigetelése 22 cm vastag EPS hőszigetelő rendszerrel; - Fűtési rendszer korszerűsítése: o hőtermelői oldal cseréje: meglévő gázkazánok és gázkonvektorok helyett időjáráskövető szabályozással ellátott kondenzációs gázkazánok beépítése; o új csővezeték rendszer; o radiátorok cseréje termosztatikus szeleppel ellátott acéllemez lapradiátorokra; - 22 kWp teljesítményű (22 kVA csatlakozási teljesítményű) napelemes rendszer telepítése; - projektarányos akadálymentesítés. Az energetikai korszerűsítéssel elérhető energiahatékonyság növelés elsősorban az épület használóit, látogatóit szolgálná. Az energiafelhasználás csökkenés környezeti hatásterülete azonban túlmutat az épület határain és közvetve az egész ország energiaellátásának biztonságát és versenyképességét javítja, továbbá a környezeti állapot megőrzését érdemben szolgálja. Az épület valamennyi, a korszerűsítésben érintett külső határoló szerkezetének tervezett állapota úgy került meghatározásra, hogy megfeleljen a 7/2006 (V.24.) TNM rendelet hőátbocsátási tényezőkre vonatkozó költségoptimalizált követelményértékeinek. A jelen pályázat tárgyát képező energetikai korszerűsítések/fejlesztések megfelelnek a Terület- és Településfejlesztési Operatív Program (TOP) stratégiai céljainak, amelyek a fosszilis energiahordozókból származó üvegházhatású gázok (ÜHG) kibocsátásának csökkentését szolgálják. A projekt üzemeltetését az önkormányzat saját hatáskörében kívánja megvalósítani, mivel a fejlesztést követően az üzemeltetés nem kívánja a külső erőforrás bevonását. (Hungarian)
0 references
The need to implement the project is justified by achieving a more efficient use of energy in municipal buildings and a more rational energy management. Thanks to the improvements, not only the energy indicators of buildings can improve significantly, but also progress can be made in the renewal and modernisation of the cityscape. The aim of the project is to achieve energy efficiency renovations and improvements in buildings that are 100 % municipally owned, with a view to reducing greenhouse gas emissions from fossil fuels. The energy refurbishment of the buildings to be included in the project will be carried out in accordance with the call for proposals and are in line with it. The results of the project will contribute to Member States’ energy efficiency obligations under Directive 2012/27/EU and the share of renewable energy under Directive 2009/28/EC. The project sites involved in the development are:.The Mayor’s Office and the House of Culture Generally can be concluded that the heat transfer factor of the external delimitation structures of the buildings involved in the development is not adequate for the determination of the energy characteristics of the building concerned by the development 7/2006. (V.24.) TNM Decree (V.24.) and their heating systems do not meet the requirements of the age, creating in many cases energy-wasting and inefficient plants. The purpose of this tender is to propose the energy modernisation of the building in Gyöngyöspata, which is involved in the development. Development proposals aimed at reducing the operating costs of the building and thus of the municipality: Building 1: Mayor’s Office: — thermal insulation of external walls with EPS thermal insulation system 14 cm and 15 cm thick; — thermal insulation of internal wall with EPS thermal insulation system 14 cm thick; — replacement of doors and windows for modern plastic framed doors and windows with thermal insulating glazing (U=1,15 W/m2K); — thermal insulation of basement floor with 14 cm thick EPS thermal insulation system; — thermal insulation of the attic floor with a system of thermal insulation of 22 cm thick mineral wool; — roof insulation with 20 cm thick EPS thermal insulation system; — Modernisation of the heat output network of the heating system: O new pipeline system; O replacement of radiators for sheet radiators with thermostatic valve; O Developing a new smart regulation on the heat producer side — expansion of the existing solar system by 5.46 kWp (6kVA connection power) — project-proportional accessibility. Building 2: Cultural house: — thermal insulation of external walls with EPS thermal insulation system 15 cm and 16 cm thick; — thermal insulation of internal wall with EPS thermal insulation system 14 cm thick; — replacement of doors and windows for modern plastic framed doors and windows (U=1,15 W/m2K) and exterior doors of plastics (U=1,45 W/m2K); — thermal insulation of basement floor with 14 cm thick EPS thermal insulation system; — roof insulation with 22 cm thick EPS thermal insulation system; — Modernisation of the heating system: O replacement of heat-producers’ side: installation of condensation gas boilers with weather monitoring control instead of existing gas boilers and gas convectors; O new pipeline system; O replacement of radiators for sheet radiators with thermostatic valve; — Installation of a solar system with a power of 22 kWp (22 kVA connection); — pro-project accessibility. Increasing energy efficiency through energy modernisation would primarily serve the occupants and visitors of the building. However, the environmental impact area of the reduction of energy consumption extends beyond the boundaries of the building and indirectly improves the security and competitiveness of the entire country’s energy supply and serves to preserve the state of the environment. The planned state of all external boundaries of the building affected by the renovation was determined in such a way as to comply with the cost-optimal requirements for heat transmission factors in Decree No 7/2006 of 24 May 2006. The energy upgrades/developments covered by this tender comply with the strategic objectives of the Territorial and Settlement Development Operational Programme (TOP) to reduce greenhouse gas (GHG) emissions from fossil fuels. The municipality intends to implement the operation of the project under its own responsibility, since after the development the operation does not require the involvement of an external resource. (English)
9 February 2022
0 references
La nécessité de mettre en œuvre le projet se justifie par une utilisation plus efficace de l’énergie dans les bâtiments municipaux et une gestion plus rationnelle de l’énergie. Grâce à ces améliorations, non seulement les indicateurs énergétiques des bâtiments peuvent s’améliorer de manière significative, mais aussi des progrès dans le renouvellement et la modernisation du paysage urbain. L’objectif du projet est de rénover et d’améliorer l’efficacité énergétique des bâtiments appartenant à 100 % aux municipalités, en vue de réduire les émissions de gaz à effet de serre provenant des combustibles fossiles. La rénovation énergétique des bâtiments à inclure dans le projet sera réalisée conformément à l’appel à propositions et conforme à celui-ci. Les résultats du projet contribueront aux obligations des États membres en matière d’efficacité énergétique au titre de la directive 2012/27/UE et à la part des énergies renouvelables au titre de la directive 2009/28/CE. Les sites du projet impliqués dans le développement sont:.Le Bureau du Maire et la Maison de la Culture Généralement peuvent être conclu que le facteur de transfert de chaleur des structures de délimitation externe des bâtiments impliqués dans le développement n’est pas adéquat pour la détermination des caractéristiques énergétiques du bâtiment concerné par le développement 7/2006. (V.24.) Le décret TNM (V.24.) et leurs systèmes de chauffage ne répondent pas aux exigences de l’âge, créant dans de nombreux cas des installations économes en énergie et inefficaces. L’objet du présent appel d’offres est de proposer la modernisation énergétique du bâtiment de Gyöngyöspata, qui est impliqué dans le développement. Propositions de développement visant à réduire les coûts de fonctionnement du bâtiment et donc de la municipalité: Bâtiment 1: Bureau du maire: — isolation thermique des murs extérieurs avec système d’isolation thermique EPS 14 cm et 15 cm d’épaisseur; — isolation thermique du mur intérieur avec système d’isolation thermique EPS 14 cm d’épaisseur; — remplacement des portes et fenêtres pour portes et fenêtres modernes en plastique avec vitrage isolant thermique (U=1,15 W/m2K); — isolation thermique du sol sous-sol avec 14 cm d’épaisseur EPS système d’isolation thermique; — isolation thermique du sol grenier avec un système d’isolation thermique de la laine minérale de 22 cm d’épaisseur; — isolation de toit avec 20 cm d’épaisseur EPS système d’isolation thermique; — Modernisation du réseau de production de chaleur du système de chauffage: O nouveau réseau pipelinier; O remplacement des radiateurs pour radiateurs en tôle par une vanne thermostatique; O Élaborer une nouvelle réglementation intelligente du côté des producteurs de chaleur — expansion du système solaire existant de 5,46 kWp (6 kVA) — accessibilité proportionnelle au projet. Bâtiment 2: Maison culturelle: — isolation thermique des murs extérieurs avec système d’isolation thermique EPS 15 cm et 16 cm d’épaisseur; — isolation thermique du mur intérieur avec système d’isolation thermique EPS 14 cm d’épaisseur; — remplacement des portes et fenêtres pour portes et fenêtres modernes en plastique (U=1,15 W/m2K) et portes extérieures en plastique (U=1,45 W/m2K); — isolation thermique du sol sous-sol avec 14 cm d’épaisseur EPS système d’isolation thermique; — isolation de toit avec système d’isolation thermique EPS de 22 cm d’épaisseur; — Modernisation du système de chauffage: O remplacement du côté des producteurs de chaleur: installation de chaudières à gaz de condensation avec contrôle des intempéries au lieu des chaudières à gaz et des convecteurs à gaz existants; O nouveau réseau pipelinier; O remplacement des radiateurs pour radiateurs en tôle par une vanne thermostatique; — Installation d’un système solaire d’une puissance de 22 kWp (22 kVA de connexion); — accessibilité pro-projet. L’amélioration de l’efficacité énergétique par la modernisation de l’énergie servirait principalement les occupants et les visiteurs du bâtiment. Toutefois, le domaine de l’impact environnemental de la réduction de la consommation d’énergie s’étend au-delà des limites du bâtiment et améliore indirectement la sécurité et la compétitivité de l’approvisionnement énergétique de l’ensemble du pays et contribue à préserver l’état de l’environnement. L’état prévu de toutes les limites extérieures du bâtiment concerné par la rénovation a été déterminé de manière à satisfaire aux exigences optimales en termes de coûts pour les facteurs de transmission de chaleur prévues par le décret no 7/2006 du 24 mai 2006. Les améliorations/développements énergétiques couverts par le présent appel d’offres sont conformes aux objectifs stratégiques du programme opérationnel de développement des territoires et des établissements (POT) de réduction des émissions de gaz à effet de serre (GES) provenant des combustibles fossiles. La municipalité a l’intention de mettre en œuvre l’exploitation du projet sous sa propre responsabilité,... (French)
10 February 2022
0 references
Gyöngyöspata, Heves
0 references
Identifiers
TOP-3.2.1-16-HE1-2017-00006
0 references