Drainage of rainwater in areas at risk of flooding in the city of Csurgó (Q3949165): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
90.0 percent
Amount90.0 percent
Unitpercent
Property / co-financing rate: 90.0 percent / rank
 
Normal rank
Property / budget
 
60,900,000.0 forint
Amount60,900,000.0 forint
Unitforint
Property / budget: 60,900,000.0 forint / rank
 
Normal rank
Property / budget
 
172,164.3 Euro
Amount172,164.3 Euro
UnitEuro
Property / budget: 172,164.3 Euro / rank
 
Preferred rank
Property / budget: 172,164.3 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 172,164.3 Euro / qualifier
 
point in time: 15 February 2022
Timestamp+2022-02-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
54,810,000.0 forint
Amount54,810,000.0 forint
Unitforint
Property / EU contribution: 54,810,000.0 forint / rank
 
Normal rank
Property / EU contribution
 
154,947.87 Euro
Amount154,947.87 Euro
UnitEuro
Property / EU contribution: 154,947.87 Euro / rank
 
Preferred rank
Property / EU contribution: 154,947.87 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 154,947.87 Euro / qualifier
 
point in time: 15 February 2022
Timestamp+2022-02-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 03:27, 15 February 2022

Project Q3949165 in Hungary
Language Label Description Also known as
English
Drainage of rainwater in areas at risk of flooding in the city of Csurgó
Project Q3949165 in Hungary

    Statements

    0 references
    0 references
    54,810,000.0 forint
    0 references
    154,947.87 Euro
    0.002827 Euro
    15 February 2022
    0 references
    60,900,000.0 forint
    0 references
    172,164.3 Euro
    0.002827 Euro
    15 February 2022
    0 references
    90.0 percent
    0 references
    1 February 2018
    0 references
    26 March 2020
    0 references
    CSURGÓ VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    46°15'59.08"N, 17°5'34.58"E
    0 references
    A projekt átfogó célja: A település belterületi csapadékvíz elvezetési rendszerének fejlesztése, környezetbiztonságának növelése, környezeti állapotának javítása és a helyi vízkár veszélyeztetettségének csökkentése, továbbá a további környezeti káresemények megelőzése. A projekt specifikus célja: A település belterületi csapadékvíz-elvezető hálózat egy részének felújítás, fejlesztése elsősorban a belterületre hirtelen hulló csapadékvizek rendezett és kártétel nélküli elvezetésére. A projekt szakmai-műszaki tartalma: Önállóan támogatható tevékenység: elválasztott rendszerű csapadékvíz-elvezető hálózat felújítása, fejlesztése, bővítése. Jelenlegi állapot Az időjárás tartós átalakulására és a klímaváltozásra utal, hogy az éves vízmennyiség kevesebb esetszámú, de nagyobb intenzitású csapadékok formájában érkezik a területre. Az eddigi kiegyenlítettebb csapadékeloszlásra és abból képződő lefolyásra készült árkok és vízelvezető rendszerek részben a méreteik, részben a rossz karbantartási viszonyaik miatt a megnövekedett árhullám-csúcsokat elvezetni képtelenek. Az érintett városrész problémáinak bemutatása - A Kodály Zoltán utca nyugati telkei alatti árok kiöntése okozza a fő problémát. Jelentős mennyiségű csapadék esetén, a burkolt árokban megemelkedett vízszint visszaduzzasztja a vizet az alacsonyan fekvő telkekre. Az árok burkolata néhol összecsúszott, a meder felújításra szorul. - A Kodály utcában az okozza a fő problémát, hogy kapubejárók erősen a nyugati irányba lejtenek, a víz nem folyik bele az árkokba, hanem a telkeken keresztül jut a nyugati telekhatárnál lévő árokba. A burkolt árok az utcában nem megfelelő állapotú. - A Réti József utcában jelenleg nincs semmilyen vízelvezetés, a mélyponton a Kodály utca 22-es számú ház található. Nagyobb csapadék esetén a telket a víz elönti, az egész utca vize azon keresztül folyik a Kodály utcába. - A Soltra A. utca és a Semmelweis utcák csapadékcsatornái nem viszik el a csapadékvizet. Az utca burkolatán folyik le a csapadékvíz. - A Polgármesteri Hivatal előtt a Széchenyi téren, a hivatal tetejéről leérkező csapadékvizek nincsenek elvezetve, a meglévő térkő burkolatot a csapadék kikezdte. Koncepció Kodály utcai telkek nyugati végében lévő árok (980/1, 987, 988/4, 989/2 hrsz): Az árokprofil kialakítása úgy történjen, hogy az árok TB 40/70/50-es CSOMIÉP elemekkel burkolásra kerüljön, az árok a jelenlegi mederfenékhez képest süllyesztve lesz. A telkekről történő csapadékvíz bevezetésekhez torló csappantyú kerülne beépítésre, amely megakadályozza a visszaduzzadást. A meglévő kapubejárók helyén a TB elem vb. födémet kap. Basakúti utca (705, 706 hrsz): Az árok további szakaszán a Basakúti utcán a burkolat rekonstrukciója szükséges. Számításaink szerint a D600-as beton átereszek, illetve a Basakúti utcáról a Máriás-patak mellékágáig lefektetett D 600-as betoncső megfelelő átmérőjű. A Basakúti utca keresztezésében lévő áteresz le van szakadva, vízemésztése így nem megfelelő, rekonstrukciója elmaradhatatlan. A Basakúti utca mélypontjától északra egy szakasza az ároknak nincs burkolva, ezt burkolni szükséges 40x40-es mederlappal. Kodály Zoltán utca (989/36 hrsz): Mivel a burkolat megrongálódott, fenékszélessége nem megfelelő, ezért az árkot 40x40-es mederlappal kell burkolni, fenékszélessége 40-es legyen. A kapubejárók kialakítása pedig úgy kell, hogy történjen, hogy a kapubejárók közepére egy rácsos folyóka kerüljön elhelyezésre. Réti József utca (989/51, 989/47 hrsz): Mivel az utcában nincs vízelvezetés, javasoljuk a járda mellé épített Csomiép PRF 50/50/10 folyóka elem beépítését. A mély ponton egy akna elhelyezése szükséges, majd a vizet NA 300 KG-PVC csővel a Kodály utcai zárt szakaszhoz csatlakoztatjuk. Semmelweis utca, Petőfi tér (1040, 947/3 hrsz): Az utcában és a téren a fedlapok az évek során tönkre mentek, állapotuk nem megfelelő, ezért rekonstrukció keretében 14 db új fedlap elhelyezését javasoljuk, ugyanez vonatkozik víznyelők környéki betonozásra is. Polgármesteri Hivatal előtt (Széchenyi tér, 946/3 hrsz): Az eresz alá egy víznyelő kerülne, és innen a vizet a Csokonai utcai zárt csatornába vezetjük. A szökőkút előtti mélyponton szintén egy víznyelő szükséges. Építendő összesen: - 255 m burkolt árok süllyesztve TB 40/70/50 - 130 m burkolat javítás40x40-es mederlappal (Basakúti utca) - 10 db torlócsappantyú beépítése - 1 db 14m-es NA 600-as áteresz cseréje - 216 m 40x40-es mederlapos burkolat (Basakúti és Kodály utca) - 10 db kapubejáró átépítése - 204 m folyóka PRF 50/50/10 - 202 m NA 300 KG-PVC cső(Réti József u. és Polgármesteri Hivatal melletti szakasz) - 14 db fedlapcsere a Petőfi téren, Semmelweis utcában - 6 db víznyelő körbe betonozása A tervezett fejlesztés eredményeként a kiépített és felújított csapadék-vízvédelmi létesítmények teljes hossza összesen 1007 m. Kötelezően megvalósítandó tevékenységek: - Tájékoztatás és nyilvánosság biztosítása - Szemléletformáló és tájékoztató akciók megvalósítása a csapadékvíz-gazdálkodás területén. A pr (Hungarian)
    0 references
    The overall objective of the project is to: Improve the drainage system of urban rainwater, increase its environmental safety, improve its environmental status and reduce the risk of local water damage, and prevent further environmental damage. Specific objective of the project: The refurbishment and development of part of the urban rainwater drainage network is primarily for the orderly and unharmed drainage of rainwater falling suddenly into the inner area. Technical and technical content of the project: Self-eligible activity: renovation, development and expansion of the separated rainwater drainage network. Current state The long-lasting change of weather and climate change is the fact that the annual amount of water comes in the form of rainfall with fewer cases but higher intensity. Ditches and drainage systems designed to achieve a more balanced rainfall distribution and flow from it are unable to lead to increased price wave peaks due to their size and poor maintenance conditions. Presentation of the problems of the affected part of the city — The main problem is the pouring of the ditch below the western plots of Kodály Zoltán Street. In case of significant rainfall, the raised water level in the paved trench will swell the water back to low-lying plots. The hull of the trench has slipped in some places, and the bed needs to be refurbished. — The main problem in Kodály Street is that gateways are firmly descending in the west direction, the water does not flow into the ditch, but through the plots it enters the ditch at the western boundary. The paved trench in the street is not in good condition. — There is currently no drainage in the Réti József street, the low point is house number 22 Kodály Street. In case of higher rainfall the land is flooded, the entire street water flows through it into Kodály Street. The precipitation channels of Soltra A. Street and Semmelweis Street do not take away the rainwater. Rainwater flows down the pavement of the street. — In front of the Mayor’s Office, on Széchenyi Square, the rainwaters coming down from the top of the office are not drained, the existing stone pavement was struck by the rainfall. Concept ditch at the western end of Kodály street plots (980/1, 987, 988/4, 989/2): The trench profile is designed in such a way that the ditch is covered with TB 40/70/50 CSOMIÉP elements, the ditch will be submerged compared to the current bottom. A damping damper would be installed for the introduction of rainwater from the plots, which prevents bloating. At the place of the existing gateways, the TB element is given a slab. Basakúti Street (705, 706 Hrsz): In the further section of the ditch, reconstruction of the pavement is required on Basakúti street. According to our calculations, the D600 concrete passages and the D 600 concrete pipe laid down from Basakúti street to the side branch of Mária stream are of sufficient diameter. The passage at the crossing of Basakúti Street is torn down, its water digestion is not suitable, its reconstruction is inevitable. North of the low point of Basakúti Street, a section of the ditch is not covered, which must be covered with a 40x40 bed. Kodály Zoltán utca (989/36 hsz): As the casing is damaged and its bottom width is not adequate, the trench should be covered with a 40x40 bed and a bottom width of 40. The gateways shall be designed in such a way that a latched river is placed in the centre of the gateways. Réti József utca (989/51, 989/47 Hrsz): As there is no drainage in the street, we recommend the installation of the CSOMIÉP PRF 50/50/10 river element next to the pavement. The deep point requires the installation of a pit, then the water is connected to the closed section of Kodály street with a NA 300 KG-PVC pipe. Semmelweis street, Petőfi square (1040, 947/3hrsz): In the street and on the square the cover panels have been destroyed over the years, their condition is not appropriate, so we recommend the installation of 14 new covers as part of reconstruction, the same applies to concrete construction in the vicinity of sinkholes. In front of the Mayor’s Office (Széchenyi Square, 946/3hrs): There’s a sinkhole under the eaves, and we'll get the water from here to the closed sewer on Csokonai Street. A sinkhole is also required at the bottom of the fountain. Total to be built: — 255 m paved ditch recessed TB 40/70/50-130 m pavement repair with 40x40 bedboard (Basakúti street) — installation of 10 pcs of gate dampers — replacement of 1 pass of 14 m NA 600-216 m 40x40 side cover (Basakúti and Kodály street) — 10 gate gates — 204 m river PRF 50/50/10-202 m NA 300 KG-PVC pipe (section next to József Réti street and Mayor’s Office) — 14 change of cover in Petőfi Square, Semmelweis Street — concreteling of 6 sinkholes. As a result of the planned development, the total length of the built and renovated rainwater protection facilities is 1 007 m. — Information and publicity — Implementation of awareness-raising... (English)
    9 February 2022
    0 references
    L’objectif général du projet est de: Améliorer le système de drainage des eaux pluviales urbaines, accroître sa sécurité environnementale, améliorer son état écologique et réduire le risque d’endommager les eaux locales et prévenir d’autres dommages environnementaux. Objectif spécifique du projet: La remise en état et le développement d’une partie du réseau urbain de drainage des eaux pluviales sont principalement destinés au drainage ordonné et inoffensif des eaux de pluie qui tombent soudainement dans la zone intérieure. Contenu technique et technique du projet: Activité auto-éligible: rénovation, développement et extension du réseau séparé de drainage des eaux pluviales. L’état actuel Le changement durable des conditions météorologiques et climatiques est le fait que la quantité annuelle d’eau se présente sous forme de précipitations avec moins de cas mais une intensité plus élevée. Les fossés et les systèmes de drainage conçus pour assurer une répartition et un flux pluviaux plus équilibrés ne sont pas en mesure d’augmenter les pics des vagues de prix en raison de leur taille et des mauvaises conditions d’entretien. Présentation des problèmes de la partie touchée de la ville — Le problème principal est le déversement du fossé sous les parcelles ouest de la rue Kodály Zoltán. En cas de précipitations importantes, le niveau d’eau élevé dans la tranchée pavée va gonfler l’eau jusqu’aux parcelles basses. La coque de la tranchée a glissé dans certains endroits, et le lit doit être rénové. — Le principal problème dans la rue Kodály est que les portes d’entrée descendent fermement dans la direction ouest, l’eau ne coule pas dans le fossé, mais à travers les parcelles il entre dans le fossé à la limite ouest. La tranchée pavée dans la rue n’est pas en bon état. — Il n’y a actuellement pas de drainage dans la rue Réti József, le point bas est la maison numéro 22 Kodály Street. En cas d’augmentation des précipitations, la terre est inondée, toute l’eau de la rue s’écoule dans la rue Kodály. Les canaux de précipitations de la rue Soltra A. et de la rue Semmelweis n’enlèvent pas l’eau de pluie. L’eau de pluie coule sur le trottoir de la rue. — Devant le bureau du maire, sur la place Széchenyi, les eaux de pluie qui descendent du haut du bureau ne sont pas drainées, le trottoir de pierre existant a été frappé par les pluies. Fossé conceptuel à l’extrémité ouest des parcelles de rue Kodály (980/1, 987, 988/4, 989/2): Le profil de tranchée est conçu de telle sorte que le fossé soit recouvert d’éléments TB 40/70/50 CSOMIÉP, le fossé sera submergé par rapport au fond actuel. Un amortisseur d’amortissement serait installé pour l’introduction de l’eau de pluie des parcelles, ce qui empêche les ballonnements. À la place des passerelles existantes, l’élément TB reçoit une dalle. Rue Basakúti (705, 706 Hrsz): Dans l’autre section du fossé, la reconstruction du trottoir est nécessaire sur la rue Basakúti. Selon nos calculs, les passages en béton D600 et le tuyau en béton D 600 posés de la rue Basakúti à la branche latérale du ruisseau Mária ont un diamètre suffisant. Le passage au croisement de la rue Basakúti est déchiré, sa digestion de l’eau n’est pas appropriée, sa reconstruction est inévitable. Au nord du point bas de la rue Basakúti, une section du fossé n’est pas couverte, qui doit être couverte d’un lit 40x40. Kodály Zoltán utca (989/36 HSZ): Comme le boîtier est endommagé et que sa largeur de fond n’est pas adéquate, la tranchée doit être recouverte d’un lit 40x40 et d’une largeur inférieure de 40. Les passerelles doivent être conçues de telle sorte qu’une rivière verrouillée soit placée au centre des portes. Réti József utca (989/51, 989/47 Hrsz): Comme il n’y a pas de drainage dans la rue, nous recommandons l’installation de l’élément de la rivière CSOMIÉP PRF 50/50/10 à côté du trottoir. Le point profond nécessite l’installation d’une fosse, puis l’eau est reliée à la section fermée de la rue Kodály avec un tuyau NA 300 KG-PVC. Rue Semmelweis, place Petőfi (1040, 947/3hrsz): Dans la rue et sur le carré, les panneaux de couverture ont été détruits au fil des ans, leur état n’est pas approprié, nous recommandons donc l’installation de 14 nouvelles couvertures dans le cadre de la reconstruction, il en va de même pour la construction en béton à proximité des puits. Devant le Bureau du Maire (Place Széchenyi, 946/3h): Il y a un gouffre sous les avant-toits, et on va chercher l’eau d’ici jusqu’à l’égout fermé sur la rue Csokonai. Un gouffre est également nécessaire au fond de la fontaine. Total à construire: — 255 m de fossé pavé encastré TB 40/70/50-130 m réparation de chaussée avec table de lit 40x40 (rue Basakúti) — installation de 10 pièces de clapets de portail — remplacement de 1 passe de 14 m NA 600-216 m 40x40 latéral (rue Basakúti et Kodály) — 10 portes — 204 m rivière PRF 50/50/10-202 m NA 300 KG-PVC (section à côté de la rue József Réti et du bureau du maire) — 14 changement de couverture sur l... (French)
    10 February 2022
    0 references
    Csurgó, Somogy
    0 references

    Identifiers

    TOP-2.1.3-15-SO1-2016-00004
    0 references