Restoration of brownfield site in Komló (Q3948697): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: fix budget) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 100.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 375,689,090.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,062,073.06 Euro / rank | |||||||||||||||
Property / budget: 1,062,073.06 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 1,062,073.06 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 375,689,090.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,062,073.06 Euro / rank | |||||||||||||||
Property / EU contribution: 1,062,073.06 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,062,073.06 Euro / qualifier | |||||||||||||||
|
Revision as of 03:17, 15 February 2022
Project Q3948697 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Restoration of brownfield site in Komló |
Project Q3948697 in Hungary |
Statements
1 September 2018
0 references
29 November 2021
0 references
KOMLÓ VÁROS ÖNKORMÁNYZAT
0 references
Az Önkormányzat célja barnamezős terület rehabilitációja által a vállalkozások számára vonzó,munkahelyteremtés céljából alkalmas kereskedelmi és szolgáltató központ kialakítása egy jelenleg üresen álló épület energetikai korszerűsítésével. A fejlesztés összhangban van a projekt céljaival, barnamező terület rehabilitációja történik. Fejlesztés indokoltsága, helyszíne: A hasznosítani kívánt barnamezős terület a város központi részén helyezkedik el.A barnamezős területen lévő épületben korábban a bányászathoz kötődő tevékenység folyt, a bánya bezárását követően kis részét használták irodaként. Jelenleg rossz állapotban, üresen áll, jelentősen rontva a településképet. A támogatást igénylő a Felhívás 3.1.1. Önállóan támogatható tevékenységek köréből az alábbi tevékenység megvalósítását tervezi: c)I.)1.kereskedelmi és/vagy szolgáltató terek infrastrukturális feltételeinek kialakítása, amelynek keretében a barnamezős terület rehabilitációja által a vállalkozások számára vonzó, munkahelyteremtés céljából alkalmas kereskedelmi és szolgáltató központ kialakítása valósul meg. Kötelezően megvalósítandó tevékenységek a projekt keretében: -akadálymentesítés, -kötelező nyilvánosság a hatályos KTK szerint -parkolót nem létesítünk -energiahatékonyság a hatályos TNM rendelet szerint -partnerségi tervezés A projekt előkészítése/megvalósítása során helyi, civil szervezetek kerülnek bevonásra. -„soft” elemek: környezettudatosság, és integrált szemlélet erősítése a lakosság körében -A projekt előkészítés során igényfelmérési és a kihasználtsági terv készült, pályázathoz csatoljuk. Műszaki tartalom:A projekt keretében Komló Altáró út 2. sz., hrsz: 2413/11 alatti épület energiahatékony üzemeltetést biztosító módon történő felújítása történik meg: A meglévő falszerkezet hőszigetelése, meglévő nyílászárók cseréje, meglévő lapostető szerkezet hőszigetelése. Hőtermelői oldal: épületellátó primer vezetékek kiépítése, szigetelés, hőközpont telepítése. Központi fűtési rendszer: kiépítésre kerülnek a hőközpontból az alapvezetékek a különböző szintekre, ehhez kapcsolódnak igény szerint az egyes egységek bekötő vezetékek. Külön szabályozható hőmennyiségmérővel ellátva. Víz-csatorna rendszer: az előírásoknak megfelelő vizesblokkok kialakítása. Villamos rendszer: A villamos hálózat kiépítése az egyes egységekig tart falban illetve szabadon védőcsőbe szerelve. A fejlesztést követően CC kategóriába fog esni az épület. PF 3.4 pontja szerint: 1.A fejlesztés helyszíne szerepel a város ITS-ében (25.oldal), letölthető az önkormányzat weboldaláról. 2.Az 1. mérföldkő elérésig az önkormányzat tulajdonába kerülő fejlesztéssel érintett ingatlan jelenleg üresen álló, kihasználatlan épületének megújításával kereskedelmi-szolgáltató központ kialakítása történik, így a funkcióváltás biztosított. 3.PF 8. fejezet szerinti útmutató alapján igényfelmérési és kihasználtsági terv készült. 4. Megval. Tanulmányt az 1. mérföldkő elérésekor csatoljuk. 5.Illeszkedik (lásd csatolt barnamezős nyilatkozat) 6.Soft programot tartalmaz a projekt. 7.Nem releváns 8.Partnerségi tervezés előkészítés és megvalósítás során biztosított. 9. A projekt eredményeként olyan új szolgáltatás kialakítására kerül sor, amely az érintett beavatkozási területen jelenleg nem található. 10.Nem releváns 11.Megfelelünk, tételes költségvetést az előírt mérföldkő elérésekor csatoljuk. 12.Szakmai megalapozó dokumentumban bemutatásra kerül. Tartalmi értékelési szempontok: 1. PF célja összhangban van a fejlesztéssel, ITS-ben szerepel, önkormányzat weboldalán elérhető, kizáró okok alá nem tartozik, alulhasznosított épület fejlesztése történik. 2.,3.,4.,5.,6,7.,8.9,10., Igényfelmérés és kihasználtsági terv csatolva, tartalmazza, csak támogatható tevékenységeket terveztünk. 11. Releváns indikátorokra vállalást tettünk. A PF 3.4.1.2 pontban leírtaknak megfelel a projekt és a támogatást igénylő szervezet is. Nyilatkozunk, hogy a beruházásnak nincs előre látható klímakockázata. terület-specifikus értékelési szempontok: 1.1. Illeszkedés a megyei ITP 1. Helyi gazdaságok fejlesztés, ITP 2. Tartós növekedésre képes gazdaság megteremtése, ITP 4. Társadalmi felzárkózás elősegítése, megyei ITP 5. Stratégiai erőforrások fenntartható használata stratégiai célkitűzéséhez. 2.1.A tervezett projekt a 290/2014.(XI. 26.)Korm.Rendelet 3.sz. mellékletében Komló nem szerepel. A 290/2014.(XI.26.)Korm.rendelet 4.sz.melléklete alapján átmenetileg kedvezményezett település. 2.2Lakosságszáma: 23388 fő 3.1.A hasznosítani kívánt barnamezős terület nagysága: 7458 m2 3.2.Az Altáró ipari terület a városközpontban. 3.3.Megújuló energiaforrásokat nem tervezzük. 3.4.Az új funkciók bevételt nem generálnak, munkahelyet teremtenek. 3.5.Az érintett településen a kereskedelmi szálláshelyeken eltöltött vendégéjszakák száma 2013-2015. évek átlagában a 20.001-30.000 db csoportba tartozik. 3.6.A megalapozó dokumentumban kerül bemutatás 4.1.Új profitorientált szolg:1db 4.2.Új munkahelyek jönnek létre (Hungarian)
0 references
The aim of the Municipality is to develop a commercial and service centre that attracts businesses and is suitable for job creation by rehabilitating a brownfield area, with the energy renovation of an empty building. The development is in line with the objectives of the project, the restoration of brownfield site is carried out. Justification for development, location: The brownfield area to be exploited is located in the central part of the city.The building in the brownfield area used mining activities, a small part of which was used as an office after the closure of the mine. It is currently in poor condition, empty, significantly worsening the settlement picture. The applicant is entitled to call 3.1.1. Intends to carry out the following activities from the scope of activities that can be independently supported: (C)I)1.Infrastructural conditions for commercial and/or service spaces, in which a commercial and service centre that attracts businesses and is suitable for job creation through the rehabilitation of the brownfield area. Mandatory activities under the project: accessibility, mandatory public according to the current KTK -we do not set up a parking lot -energy efficiency according to the current Decree of the Minister for Transport — partnership planning The preparation/implementation of the project involves local, non-governmental organisations. — “Soft” elements: environmental awareness and strengthening of an integrated approach among the population — During the preparation of the project, a needs assessment and utilisation plan was prepared and attached to the application. Technical content:In the framework of the project, Komló subtáró út No. 2, hrsz: A building under 2413/11 is refurbished in a way that ensures energy-efficient operation: Thermal insulation of the existing wall structure, replacement of existing doors and windows, thermal insulation of an existing flat roof. Heat producer side: installation of building supply primary wiring, insulation, thermal center installation. Central heating system: the base lines are installed from the heat center to the different levels, and the individual units are connected to it on demand. Equipped with a heat meter that can be adjusted separately. Water-channel system: the construction of water blocks in accordance with the specifications. Electrical system: The construction of the electrical network will last up to each unit in a wall and freely installed in a protective tube. After the development, the building will fall into CC category. Paragraph 3.4 of PF states: 1.The location of the development is included in the city’s ITS (page 25) and can be downloaded from the municipality’s website. 2.According to milestone 1, a commercial service centre will be established by renewing the currently empty, unused building of the property concerned by the municipality’s ownership, thus ensuring a change of function. A needs assessment and utilisation plan has been drawn up on the basis of the guidance set out in Chapter 8 of Chapter 3.PF. 4. With Meg. The study is attached at the time of the 1st milestone. 5.It fits (see attached brownfield declaration) 6.Soft program is included in the project. 7.Not relevant 8.Partnership planning is provided during preparation and implementation. 9. The project will result in the creation of a new service which is currently not located in the area of intervention concerned. 10.Not relevant 11.Accompanies the itemised budget when the required milestone is reached. 12.Professional foundation document is presented. Content assessment criteria: 1. The purpose of PF is in line with the development, is included in ITS, available on the website of the municipality, not subject to exclusion grounds, an under-utilised building is being developed. 2, 3, 4, 5,6,7,8.9,10, enclosed and included, only eligible activities have been planned. 11. We have pledged relevant indicators. The project and the organisation applying for the grant comply with point 3.4.1.2 of the PF. We declare that the investment has no foreseeable climate risk. Area-specific assessment criteria: 1.1. Fit the county ITP 1. Development of local economies, ITP 2. Creating an economy capable of sustained growth, ITP 4. Promoting social catching up, County ITP 5. Sustainable use of strategic resources for its strategic objective. 2.1.The planned project is 290/2014.(XI. 26)No hops are included in Annex 3 to the Government Regulation. It is a temporary beneficiary municipality on the basis of Annex 4 to Government Decree No 290/2014 of 26 November 2014. 2.2Place number: 23388 people 3.1.The size of the brownfield area to be utilised: 7 458 m² 3.2.The altar industrial area in the city center. 3.3.Renewable energy sources are not planned. 3.4.New functions do not generate revenue, create jobs. 3.5.The number of nights spent in commercial accommodation establishments in the municipality concerned is 20,001-30,000 on average for the years 2013-2015. 3.6.T... (English)
9 February 2022
0 references
L’objectif de la municipalité est de développer un centre commercial et de services qui attire les entreprises et qui soit adapté à la création d’emplois en réhabilitant une zone contaminée, avec la rénovation énergétique d’un bâtiment vide. Le développement est conforme aux objectifs du projet, la remise en état des friches industrielles est réalisée. Justification du développement, localisation: La zone des friches industrielles à exploiter est située dans la partie centrale de la ville. Le bâtiment dans la zone de friches a utilisé des activités minières, dont une petite partie a servi de bureau après la fermeture de la mine. Il est actuellement en mauvais état, vide, ce qui aggrave considérablement la situation des colonies. Le demandeur a le droit d’appeler le 3.1.1. A l’intention de mener les activités suivantes dans le cadre d’activités pouvant bénéficier d’un soutien indépendant: C)I)1.Conditions d’infrastructure pour les espaces commerciaux et/ou de services, dans lesquels un centre commercial et de services qui attire les entreprises et qui est adapté à la création d’emplois grâce à la remise en état des friches industrielles. Activités obligatoires dans le cadre du projet: accessibilité, public obligatoire selon l’actuel KTK — nous ne mettons pas en place un parking — efficacité énergétique selon l’actuel décret du ministre des Transports — planification du partenariat La préparation/la mise en œuvre du projet implique des organisations locales et non gouvernementales. — Éléments «douces»: sensibilisation à l’environnement et renforcement d’une approche intégrée auprès de la population — Au cours de la préparation du projet, un plan d’évaluation des besoins et d’utilisation a été élaboré et joint à la demande. Contenu technique:Dans le cadre du projet, Komló subtáró út No 2, hrsz: Un bâtiment sous 2413/11 est rénové de manière à garantir un fonctionnement économe en énergie: Isolation thermique de la structure murale existante, remplacement des portes et fenêtres existantes, isolation thermique d’un toit plat existant. Côté producteur de chaleur: installation du câblage primaire d’alimentation du bâtiment, isolation, installation de centre thermique. Système de chauffage central: les lignes de base sont installées du centre de chaleur aux différents niveaux, et les unités individuelles y sont connectées sur demande. Équipé d’un compteur de chaleur qui peut être réglé séparément. Système de canaux d’eau: la construction de blocs d’eau conformément aux spécifications. Système électrique: La construction du réseau électrique durera jusqu’à chaque unité dans un mur et sera librement installée dans un tube de protection. Après le développement, le bâtiment entrera dans la catégorie CC. Le paragraphe 3.4 de PF dispose ce qui suit: 1.L’emplacement du développement est inclus dans le STI de la ville (page 25) et peut être téléchargé sur le site Web de la municipalité. 2.Conformément à l’étape 1, un centre de services commerciaux sera mis en place en renouvelant le bâtiment actuellement vide et non utilisé du bien concerné par la propriété de la municipalité, assurant ainsi un changement de fonction. Un plan d’évaluation et d’utilisation des besoins a été élaboré sur la base des orientations énoncées au chapitre 8 du chapitre 3.PF. 4. Avec Meg. L’étude est jointe au premier jalon. 5.Il s’adapte (voir la déclaration ci-jointe sur les friches industrielles) 6.Le programme souple est inclus dans le projet. 8.La planification du partenariat est fournie au cours de la préparation et de la mise en œuvre. 9. Le projet aboutira à la création d’un nouveau service qui n’est actuellement pas situé dans la zone d’intervention concernée. 10.Non pertinent 11.Accompagne le budget détaillé lorsque l’étape requise est atteinte. 12.Le document de base professionnel est présenté. Critères d’évaluation du contenu: 1. L’objectif de PF est conforme au développement, est inclus dans les STI, disponible sur le site Web de la municipalité, non soumis à des motifs d’exclusion, un bâtiment sous-utilisé est en cours de développement. 2, 3, 4, 5,6,7,8.9,10, jointes et incluses, seules les activités admissibles ont été planifiées. 11. Nous avons promis des indicateurs pertinents. Le projet et l’organisation sollicitant la subvention sont conformes au point 3.4.1.2 du PF. Nous déclarons que l’investissement ne présente pas de risque climatique prévisible. 1.1. Convient au comté ITP 1. Développement des économies locales, ITP 2. Créer une économie capable d’une croissance soutenue, ITP 4. Promouvoir le rattrapage social, Comté ITP 5. Utilisation durable des ressources stratégiques pour son objectif stratégique. 2.1.Le projet prévu est 290/2014.(XI. 26)aucun houblon ne figure à l’annexe 3 du règlement gouvernemental. Il s’agit d’une municipalité bénéficiaire temporaire sur la base de l’annexe 4 du décret gouvernemental no 290/2014 du 26 novembre 2014. 2.2Numéro du lieu: 23388 personnes 3.1.La taille de la zone de friche à utiliser:... (French)
10 February 2022
0 references
Komló, Baranya
0 references
Identifiers
TOP-2.1.1-16-BA1-2017-00003
0 references