Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 16,072,295.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 45,436.38 Euro / rank | |||||||||||||||
Property / budget: 45,436.38 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 45,436.38 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 8,839,762.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 24,990.01 Euro / rank | |||||||||||||||
Property / EU contribution: 24,990.01 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 24,990.01 Euro / qualifier | |||||||||||||||
|
Revision as of 23:16, 14 February 2022
Project Q3936070 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of Paks and Vidéke ÁFÉSZ Paks, Road 3 building with solar panel system |
Project Q3936070 in Hungary |
Statements
1 April 2021
0 references
30 September 2022
0 references
Paks és Vidéke Általános Fogyasztási és Értékesitő Szövetkezet
0 references
A fejlesztés előkészítését illetően eddig megtörtént a megvalósítási helyszín felmérése, a partnerek való kapcsolatfelvétel, feltételes szerződés aláírása a kivitelezővel. Megkeresésre kerültek a megfelelő szakemberek, akik hozzájárulnak a projekt részleteinek megtervezéséhez. Felkutatásra és kiválasztásra került az illeszkedő végzettséggel rendelkező energetikai szakértő, aki megfelelő kompetenciával rendelkezik a szükséges napelemes rendszerhez, illeszkedve a felhívás által előírt szakmai feltételekhez. Helyszíni bejárás során felmérésre került a megvalósítási helyszín, energetikai, statikai és villámvédelmi szempontból egyaránt. A folyamat soron következő részeként megtervezésre került a telepítendő fotovoltaikus rendszer, és természetesen felkutatásra és végül kiválasztásra került a tapasztalattal rendelkező kivitelező is. Az előkészítési tevékenység során végül elkészült a műszaki leírás, elrendezési terv és energetikai nyilatkozat. A megvalósítás következő lépései, hogy csatlakozási terv dokumentum elkészítése és az áramszolgáltató hozzájárulása a projekthez. Ezt követően történik a megvalósítási helyszín átadása a kivitelezőnek. Szerencsére sikerült olyan kivitelező vállalatot találni, amely jelentős tapasztalattal rendelkezik már korábbi pályázati forrásból kivitelezett napelemes rendszerekkel kapcsolatban, így remélhetőleg a megvalósítás során szakmai probléma nem várható. Amennyiben szükséges, szintén projekt lépéseként, szükség esetén megtörténik a mérőóra cseréje. Az előzetesen felmért megvalósítási helyszín előkészítése történik meg a projekt első lépéseként, ezután a korábban bekért kivitelezési árajánlat adójával kivitelezési szerződés megkötésére kerül sor. A projekt soron következő lépése igénybejelentés megküldése az áramszolgáltatónak hálózati méretű kiserőmű létesítésére. A megjelölt célterületen megvalósuló projektelem: Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából. Az átfogó cél a vállalkozás villamos energia igényének mérséklése, villamos energia fogyasztás részbeni kiváltása hálózati méretű kiserőmű használatával. A vállalkozás éves villamos energia fogyasztása a pályázott telephelyen 131 292 kWh. A projektben telepítendő rendszer segítségével előreláthatólag 63 162 kWh termelés érhető el. A beépítésre kerülő technológia egy 57,42 kWp teljesítményű napelemes rendszer, megújuló energiaforrás kerül tehát alkalmazásra. 198 db napelemes cella kerül felszerelésre. Fedő üveglapja 3,2 mm-es. A cellák méretei: 1650 mm x 992 mm x 35 mm. 290 Wp specifikus teljesítményre képesek. A modulokhoz tartozik alumíniumból készült napelemes tartószerkezet, mely garantálja a szükséges rögzítést a tetőn. Névleges teljesítmény: 290 Wp Technológia: polykristályos napelem. Termékgarancia minimum: 10 év Természetesen a napelemek által előállított egyenáram váltóárammá történő átalakítását végző inverterek is részét képezik a fejlesztésnek. A betervezett inverterek névleges összteljesítménye 50,0kW. A választott inverter a hálózati engedélyes által jóváhagyott berendezések listáján megtalálható. Áramszünet idején az inverternek a vonatkozó szabványok előírásai alapján, a beépített védelem-automatikák segítségével ki kell kapcsolnia, szigetüzemben nem táplálhat a hálózatra. Az inverter saját védelme érdekében csak a hálózati feszültség tartós visszatérésekor (5 perc után) kapcsolhat vissza, az előírt szinkronozási feltételekkel. (Hungarian)
0 references
As far as the preparation of the development is concerned, the site of implementation has been assessed, contact with the partners and the signing of a conditional contract with the contractor have been carried out. Appropriate professionals have been contacted to help plan the details of the project. An energy expert with an appropriate degree has been searched and selected, who has the appropriate competence for the necessary solar system, in line with the professional conditions required by the call. During the on-site visit, the implementation site was surveyed in terms of energy, static and lightning protection. The next part of the process was the design of the photovoltaic system to be installed, and of course the experienced contractor was also searched and finally selected. In the course of the preparatory work, the technical description, layout plan and energy declaration were finally completed. The next steps of the implementation are the preparation of a connection plan document and the contribution of the electricity supplier to the project. The implementation site is then handed over to the contractor. Fortunately, we have been able to find a construction company with significant experience in the field of solar panel systems that have been implemented from a previous tender, so hopefully no professional problems can be expected during the implementation. If necessary, the meter will also be replaced as a step of a project, if necessary. The pre-assessed implementation site is prepared as the first step of the project, after which a construction contract is concluded with the guarantor of the previously requested construction price. The next step of the project is to send a demand report to the electricity supplier for the installation of a small power plant with a grid size. Project element in the indicated target area: Installation of a solar system for electricity generation in the grid. The overall objective is to reduce the company’s demand for electricity and to partially replace electricity consumption by using a small power plant of a grid size. The undertaking’s annual electricity consumption at the tender site is 131 292 kWh. The system to be installed in the project is expected to deliver 63 162 kWh production. The technology to be installed is a solar system with a power of 57.42 kWp, and therefore a renewable energy source is used. 198 solar cells are installed. The glass plate of the lid is 3.2 mm. Dimensions of cells: 1 650 mm x 992 mm x 35 mm. They have a capacity of 290 Wp specific performance. The modules include an aluminium solar support structure that guarantees the necessary fixation on the roof. Rated power: 290 Wp Technology: polycrystalline solar panel. Product guarantee minimum: 10 years Of course, inverters for converting direct current produced by solar panels into AC current are also part of the development. The total rated power of the designed inverters is 50.0 kW. The chosen inverter can be found in the list of equipment approved by the network licensee. In the event of a power outage, the inverter shall be switched off by means of built-in protection machines, in accordance with the requirements of the relevant standards, and shall not be supplied to the network in isolated mode. To protect the inverter, it can only be switched back on a permanent return of the mains voltage (after 5 minutes) with the required synchronisation conditions. (English)
8 February 2022
0 references
En ce qui concerne la préparation du développement, le site de mise en œuvre a été évalué, les contacts avec les partenaires et la signature d’un contrat conditionnel avec le contractant ont été effectués. Des professionnels compétents ont été contactés pour aider à planifier les détails du projet. Un expert en énergie possédant un diplôme approprié a été recherché et sélectionné, qui possède les compétences appropriées pour le système solaire nécessaire, conformément aux conditions professionnelles requises par l’appel. Au cours de la visite sur place, le site de mise en œuvre a été étudié en termes d’énergie, de protection statique et de protection contre la foudre. La partie suivante du processus a été la conception du système photovoltaïque à installer, et bien sûr l’entrepreneur expérimenté a également été recherché et finalement sélectionné. Au cours des travaux préparatoires, la description technique, le plan de mise en page et la déclaration énergétique ont finalement été achevés. Les prochaines étapes de la mise en œuvre sont l’élaboration d’un document de plan de raccordement et la contribution du fournisseur d’électricité au projet. Le site de mise en œuvre est ensuite remis au contractant. Heureusement, nous avons été en mesure de trouver une entreprise de construction avec une expérience significative dans le domaine des systèmes de panneaux solaires qui ont été mis en œuvre dans le cadre d’un appel d’offres précédent, donc espérons qu’aucun problème professionnel ne peut être attendu pendant la mise en œuvre. Si nécessaire, le compteur sera également remplacé en tant qu’étape d’un projet, si nécessaire. Le site de mise en œuvre préévalué est préparé comme première étape du projet, après quoi un contrat de construction est conclu avec le garant du prix de construction précédemment demandé. L’étape suivante du projet consiste à envoyer un rapport de demande au fournisseur d’électricité pour l’installation d’une petite centrale électrique d’une taille de réseau. Élément de projet dans la zone cible indiquée: Installation d’un système solaire pour la production d’électricité dans le réseau. L’objectif global est de réduire la demande d’électricité de l’entreprise et de remplacer partiellement la consommation d’électricité par l’utilisation d’une petite centrale électrique d’une taille de réseau. La consommation annuelle d’électricité de l’entreprise sur le site de l’appel d’offres est de 131 292 kWh. Le système qui sera installé dans le projet devrait permettre une production de 63 162 kWh. La technologie à installer est un système solaire d’une puissance de 57,42 kWc, et donc une source d’énergie renouvelable est utilisée. 198 cellules solaires sont installées. La plaque de verre du couvercle est de 3,2 mm. Dimensions des cellules: 1 650 mm x 992 mm x 35 mm. Ils ont une capacité de 290 Wp performances spécifiques. Les modules comprennent une structure de support solaire en aluminium qui garantit la fixation nécessaire sur le toit. Puissance nominale: Technologie 290 Wp: panneau solaire polycristallin. Garantie de produit minimum: 10 ans Bien sûr, les onduleurs pour convertir le courant direct produit par les panneaux solaires en courant alternatif font également partie du développement. La puissance nominale totale des onduleurs conçus est de 50,0 kW. L’onduleur choisi se trouve dans la liste des équipements approuvés par le titulaire de licence de réseau. En cas de panne de courant, l’onduleur doit être éteint au moyen de machines de protection intégrées, conformément aux exigences des normes applicables, et ne doit pas être fourni au réseau en mode isolé. Pour protéger l’onduleur, il ne peut être remis en marche que sur un retour permanent de la tension du secteur (après 5 minutes) avec les conditions de synchronisation requises. (French)
10 February 2022
0 references
Paks, Tolna
0 references
Identifiers
GINOP-4.1.4-19-2020-03348