Complex energy development of Ring Autóház Kft. (Q3935239): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Removed claims)
Property / co-financing rate
55.0 percent
Amount55.0 percent
Unitpercent
 
Property / co-financing rate: 55.0 percent / rank
Normal rank
 
Property / budget
103,704,928.0 forint
Amount103,704,928.0 forint
Unitforint
 
Property / budget: 103,704,928.0 forint / rank
Normal rank
 
Property / budget
293,173.83 Euro
Amount293,173.83 Euro
UnitEuro
 
Property / budget: 293,173.83 Euro / rank
Preferred rank
 
Property / budget: 293,173.83 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / budget: 293,173.83 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
57,037,710.0 forint
Amount57,037,710.0 forint
Unitforint
 
Property / EU contribution: 57,037,710.0 forint / rank
Normal rank
 
Property / EU contribution
161,245.61 Euro
Amount161,245.61 Euro
UnitEuro
 
Property / EU contribution: 161,245.61 Euro / rank
Preferred rank
 
Property / EU contribution: 161,245.61 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / EU contribution: 161,245.61 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 22:57, 14 February 2022

Project Q3935239 in Hungary
Language Label Description Also known as
English
Complex energy development of Ring Autóház Kft.
Project Q3935239 in Hungary

    Statements

    0 references
    1 October 2020
    0 references
    30 September 2022
    0 references
    RING AUTÓHÁZ Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°10'31.66"N, 20°11'40.85"E
    0 references
    Az 1998. illetve 2002. években épült épületek az építés éveiben korszerű anyagok felhasználásával épültek, de a jelenlegi energetikai követelményeknek már nem felelnek meg, elavultnak számítanak. Az épület felmenő falazata Porotherm 30 NF égetett vázkerámia, kétoldalt vakolva, a bejárati homlokzat mészhomok tégla boritást kapott. A tégla borítású homlokzat kivételével a külső oldalon 15 cm vastag EPS 80 típusú hőszigetelő rendszer került betervezésre. A 2 épületre összesen 854,88 nm függőleges szigetelés került kalkulálásra 10.600 Ft/nm egységáron. Az épület felső térelhatárolását a tető adja, amely belső gipszkarton borítás fölött 5 cm hőszigeteléssel és külső oldalán LINDAB lemez borítással készült. A jelenlegi héjazat elbontásra kerül és 13 cm vastag tető szendvicspanel borítást kap. A 2 épületre összesen 2281 nm vízszintes szigetelés került kalkulálásra 14.000 Ft/nm egységáron. A meglévő nyílászárók elavultak, elhasználódtak, ezért PVC keretszerkezetű, 3 rétegű üvegezésű nyílászárókra lesznek cserélve. A 2 épületre összesen 330,6 nm nyílászáró került kalkulálásra 67600 Ft/nm egységáron. Az épületek fűtési hőenergia igényét 1-1 db állandó hőmérsékletű, földgáz tüzelésű kazán biztosítja, amelyeket kondenzációs kazánra cserélünk. A fűtési rendszert az új kondenzációs technológiát használó kazánhoz kell igazitani szükség szerint. A kazán szabályozása külső hőmérséklet függvényében tervezett. Komplett fűtéskorszerűsítés fog megvalósulni. Az egyes helyiségekben a fűtést gázüzemű sötétensugárzó és hőlégfúvó berendezések biztosítják, így a FIAT szalon szervizben, valamint a SUZUKI szalon karosszéria- és festőműhelyben. Ezért komplett fűtéskorszerűsítést megvalósítva a fűtőtestek cseréje is megtörténik új, korszerű, melegvizes termoventillátorokra automatizált hőfokszabályzással, új csővezeték hálózat kiépítésével, amely csatlakozik az új, beépítésre kerülő kondenzációs kazán fűtési hálózatára. A 2 épületre összesen 7532 m3 légtér fűtéskorszerűsítése került kalkulálásra 2019,734 Ft/m3 egységáron. Az épületekben az építés idején beszerelt világító testek találhatóak, amelyeket korszerű, energiatakarékos világító testekre cserélnek (pl. LED). A 2 épületre összesen 2436 nm alapterület világítás korszerűsítése került kalkulálásra 5249,589 Ft/nm egységáron. A magas energiafogyasztás indokolja a megújuló energia felhasználást, amelyet összesen 40,42 kw napelemes rendszerrel, 305 789,21 Ft/kw egységáron kívánunk biztosítani a Suzuki épülettömbön, és annak, a projekt során különválasztandó villamos energiaigényét kívánjuk biztosítani. (Hungarian)
    0 references
    The buildings built in 1998 and 2002 were built in the years of construction using state-of-the-art materials, but they no longer meet the current energy requirements and are considered obsolete. Porotherm 30 NF burnt vascular ceramics, plastered on both sides, the front facade has a lime-sand brick finish. With the exception of the brick-covered facade, a 15 cm thick EPS 80 thermal insulation system was designed on the outside. A total of 854.88 sqm vertical insulation was calculated for the 2 buildings at a unit price of HUF 10.600/nm. The upper delimitation of the building is provided by the roof, which is made with 5 cm thermal insulation and LINDAB plate over the interior plasterboard covering on the outside. The current shell is removed and a 13 cm thick roof sandwich panel is covered. A total of 2281 nm horizontal insulation was calculated for the 2 buildings at a unit price of 14.000 HUF/nm. The existing doors and windows are outdated and worn out, so they will be replaced by PVC framed windows with 3 layers of glazed windows. A total of 330,6 sqm doors and windows were calculated for the 2 buildings at a unit price of 67 600 HUF/nm. The heating thermal energy demand of the buildings is provided by a natural gas fuel boiler with a constant temperature, which is replaced by a condensing boiler. The heating system must be authenticated as necessary for the boiler using the new condensing technology. The boiler is regulated according to external temperature. Complete heating upgrade will be implemented. Heating is provided by gas-fired dark and hot-air heaters, including the FIAT salon service and the SUZUKI salon in the body and painting workshop. For this reason, complete heating upgrades will also be replaced with new, modern hot water thermovolveilators with automated temperature control and the construction of a new pipeline network that connects to the heating network of the new condensing boiler to be installed. For the 2 buildings a total of 7 532 m³ of airspace was upgraded at a unit price of HUF 734/m³. Buildings have lighting bodies installed at the time of construction and are replaced with modern, energy-saving lighting bodies (e.g. LEDs). A total of 2436 sqm lighting was calculated for 2 buildings at a unit price of HUF 5249,589/nm. The high energy consumption justifies the use of renewable energy, which we intend to provide with a total of 40,42 kw solar panel system, at a unit price of HUF 305 789.21/kw on the Suzuki building block, and to ensure its electricity demand to be separated during the project. (English)
    8 February 2022
    0 references
    Les bâtiments construits en 1998 et 2002 ont été construits au cours des années de construction à l’aide de matériaux de pointe, mais ils ne répondent plus aux besoins énergétiques actuels et sont considérés comme obsolètes. Porotherm 30 NF céramique vasculaire brûlée, plâtre sur les deux côtés, la façade avant a une finition en brique de sable de chaux. À l’exception de la façade recouverte de briques, un système d’isolation thermique EPS 80 d’épaisseur de 15 cm a été conçu à l’extérieur. Un total de 854,88 m² d’isolation verticale a été calculé pour les 2 bâtiments à un prix unitaire de 10 600 HUF/nm. La délimitation supérieure du bâtiment est assurée par le toit, qui est réalisé avec une isolation thermique de 5 cm et une plaque LINDAB au-dessus du revêtement intérieur en plaques de plâtre à l’extérieur. La coque actuelle est enlevée et un panneau sandwich de 13 cm d’épaisseur est couvert. Un total de 2281 nm d’isolation horizontale a été calculé pour les 2 bâtiments à un prix unitaire de 14,000 HUF/nm. Les portes et fenêtres existantes sont dépassées et usées, de sorte qu’elles seront remplacées par des fenêtres encadrées en PVC avec 3 couches de fenêtres vitrées. Un total de 330,6 m² de portes et fenêtres ont été calculés pour les 2 bâtiments à un prix unitaire de 67 600 HUF/nm. La demande d’énergie thermique pour le chauffage des bâtiments est assurée par une chaudière au gaz naturel à température constante, remplacée par une chaudière à condensation. Le système de chauffage doit être authentifié en tant que de besoin pour la chaudière à l’aide de la nouvelle technologie de condensation. La chaudière est régulée en fonction de la température extérieure. Une modernisation complète du chauffage sera mise en œuvre. Le chauffage est assuré par des appareils de chauffage à gaz sombre et à air chaud, y compris le service de salon FIAT et le salon SUZUKI dans l’atelier de carrosserie et de peinture. Pour cette raison, des améliorations complètes du chauffage seront également remplacées par de nouveaux thermovolveilateurs modernes à eau chaude dotés d’un contrôle automatisé de la température et la construction d’un nouveau réseau de canalisations qui se connecte au réseau de chauffage de la nouvelle chaudière à condensation à installer. Pour les deux bâtiments, un total de 7 532 m³ d’espace aérien a été modernisé à un prix unitaire de 734 HUF/m³. Les bâtiments ont des corps d’éclairage installés au moment de la construction et sont remplacés par des corps d’éclairage modernes et économes en énergie (par exemple LED). Un total de 2 436 m² d’éclairage a été calculé pour 2 bâtiments à un prix unitaire de 529 589 HUF/nm. La forte consommation d’énergie justifie l’utilisation d’énergies renouvelables, que nous avons l’intention de fournir avec un total de 40,42 kw système de panneaux solaires, à un prix unitaire de 305 789,21 HUF/kw sur le bâtiment Suzuki, et d’assurer la séparation de sa demande d’électricité pendant le projet. (French)
    10 February 2022
    0 references
    Szolnok, Jász-Nagykun-Szolnok
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02261
    0 references