Energy development of TECHNOMET Kft. (Q3935189): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Removed claims)
Property / co-financing rate
55.0 percent
Amount55.0 percent
Unitpercent
 
Property / co-financing rate: 55.0 percent / rank
Normal rank
 
Property / budget
15,060,000.0 forint
Amount15,060,000.0 forint
Unitforint
 
Property / budget: 15,060,000.0 forint / rank
Normal rank
 
Property / budget
42,574.62 Euro
Amount42,574.62 Euro
UnitEuro
 
Property / budget: 42,574.62 Euro / rank
Preferred rank
 
Property / budget: 42,574.62 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / budget: 42,574.62 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
8,283,000.0 forint
Amount8,283,000.0 forint
Unitforint
 
Property / EU contribution: 8,283,000.0 forint / rank
Normal rank
 
Property / EU contribution
23,416.04 Euro
Amount23,416.04 Euro
UnitEuro
 
Property / EU contribution: 23,416.04 Euro / rank
Preferred rank
 
Property / EU contribution: 23,416.04 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / EU contribution: 23,416.04 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 22:56, 14 February 2022

Project Q3935189 in Hungary
Language Label Description Also known as
English
Energy development of TECHNOMET Kft.
Project Q3935189 in Hungary

    Statements

    0 references
    4 February 2021
    0 references
    31 December 2021
    0 references
    TECHNOMET Technológiai és Mérésügyi Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°36'41.87"N, 21°20'37.46"E
    0 references
    Az előző pontokban írtaknak megfelelően pályázatunk teljes egészében a 7120 teáor számú műszaki vizsgálat, elemzés tevékenységünket kívánjuk fejleszteni. A pályázat keretein belül csupán egy épületünk (amely a telephelyünkön található) energetikai fejlesztését hajtjuk végre, amelyben napelem rendszer telepítésével kapcsolatos kivitelezés valósul meg. A megújuló energiaforrások kiaknázása révén a fenntartási kiadások idővel minimalizálódnak, az így megtakarítást pedig egyéb fontos célokra fordíthatjuk. Közvetlen célként magának az épületnek a kor követelményeinek való megfeleltetése jelenik meg, ami közvetett módon a kiadások csökkentése révén hozzájárul majd cégünk további fejlesztési terveinek finanszírozásához. Rövidtávon mindenképpen szükséges a kiadások csökkentése. A 4060 Balmazújváros, Böszörményi út 57. szám alatt található telephelyünk épületére történne egy 53,1 kWp -os teljesítményű napelem rendszer telepítése, amely 180 db Suntech STP 295 W napelem modulból, 2 db Solar Edge inverterből áll, illetve a telepítéshez szükséges egyéb tételekből tevődik össze. Jelen fejlesztés cégünk részére olyan beruházást tesz lehetővé, melynek eredményeképpen a telephelyünkön használt meglévő és új elektromos gépek egyre növekvő energia használatát, és az ezzel járó magas kiadásokat kívánjuk a jövőben csökkenteni, ill. részben megszüntetni. Az energetikai fejlesztés részeként elszámolásra csupán a napelem rendszer telepítésének anyag és munkadíj költsége kerül. Az érintett épület vonatkozásában korábban nem történt műszaki előkészület az épület igényfelmérésén kívül. Jelen korszerűsítés nem építési engedélyköteles beruházás. A projekt megalapozottsága érdekében kivitelezői árajánlat került összeállításra, illetve energetikai tanúsítvány készítése történt a pályázat benyújtásához. A pályázatban szereplő ingatlan korszerűsítése, fejlesztése piaci pozíciónk erősítését fogja szolgálni. Ezen fejlesztés eredményeként a főtevékenységünknek szeretnénk hazai és akár nemzetközi szinten egy modern, költséghatékony környezetet létrehozni, melynek köszönhetően alkalmazottaink és hozzánk érkező szállítóink elégedettsége is javulni fog. Meglévő munkavállalói létszámunk el tudja látni megrendeléseink kiszolgálását. A társaságunk jelenleg is foglalkoztat megfelelő tapasztalattal rendelkező munkavállalót, aki a projekt zavartalan lebonyolításához szükséges tapasztalattal rendelkezik. A jelentős tapasztalatunknak köszönhetően gyorsan és zökkenőmentesen meg tudjuk valósítani a projektet. A projekt eredményeinknek fenntarthatóságát, az üzemeltetési költségek pénzügyi fedezetét a fejlesztésnek köszönhető kiadáscsökkentés, valamint bevétel növekedés nyomán cégünk biztosítani tudja. Cégünk rendelkezik azokkal a szakmai kapacitásokkal, amelyek a projekt eredményeinek ellátásához, illetve azok üzemeltetéséhez szükségesek. (Hungarian)
    0 references
    As set out in the previous points, our tender is intended to develop our technical examination and analysis activities in its entirety, No 7120 TEÁOR. Within the framework of the tender, we only carry out the energy development of one building (which is located on our site) in which the installation of a solar panel system is carried out. By exploiting renewable energy sources, maintenance costs are minimised over time and savings can be used for other important purposes. The direct aim of the building itself is to meet the requirements of the age, which will contribute indirectly to the financing of our company’s further development plans by reducing expenditure. It is absolutely necessary to reduce expenditure in the short term. A 53.1 kWp solar panel system consisting of 180 Suntech STP 295 W solar panel modules, 2 Solar Edge inverters and other items needed for installation would be installed on our site at 4060 Balmazújváros, Böszörményi út 57. The present development enables our company to invest in an ever-increasing energy use of existing and new electric machines used on our site, and the associated high costs will be reduced or partially eliminated in the future. As part of the energy development, only the cost of materials and fees for installing the solar panel system is charged. The building concerned has not previously been subject to technical preparation other than the needs assessment of the building. This upgrading is not subject to construction permit. In order to ensure that the project is well founded, a bid from the contractors has been compiled and an energy certificate has been drawn up for the submission of the tender. The modernisation and development of the property included in the tender will serve to strengthen our market position. As a result of this development, we want to create a modern, cost-effective environment for our main activity at domestic and even international level, thanks to which the satisfaction of our employees and our suppliers will improve. Our existing number of employees can serve our orders. Our company currently employs an employee with appropriate experience, who has the necessary experience for the smooth running of the project. Thanks to our considerable experience, we can quickly and seamlessly implement the project. Our company can ensure the sustainability of our project results, the financial coverage of the operating costs due to the reduction of expenditure due to the development and the increase in revenue. Our company has the professional capacities necessary to deliver the results of the project and to operate them. (English)
    8 February 2022
    0 references
    Comme indiqué dans les points précédents, notre offre vise à développer l’ensemble de nos activités d’examen et d’analyse techniques, no 7120 TEÁOR. Dans le cadre de l’appel d’offres, nous n’effectuons que le développement énergétique d’un bâtiment (qui est situé sur notre site) dans lequel est réalisée l’installation d’un système de panneaux solaires. En exploitant les sources d’énergie renouvelables, les coûts d’entretien sont réduits au minimum au fil du temps et les économies peuvent être utilisées à d’autres fins importantes. L’objectif direct du bâtiment lui-même est de répondre aux exigences de l’âge, ce qui contribuera indirectement au financement des plans de développement ultérieurs de notre entreprise en réduisant les dépenses. Il est absolument nécessaire de réduire les dépenses à court terme. Un système de panneaux solaires de 53,1 kWp comprenant 180 modules Suntech STP 295 W, 2 onduleurs Solar Edge et d’autres éléments nécessaires à l’installation serait installé sur notre site au 4060 Balmazújváros, Böszörményi út 57. Le développement actuel permet à notre entreprise d’investir dans une utilisation toujours croissante de l’énergie des machines électriques existantes et nouvelles utilisées sur notre site, et les coûts élevés qui en découlent seront réduits ou partiellement éliminés à l’avenir. Dans le cadre du développement énergétique, seul le coût des matériaux et les frais d’installation du système de panneaux solaires sont facturés. Le bâtiment concerné n’a auparavant fait l’objet d’aucune préparation technique autre que l’évaluation des besoins du bâtiment. Cette réfection n’est pas assujettie à un permis de construction. Afin de garantir le bien-fondé du projet, une offre des contractants a été élaborée et un certificat énergétique a été établi pour la soumission de l’offre. La modernisation et l’aménagement du bien inclus dans l’appel d’offres serviront à renforcer notre position sur le marché. Grâce à ce développement, nous voulons créer un environnement moderne et rentable pour notre activité principale au niveau national et même international, grâce auquel la satisfaction de nos employés et de nos fournisseurs s’améliorera. Notre nombre actuel d’employés peut servir nos commandes. Notre entreprise emploie actuellement un employé ayant l’expérience appropriée, qui possède l’expérience nécessaire au bon déroulement du projet. Grâce à notre expérience considérable, nous pouvons mettre en œuvre le projet de manière rapide et transparente. Notre société peut assurer la durabilité des résultats de notre projet, la couverture financière des coûts d’exploitation en raison de la réduction des dépenses dues au développement et à l’augmentation des revenus. Notre société a les capacités professionnelles nécessaires pour livrer les résultats du projet et de les exploiter. (French)
    10 February 2022
    0 references
    Balmazújváros, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02180
    0 references