Building a solar system at Karczub and Társa Bt. (Q3935033): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
55.0 percent
Amount55.0 percent
Unitpercent
Property / co-financing rate: 55.0 percent / rank
 
Normal rank
Property / budget
 
14,445,700.0 forint
Amount14,445,700.0 forint
Unitforint
Property / budget: 14,445,700.0 forint / rank
 
Normal rank
Property / budget
 
40,837.99 Euro
Amount40,837.99 Euro
UnitEuro
Property / budget: 40,837.99 Euro / rank
 
Preferred rank
Property / budget: 40,837.99 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 40,837.99 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
7,945,135.0 forint
Amount7,945,135.0 forint
Unitforint
Property / EU contribution: 7,945,135.0 forint / rank
 
Normal rank
Property / EU contribution
 
22,460.9 Euro
Amount22,460.9 Euro
UnitEuro
Property / EU contribution: 22,460.9 Euro / rank
 
Preferred rank
Property / EU contribution: 22,460.9 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 22,460.9 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:52, 14 February 2022

Project Q3935033 in Hungary
Language Label Description Also known as
English
Building a solar system at Karczub and Társa Bt.
Project Q3935033 in Hungary

    Statements

    0 references
    7,945,135.0 forint
    0 references
    22,460.9 Euro
    0.002827 Euro
    14 February 2022
    0 references
    14,445,700.0 forint
    0 references
    40,837.99 Euro
    0.002827 Euro
    14 February 2022
    0 references
    55.0 percent
    0 references
    1 July 2020
    0 references
    31 December 2021
    0 references
    Karczub és Társa Fafeldolgozó és Szolgáltató Betéti Társaság
    0 references
    0 references

    47°48'24.95"N, 22°12'6.62"E
    0 references
    A fejleszteni kívánt tevékenységi kör a TEAOR 16.10. – Fűrészárú gyártás. A fejlesztés célja a villamos energia ellátás fejlesztése napelemes rendszer telepítésével. Az épületben fűrészüzem működik, melynek energiaellátása a cél. A fejlesztés részletes szakmai tartalma az előző pontban részletesen bemutatásra kerül. A projekt előkészítés során megvizsgáltuk a fogyasztást az áramszámlák feldolgozásával. A tervezésekor egyeztettünk energetikussal, hogy a csatlakozási teljesítményt 20%-nál nagyobb mértékben ne haladhatja meg a beépített napelemek összesített névleges teljesítménye. Figyeltünk arra, hogy az termelhető villamos energia mennyisége ne haladja meg a fejlesztés utáni éves villamosenergia-igényt. A létesítés nem építési engedély köteles. A tervek elkészültek, csatoltuk. A megvalósíthatóság szempontjából kivitelezővel is egyeztettünk, a műszaki tartalom kialakítása ez alapján történt. A projekt nyertessége esetén a legfontosabb lépés a szerződéskötés a kivitelezővel, a projekt megvalósítása és az elszámolás a projektben tervezett határidőn belül. A projektmenedzsment tagjainak több éves tapasztalata van európai uniós projektek megvalósításában. Számtalan sikeresen végrehajtott projektet valósítottak meg és számoltak el a támogató felé. A támogatás minden esetben maradéktalanul kifizetésre került. A kialakításra kerülő projektelem a Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából. A tervezett rendszer teljesítménye 50 kWp névleges teljesítményű. A rendszerek elemeinek beszerzése és telepítése; a kapcsolódó szerkezeti- és tartóelemek beszerzése és telepítése, az épület elektromos rendszeréhez illetve a hálózathoz való csatlakozáshoz és a műszakilag biztonságos működéshez szükséges elemek beszerzése és ezek kiépítése és a mérő- és szabályozó berendezések beszerzése és felszerelése történik meg. A napelemes rendszer kizárólag a fejlesztéssel érintett ingatlanon lévő épületek tetőszerkezetén kerül elhelyezésre. A telepítési hely: 4341 Nyírvasvári, Móricz Zsigmond út 15. 680 hrsz. A 178 db egyenként 330 kwp teljesítményű napelem rögzítése solar lemeztető tartószerkezettel történik. Feladatuk az energiatermelés. Az inverter feladata a termelt elektromos energia hálózatba táplálása. DC oldali csatlakozók, vezetékek: MC4; kettősszigetelésű (1000V DC) 6 mm2 szolár vezeték. DC oldali védelem: mivel párhuzamosan kialakított 3 string lesz, így a DC oldalon zárlatvédelem kialakítása szükséges. Túlfeszültségvédelem DC oldalon 2-es típusú (nincs villámhárító az épületen) levezetőkkel megoldva. DC csatlakozó doboz telepítési helye az inverter mellett, IP 65-ös védettséggel; ÉV II. A csatlakozó dobozban DC szakaszoló kapcsoló (min. 80A); EPH sín; csatlakozó eszközök (sorkapcsok) kerülnek elhelyezésre. AC oldalon az inverter fix bekötéssel csatlakozik a 0,4 kV-os hálózathoz, csatlakozó dobozon keresztül. Túlfeszültségvédelem 2-es típusú levezetőkkel az inverter bemenet felé. Az AC csatlakozó szekrény az inverter mellett kerül elhelyezésre. 3db Santon tűzvédelmi kapcsoló 4P DFS HP-14 MC4 a napelemek közvetlen közelében kerülnek elhelyezésre. (Hungarian)
    0 references
    The scope of activity to be developed is TEAOR 16.10. — Lumber manufacturing. The aim of the development is to develop electricity supply by installing a solar system. The building has a sawmill, whose energy supply is intended. The detailed technical content of the development is described in detail in the previous section. During the preparation of the project, we examined the consumption by processing the electricity bills. At the time of design, we agreed with an energetician to ensure that the connection power should not exceed the combined rated power of the solar panels by more than 20 %. We have observed that the amount of electricity that can be generated does not exceed the annual electricity demand after development. Construction is not required by a building permit. The plans are complete, attached. From the point of view of feasibility, we also consulted with the contractor, and the technical content was developed on this basis. In the case of the project’s success, the most important step is the contract with the contractor, the implementation of the project and the settlement within the deadline foreseen in the project. Project management members have several years of experience in implementing EU projects. A number of successfully implemented projects have been implemented and accounted to the donor. In all cases, the aid has been paid in full. The project element to be developed is the installation of the solar panel system for electricity generation in the grid. The rated power of the system is 50 kWp. Acquisition and installation of components of the systems; the purchase and installation of the related structural and support elements, the purchase and installation of the elements necessary for connection to the building’s electrical system and for connection to the grid and for technically safe operation, and the purchase and installation of measuring and control equipment. The solar system is installed only on the roofing of buildings on the property concerned by the development. Location of installation: 4341 Nyírvasvári, Móricz Zsigmond street 15. 680 hrs. The 178 solar panels with a power of 330 kwp are fixed with a solar plate cap. Their task is to produce energy. The task of the inverter is to feed the generated electricity into the grid. DC side connectors, wiring: MC4; double-insulated (1000V DC) 6 mm² solar wire. DC side protection: as there will be 3 strings in parallel, the DC side will need to have fault protection. Overvoltage protection on the DC side with type 2 (no lightning rod on the building) conductors solved. DC connector box installation location next to the inverter with IP 65 protection; YEAR II DC disconnection switch in the coupling box (min. 80A); EPH rail; connecting devices (line clamps) are installed. On the AC side, the inverter connects to the 0.4 kV network with a fixed connection via a connecting box. Surge protection with type 2 conductors towards the inverter input. The AC connector cabinet is placed next to the inverter. 3pcs Santon fire protection switch 4P DFS HP-14 MC4 is placed in the immediate vicinity of solar panels. (English)
    8 February 2022
    0 references
    Le champ d’activité à développer est TEAOR 16.10. — Fabrication de bois d’oeuvre. L’objectif du développement est de développer l’approvisionnement en électricité par l’installation d’un système solaire. Le bâtiment dispose d’une scierie dont l’approvisionnement énergétique est prévu. Le contenu technique détaillé du développement est décrit en détail dans la section précédente. Lors de la préparation du projet, nous avons examiné la consommation en traitant les factures d’électricité. Au moment de la conception, nous avons convenu avec un energyien de s’assurer que la puissance de connexion ne devrait pas dépasser de plus de 20 % la puissance nominale combinée des panneaux solaires. Nous avons observé que la quantité d’électricité qui peut être produite ne dépasse pas la demande annuelle d’électricité après le développement. La construction n’est pas requise par un permis de construire. Les plans sont complets, joints en annexe. Du point de vue de la faisabilité, nous avons également consulté le contractant, et le contenu technique a été développé sur cette base. En cas de succès du projet, l’étape la plus importante est le contrat avec le contractant, la mise en œuvre du projet et le règlement dans le délai prévu dans le projet. Les membres chargés de la gestion de projets possèdent plusieurs années d’expérience dans la mise en œuvre de projets de l’UE. Un certain nombre de projets exécutés avec succès ont été mis en œuvre et comptabilisés auprès du donateur. Dans tous les cas, l’aide a été versée intégralement. L’élément de projet à développer est l’installation du système de panneaux solaires pour la production d’électricité dans le réseau. La puissance nominale du système est de 50 kWp. L’acquisition et l’installation de composants des systèmes; l’achat et l’installation des éléments structurels et de soutien correspondants, l’achat et l’installation des éléments nécessaires au raccordement au système électrique du bâtiment et au raccordement au réseau et à l’exploitation techniquement sûre, ainsi que l’achat et l’installation d’équipements de mesure et de contrôle. Le système solaire n’est installé que sur la toiture des bâtiments de la propriété concernée par le développement. Emplacement de l’installation: 4341 Nyírvasvári, rue Móricz Zsigmond 15. 680 heures. Les 178 panneaux solaires d’une puissance de 330 kWp sont fixés avec un bouchon de plaque solaire. Leur tâche est de produire de l’énergie. La tâche de l’onduleur est d’alimenter l’électricité produite dans le réseau. Connecteurs latéraux CC, câblage: MC4; double isolation (1000V DC) fil solaire de 6 mm². Protection latérale DC: comme il y aura 3 chaînes en parallèle, le côté DC devra avoir une protection contre les défauts. Protection contre les surtensions du côté DC avec des conducteurs de type 2 (pas de foudre sur le bâtiment) résolus. Emplacement de l’installation de la boîte de connecteur CC à côté de l’onduleur avec protection IP 65; ANNÉE II Interrupteur de déconnexion CC dans la boîte d’attelage (min. 80A); Rail Eph; des dispositifs de connexion (serrures de ligne) sont installés. Côté AC, l’onduleur se connecte au réseau 0,4 kV avec une connexion fixe via une boîte de connexion. Protection contre les surtensions avec conducteurs de type 2 vers l’entrée de l’onduleur. L’armoire de connecteur AC est placée à côté de l’onduleur. 3pcs Santon interrupteur de protection incendie 4P DFS HP-14 MC4 est placé dans le voisinage immédiat des panneaux solaires. (French)
    10 February 2022
    0 references
    Nyírvasvári, Szabolcs-Szatmár-Bereg
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01947
    0 references