Installation of solar system at IZSÁK-KENYÉR Kft _x000D_ (Q3934887): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
55.0 percent
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
15,475,000.0 forint
| |||||||||||||||
Property / budget: 15,475,000.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
43,747.83 Euro
| |||||||||||||||
Property / budget: 43,747.83 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 43,747.83 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 43,747.83 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
8,511,250.0 forint
| |||||||||||||||
Property / EU contribution: 8,511,250.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
24,061.3 Euro
| |||||||||||||||
Property / EU contribution: 24,061.3 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 24,061.3 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 24,061.3 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
|
Revision as of 22:49, 14 February 2022
Project Q3934887 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of solar system at IZSÁK-KENYÉR Kft _x000D_ |
Project Q3934887 in Hungary |
Statements
8,511,250.0 forint
0 references
15,475,000.0 forint
0 references
55.0 percent
0 references
12 January 2021
0 references
30 June 2021
0 references
IZSÁK-KENYÉR Általános Kereskedelmi, Szolgáltató és Pénzügyi Tanácsadó-Könyvelő Korlátolt Felelősségű Társaság
0 references
A projekt megvalósítása során egy napelemes rendszer beszerzése és telepítése valósul meg; továbbá a kapcsolódó szerkezeti- és tartóelemek beszerzése és telepítése, az épület elektromos rendszeréhez illetve a hálózathoz való csatlakozáshoz és a műszakilag biztonságos működéshez szükséges elemek beszerzése és ezek kiépítése. A napelemes rendszer kizárólag a fejlesztéssel érintett épület tetőszerkezetén kerül elhelyezésre. A szükséges fogyasztás a 2019-es év fogyasztási adatai alapján lettek kalkulálva. Korábban az épületen napelemes rendszer nem működött. A projekt előkészítésekor, pályázat benyújtása előtt felmérésre került a napelemes rendszernek kiépítés, műszakilag és gazdaságilag is. Építész segítségével megterveztük a beruházás megvalósítását, az elkészült terveket a pályázathoz mellékeltük. A beruházást a támogatói döntést követően kezdjük meg, a szükséges E-On és engedélyezési dokumentációval együtt. (Hungarian)
0 references
The acquisition and installation of a solar system is carried out during the implementation of the project; in addition, the purchase and installation of related structural and support elements, the purchase and construction of the elements necessary for connection to the building’s electrical system and the grid and for technically safe operation. The solar system is installed only on the roof of the building concerned by the development. The consumption required was calculated on the basis of consumption data for 2019. Previously, there was no solar system on the building. At the time of the preparation of the project, prior to the submission of the application, the installation of the solar system was assessed, both technically and economically. With the help of an architect, we planned the implementation of the project, and we attached the completed plans to the tender. The investment will be started after the sponsor’s decision, together with the necessary E-On and permit documentation. (English)
8 February 2022
0 references
L’acquisition et l’installation d’un système solaire sont effectuées au cours de la mise en œuvre du projet; en outre, l’achat et l’installation d’éléments structurels et de soutien connexes, l’achat et la construction des éléments nécessaires au raccordement au système électrique du bâtiment et au réseau et à un fonctionnement techniquement sûr. Le système solaire n’est installé que sur le toit du bâtiment concerné par le développement. La consommation requise a été calculée sur la base des données relatives à la consommation pour 2019. Auparavant, il n’y avait pas de système solaire sur le bâtiment. Au moment de la préparation du projet, avant la présentation de la demande, l’installation du système solaire a été évaluée, tant sur le plan technique que sur le plan économique. Avec l’aide d’un architecte, nous avons planifié la mise en œuvre du projet et nous avons joint les plans achevés à l’appel d’offres. L’investissement commencera après la décision du promoteur, ainsi que la documentation nécessaire E-On et le permis. (French)
10 February 2022
0 references
Zalakaros, Zala
0 references
Identifiers
GINOP-4.1.4-19-2020-01760
0 references