Energy modernisation of the production hall with the use of renewable energy sources (Q3925126): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
50.0 percent
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
39,229,299.0 forint
| |||||||||||||||
Property / budget: 39,229,299.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
110,901.23 Euro
| |||||||||||||||
Property / budget: 110,901.23 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 110,901.23 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 110,901.23 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
19,614,649.5 forint
| |||||||||||||||
Property / EU contribution: 19,614,649.5 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
55,450.61 Euro
| |||||||||||||||
Property / EU contribution: 55,450.61 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 55,450.61 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 55,450.61 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
|
Revision as of 21:47, 14 February 2022
Project Q3925126 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the production hall with the use of renewable energy sources |
Project Q3925126 in Hungary |
Statements
19,614,649.5 forint
0 references
39,229,299.0 forint
0 references
50.0 percent
0 references
12 October 2018
0 references
28 August 2019
0 references
HOLZFABRIK Korlátolt Felelősségű Társaság
0 references
A tervezett fejlesztés nem engedélyköteles beruházás, így engedélyeztetési eljárások, és erre vonatkozó tervdokumentáció nem készült. A projekt műszaki koncepciójának kidolgozása érdekében megtörtént az épület energetikai felmérése, majd ezt követően a pályázati felhívásban meghatározott energetikai mellékletek kitöltése. A kivitelezésre vonatkozó árajánlatbekérések alapján összeállítottuk a projekt elszámolható költségeit. Az energetikai korszerűsítés keretében külső hőszigetelés, külső nyílászárócserére, faelgázosító biomassza kazán beépítésre, valamint egy 16,2 kW-os névleges teljesítményű napelemes rendszer kiépítésére valósulna meg. Egyéb felújítási, korszerűsítési megoldás nem valósul meg. A támogatási kérelem pozitív döntését követően a támogatási szerződés is megkötésre kerül. A projekt megvalósítása során a kivitelezési munkálatok az alábbi tevékenységekre terjednek ki, ezen tevékenységekre igényelünk támogatást. B.I. Épületek hőtechnikai adottságainak javítása, hőveszteségének csökkentése Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése: A fejlesztés keretében megvalósulna az épület külső szerkezeteinek hőszigetelése. A homlokzat hőszigetelésének számításánál zártcellás PUR hab hőszigetelő anyagot alkalmaztak a számítások során. A falazat külső hőszigetelésére javasolt 13 cm vastagságban zárt cellás PUR hab hőszigetelő anyagot alkalmazni (?=0,029 W/mK értékű minimum pl Polychem NG-0428). Javasolt a tetőszerkezet hőszigetelése szintén zártcellás PUR hab használatával 20 cm vastagságban (?=0,029 W/mK értékű minimum pl Polychem NG-0428). A javasolt felújítási rétegrendeket a tervezett állapot energetikai tanúsítványa tartalmazza. Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje / energia-megtakarítást eredményező korszerűsítése A fejlesztés keretében megvalósulna a jelenlegi külső nyílászárók (fa és acél szerkezetű ablakok és ajtók, illetve kopolit üvegezések) cseréje fokozottan hőszigetelt üvegezetlen vagy 3 réteg üvegezésű nyílászárókra (üvegezett Uw=1,1 W/m2K, üvegezetlen Uw=1,4 W/m2K maximum). Brikett, pellet, faapríték, faelgázosító kazánrendszer kiépítése a fejlesztésben érintett épület fűtési és HMV igényének részbeni vagy teljes kielégítése céljából: Az energetikai számítás alapján a jelenlegi fatüzelésű kazán helyett egy faelgázosítós biomassza kazán kerülne beépítésre lambdaszondával együtt, amely a fűtési igény egészét, és HMV igény közel két-harmadát fogja biztosítani. A hőleadó radiátorok megmaradnak, de 2K hőlépcsőjű termosztatikus szelepekkel javasolt felszerelni azokat. A jelenlegi HMV tároló megmarad, illetve a jelenlegi villanybojlerek mint kiegészítő HMV termelők is megmaradnak nyári üzemidőre. Napelemes rendszer telepítése hálózati, vagy autonóm (hálózatra nem kapcsolódó) villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület villamosenergia-ellátásához A villamos áramot hálózatra kapcsolódó polikristályos napelemes rendszer fogja biztosítani. A tetőfelületen 16,2 kW-os napelemes rendszer kiépítése valósulna meg, amely fedezi az épület világításából, az épületgépészet, valamint a berendezések villamosfelhasználásából eredő energiaigény közel egy-harmadát a jelenlegi fogyasztási szokások alapján. A további részletezettség karakterkorlátozás miatt cégszerűen aláírt nyilatkozatban szerepel, amit a hiánypótláshoz csatoltunk. (Hungarian)
0 references
The planned development is an investment that is not subject to authorisation, so authorisation procedures and no planning documentation have been prepared. In order to develop the technical concept of the project, the building’s energy assessment was carried out and the energy annexes specified in the call for proposals were then filled in. We have compiled the eligible costs of the project on the basis of requests for quotations for the construction. In the framework of the energy modernisation, external thermal insulation, external window replacement, wood gasification biomass boiler installation and the construction of a solar panel system with a nominal capacity of 16.2 kW would be realised. No other refurbishment or modernisation solution is implemented. Following a positive decision on the aid application, the grant agreement will also be concluded. During the implementation of the project, the construction works cover the following activities, and we apply for support for these activities. B.I. Improving the thermal capabilities of buildings and reducing their heat loss Thermal insulation of building envelopes other than doors and windows separating a heated and unheated space: As part of the development, thermal insulation of the external structures of the building would be realised. In the calculation of the thermal insulation of the facade, closed cell PUR foam thermal insulation material was used in the calculations. For external thermal insulation of masonry it is recommended to use closed cell PUR foam thermal insulation material (?=0.029 W/mK minimum e.g. Polychem NG-0428) in a thickness of 13 cm. Thermal insulation of the roof structure is also recommended using closed cell PUR foam in 20 cm thickness (?=0.029 W/mK minimum e.g. Polychem NG-0428). The proposed renovation stratums are included in the energy certificate of the planned condition. Replacement/replacement of building envelopes considered as doors and windows separating heated and unheated spaces/replacement resulting in energy savings The development would involve the replacement of the current exterior doors and windows (wood and steel windows and doors or copolitical glazing) with highly heat-insulated unglazed or 3-layer glazed windows (glazed Uw=1,1 W/m2K, unglazed Uw=1,4 W/m2K maximum). Construction of briquettes, pellets, wood chips, wood gasification boiler system to partially or fully satisfy the heating and HMV demand of the building involved in the development: Based on the energy calculation, instead of the current wood-fired boiler, a wood gasification biomass boiler would be installed together with a lambdaprobe, which will provide the whole heating demand and nearly two-thirds of the HMV demand. The heat take-off radiators are maintained, but it is recommended to equip them with 2K thermostatic valves. The current HMV storage remains, as well as the current electric boilers, as additional HMV producers, will be maintained for summertime. Installation of a solar system for network or autonomous (non-grid) electricity generation only for the electricity supply of the building concerned by the development The electricity will be provided by a network-connected polycrystalline solar system. A 16.2 kW solar panel system would be installed on the roof surface, covering nearly one-third of the energy demand from the lighting of the building, the building engineering and the electrical use of the equipment according to current consumption patterns. Further detail is included in a duly signed declaration due to character limitation, which is attached to the rectification. (English)
8 February 2022
0 references
L’aménagement prévu est un investissement qui n’est pas soumis à autorisation, de sorte que des procédures d’autorisation et aucune documentation de planification n’ont été préparées. Afin de développer le concept technique du projet, l’évaluation énergétique du bâtiment a été réalisée et les annexes énergétiques spécifiées dans l’appel à propositions ont ensuite été complétées. Nous avons compilé les coûts éligibles du projet sur la base des demandes de devis pour la construction. Dans le cadre de la modernisation de l’énergie, l’isolation thermique externe, le remplacement des fenêtres extérieures, l’installation d’une chaudière à biomasse de gazéification du bois et la construction d’un système de panneaux solaires d’une capacité nominale de 16,2 kW seraient réalisés. Aucune autre solution de rénovation ou de modernisation n’est mise en œuvre. À la suite d’une décision positive sur la demande d’aide, la convention de subvention sera également conclue. Lors de la mise en œuvre du projet, les travaux de construction couvrent les activités suivantes, et nous sollicitons un soutien pour ces activités. B.I. Améliorer les capacités thermiques des bâtiments et réduire leur perte de chaleur Isolation thermique des enveloppes de bâtiment autres que les portes et les fenêtres séparant un espace chauffé et non chauffé: Dans le cadre du développement, l’isolation thermique des structures extérieures du bâtiment serait réalisée. Dans le calcul de l’isolation thermique de la façade, le matériau d’isolation thermique en mousse PUR à cellule fermée a été utilisé dans les calculs. Pour l’isolation thermique externe de la maçonnerie, il est recommandé d’utiliser un matériau d’isolation thermique en mousse PUR à cellule fermée (?=0,029 W/mK minimum, par exemple Polychem NG-0428) dans une épaisseur de 13 cm. L’isolation thermique de la structure du toit est également recommandée à l’aide de mousse PUR à cellule fermée d’une épaisseur de 20 cm (?=0,029 W/mK minimum, par exemple Polychem NG-0428). Les strates de rénovation proposées sont incluses dans le certificat énergétique de l’état prévu. Remplacement/remplacement des enveloppes de bâtiment considérées comme des portes et des fenêtres séparant les espaces chauffés et non chauffés/remplacement entraînant des économies d’énergie Le développement impliquerait le remplacement des portes et fenêtres extérieures actuelles (fenêtres et portes en bois et en acier ou vitrages copolitiques) par des fenêtres vitrées non vitrées ou à 3 couches fortement isolées à la chaleur (vitrages Uw=1,1 W/m2K, Uw = 1,4 W/m2K maximum). Construction de briquettes, granulés, copeaux de bois, système de chaudière à gazéification du bois pour satisfaire partiellement ou entièrement la demande de chauffage et de HMV du bâtiment impliqué dans le développement: Sur la base du calcul de l’énergie, au lieu de l’actuelle chaudière à bois, une chaudière à biomasse de gazéification du bois serait installée en même temps qu’une Lambdaprobe, qui fournira l’ensemble de la demande de chauffage et près des deux tiers de la demande HMV. Les radiateurs de décollage de chaleur sont maintenus, mais il est recommandé de les équiper de vannes thermostatiques 2K. Le stockage actuel de HMV, ainsi que les chaudières électriques actuelles, en tant que producteurs supplémentaires de VHV, seront maintenus pendant l’été. Installation d’un système solaire pour la production d’électricité en réseau ou autonome (hors réseau) uniquement pour l’approvisionnement en électricité du bâtiment concerné par le développement L’électricité sera fournie par un système solaire polycristallin raccordé au réseau. Un système de panneaux solaires de 16,2 kW serait installé sur la toiture, couvrant près d’un tiers de la demande d’énergie provenant de l’éclairage du bâtiment, de l’ingénierie du bâtiment et de l’utilisation électrique de l’équipement selon les modes de consommation actuels. De plus amples détails figurent dans une déclaration dûment signée en raison de la limitation du caractère, qui est jointe à la rectification. (French)
10 February 2022
0 references
Szolnok, Jász-Nagykun-Szolnok
0 references
Identifiers
GINOP-4.1.2-18-2018-00214
0 references