Property / co-financing rate
 
50.0 percent
Amount50.0 percent
Unitpercent
Property / co-financing rate: 50.0 percent / rank
 
Normal rank
Property / budget
 
15,508,053.0 forint
Amount15,508,053.0 forint
Unitforint
Property / budget: 15,508,053.0 forint / rank
 
Normal rank
Property / budget
 
43,841.27 Euro
Amount43,841.27 Euro
UnitEuro
Property / budget: 43,841.27 Euro / rank
 
Preferred rank
Property / budget: 43,841.27 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 43,841.27 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
7,754,026.5 forint
Amount7,754,026.5 forint
Unitforint
Property / EU contribution: 7,754,026.5 forint / rank
 
Normal rank
Property / EU contribution
 
21,920.63 Euro
Amount21,920.63 Euro
UnitEuro
Property / EU contribution: 21,920.63 Euro / rank
 
Preferred rank
Property / EU contribution: 21,920.63 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 21,920.63 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:45, 14 February 2022

Project Q3925033 in Hungary
Language Label Description Also known as
English
Implementation of building energy development at Sam Manufaktur Bt.
Project Q3925033 in Hungary

    Statements

    0 references
    0 references
    7,754,026.5 forint
    0 references
    21,920.63 Euro
    0.002827 Euro
    14 February 2022
    0 references
    15,508,053.0 forint
    0 references
    43,841.27 Euro
    0.002827 Euro
    14 February 2022
    0 references
    50.0 percent
    0 references
    27 September 2018
    0 references
    31 July 2019
    0 references
    SAM Manufaktur Építőipari, Kereskedelmi és Szolgáltató Betéti Társaság
    0 references
    0 references

    47°20'30.48"N, 16°35'8.88"E
    0 references
    A. Projekt-előkészítési tevékenységek: A projekt benyújtásakor elkészítésre került az épületenergetikai melléklet, mely magában foglalja az Épületenergetikai Tanúsítványt a fejlesztés előtti állapotra vonatkozóan, valamint az elvégzett számítást az energiahatékonysági fejlesztések hatására bekövetkező (köztes) és a beruházás megvalósítását követő (tervezett) állapotra vonatkozóan. Szintén a projekt benyújtásakor elkészítésre került a statikai szakvélemény és a tervezett beruházás műszaki leírása. A projekt keretében tervezett beruházás nem építési engedély köteles, így teljes engedélyezési és kiviteli tervdokumentáció elkészítése nem releváns. A környezeti hatásvizsgálati és az egységes környezethasználati engedélyezési eljárásról szóló 314/2005. (XII. 25.) Korm. rendeletnek megfelelően környezeti hatásvizsgálat elkészítése nem releváns. A projekt során az alábbi épületenergetikai fejlesztések kerülnek megvalósításra: B.I. Épületek hőtechnikai adottságainak javítása, hőveszteségének csökkentése: 1. Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése: - az épületrészek hőszigetelésének javítása: Homlokzati hőszigetelés készítése ragasztva, dűbelezve, hálózva, glettelve 15 cm vastagságban 225 m2 felületen. Ablak spaletták hőszigetelés készítése ragasztva, hálózva, glettelve 1-3 cm vastagságban 40 fm felületen. Homlokzati színvakolat készítése 1,5 mm-es Wéber kapart vékonyvakolattal 245 m2 felületen. Födém hőszigetelése 20 cm vastagságban 250 m2 felületen. 2. Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje / energia-megtakarítást eredményező korszerűsítése: 3 db Welux GZL-MCK02 típusú ablak és 10 db Welux GZL-MCK08 típusú ablak beépítése C. Megújuló energiafelhasználás növelését célzó tevékenységek: 1. Napelemes rendszer telepítése hálózati, vagy autonóm (hálózatra nem kapcsolódó) villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület villamosenergia-ellátásához: - 30 KW-os napelemes rendszer telepítése: a tervezett 42 db Luxor Solar típusú 300 W mono kristályos panel elhelyezésére az épület tetőszerkezetén kerül sor. A táblák mérete: 998x1 650x40mm. A vezérelt - smart napelemes rendszer áramtermelését egy kétlépcsős számítógépes vezérlés optimalizálja: minden napelemtáb|a energiatermelése, különállóan egy mikroprocesszor irányítása alatt áll, Minden string koordinációját egy, a mikroprocesszorokkal kommunikáló, számítógép vezérlésű, SolarEdge SE15K típusú inverter valósítja meg. 2. Hőszivattyú rendszerek alkalmazása fűtésre és/vagy hűtésre és/vagy használati melegvíz-termelésre és/vagy fűtésrásegítésre: - hőszivattyúk telepítése: a tervek szerint 1 db 12 KW-os és 1 db 16 KW-os Panasonic T-cap All in one Tcap ADC16HE8-UX16He8 típusú hőszivattyú kerül beépítésre. D. Egyéb tevékenység: 1. Szakmai megvalósításhoz kapcsolódó szolgáltatásként projektmenedzsment tevékenység kerül megvalósításra, mint igénybevett szakértői szolgáltatás. (Hungarian)
    0 references
    A. Project preparation activities: At the time of submission of the project, the building energy annex was prepared, which includes the Building Energy Certificate for the pre-development state and the calculation of the (intermediate) and post-implementation (planned) state of impact of energy efficiency improvements. Also at the time of submission of the project, the static opinion and the technical description of the planned investment were prepared. The project planned in the framework of the project is not subject to a building permit, so the preparation of a complete permit and construction plan documentation is not relevant. Government Decree No 314/2005 on the environmental impact assessment procedure and the uniform environmental use permit procedure (XII. 25) the preparation of an environmental impact assessment is not relevant in accordance with Government Decree No 25/2004. The following building energy developments will be implemented during the project: B.I. Improving the thermal capabilities of buildings and reducing their heat loss: 1. Thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces: — improvement of the thermal insulation of parts of the building: Production of facade thermal insulation glued, gutted, netted, glinted in 15 cm thickness on 225 m² surface. Window spalets are made of thermal insulation glued, netted, gletted in 1-3 cm thickness on 40 fm surfaces. Creating a facade color blind with a 1.5 mm Wéber scrape on 245 m² surface. Thermal insulation of the slab in 20 cm thickness on 250 m² surface. 2. Replacement of building envelopes considered as doors and windows separating heated and unheated spaces/upgrading resulting in energy savings: Installation of 3 Welux GZL-MCK02 windows and 10 Welux GZL-MCK08 windows C. Renewable energy consumption activities: 1. Installation of a solar system for grid or autonomous generation of electricity (not connected to the grid) solely for the electricity supply of the building concerned by the development: — 30 KW Solar Panel System Installation: the planned 42 Luxor Solar 300 W mono crystalline panels will be installed on the roof of the building. Size of the boards: 998x1 650x40mm. The power generation of the controlled — smart solar system is optimised by a two-step computer control: each solar panel is powered separately by a microprocessor, co-ordinated by a computer-controlled SolarEdge SE15K inverter that communicates with microprocessors. 2. Use of heat pump systems for heating and/or cooling and/or domestic hot water production and/or heating: — installation of heat pumps: 1 Panasonic T-cap All in one TCAP ADC16HE8-UX16He8 heat pump is planned to be installed. D. Other activities: 1. As a service related to professional implementation, project management activities are implemented as an expert service. (English)
    8 February 2022
    0 references
    A. Activités de préparation des projets: Au moment de la soumission du projet, l’annexe sur l’énergie du bâtiment a été élaborée, qui comprend le certificat d’énergie du bâtiment pour l’état d’avant développement et le calcul de l’état (intermédiaire) et post-mise en œuvre de l’impact des améliorations de l’efficacité énergétique. Toujours au moment de la soumission du projet, l’avis statique et la description technique de l’investissement prévu ont été élaborés. Le projet planifié dans le cadre du projet n’est pas soumis à un permis de construire, de sorte que la préparation d’un permis complet et de la documentation relative au plan de construction n’est pas pertinente. Décret gouvernemental no 314/2005 relatif à la procédure d’évaluation des incidences sur l’environnement et à la procédure uniforme d’autorisation d’utilisation de l’environnement (XII. 25) la préparation d’une évaluation des incidences sur l’environnement n’est pas pertinente conformément au décret gouvernemental no 25/2004. Les développements énergétiques suivants seront mis en œuvre au cours du projet: B.I. Améliorer les capacités thermiques des bâtiments et réduire leurs pertes de chaleur: 1. Isolation thermique des enveloppes de bâtiments autres que les portes et les fenêtres séparant les espaces chauffés et non chauffés: — amélioration de l’isolation thermique des parties du bâtiment: Production d’isolation thermique de façade collée, éviscérée, filetée, glissée en 15 cm d’épaisseur sur 225 m² de surface. Les spalets de fenêtre sont faits d’isolation thermique collée, filetée, gletée dans 1-3 cm d’épaisseur sur des surfaces de 40 fm. Création d’un store de couleur de façade avec une éraflure Wéber de 1,5 mm sur 245 m² de surface. Isolation thermique de la dalle en 20 cm d’épaisseur sur 250 m² de surface. 2. Remplacement des enveloppes du bâtiment considérées comme des portes et des fenêtres séparant les espaces chauffés et non chauffés/mise à niveau, ce qui permet d’économiser de l’énergie: Installation de 3 fenêtres Welux GZL-MCK02 et de 10 fenêtres Welux GZL-MCK08 C. Activités de consommation d’énergie renouvelable: 1. Installation d’un système solaire pour le réseau ou la production autonome d’électricité (non raccordée au réseau) uniquement pour l’approvisionnement en électricité du bâtiment concerné par le développement: — Installation du système de panneau solaire de 30 KW: les panneaux mono cristallins Luxor Solar 300 W prévus seront installés sur le toit du bâtiment. Taille des planches: 998x1 650x40mm. La production d’énergie du système solaire intelligent contrôlé est optimisée par un contrôle informatique en deux étapes: chaque panneau solaire est alimenté séparément par un microprocesseur, coordonné par un onduleur SolarEdge SE15K contrôlé par ordinateur qui communique avec les microprocesseurs. 2. Utilisation de systèmes de pompe à chaleur pour le chauffage et/ou le refroidissement et/ou la production d’eau chaude domestique et/ou le chauffage: — installation de pompes à chaleur: 1 Panasonic T-cap Tout en une pompe à chaleur TCAP ADC16HE8-UX16He8 est prévu pour être installé. D. Autres activités: 1. En tant que service lié à la mise en œuvre professionnelle, les activités de gestion de projet sont mises en œuvre en tant que service d’experts. (French)
    10 February 2022
    0 references
    Lukácsháza, Vas
    0 references

    Identifiers

    GINOP-4.1.2-18-2018-00002
    0 references