The role of public education in creating opportunities at the Round World Foundation (Q3903629): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank
Property / budget
 
157,674,798.0 forint
Amount157,674,798.0 forint
Unitforint
Property / budget: 157,674,798.0 forint / rank
 
Normal rank
Property / budget
 
445,746.65 Euro
Amount445,746.65 Euro
UnitEuro
Property / budget: 445,746.65 Euro / rank
 
Preferred rank
Property / budget: 445,746.65 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 445,746.65 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
134,023,578.3 forint
Amount134,023,578.3 forint
Unitforint
Property / EU contribution: 134,023,578.3 forint / rank
 
Normal rank
Property / EU contribution
 
378,884.66 Euro
Amount378,884.66 Euro
UnitEuro
Property / EU contribution: 378,884.66 Euro / rank
 
Preferred rank
Property / EU contribution: 378,884.66 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 378,884.66 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:52, 14 February 2022

Project Q3903629 in Hungary
Language Label Description Also known as
English
The role of public education in creating opportunities at the Round World Foundation
Project Q3903629 in Hungary

    Statements

    0 references
    0 references
    134,023,578.3 forint
    0 references
    378,884.66 Euro
    0.002827 Euro
    14 February 2022
    0 references
    157,674,798.0 forint
    0 references
    445,746.65 Euro
    0.002827 Euro
    14 February 2022
    0 references
    85.0 percent
    0 references
    1 April 2019
    0 references
    29 December 2020
    0 references
    KEREK VILÁG ALAPÍTVÁNY
    0 references
    0 references

    46°4'35.72"N, 18°13'40.94"E
    0 references
    A pályázó általános munkája, a jelen projekt általános célja megegyezik a Felhívás általános céljával, ami az inkluzív, méltányos és minőségi neveléshez és oktatáshoz való hozzáférés javítása, a nevelési-oktatási egyenlőtlenségek csökkentése, megfelelő infrastrukturális háttér kialakításával. Ezen belül a súlyos és halmozottan fogyatékos gyermeket ellátó intézmény infrastrukturális fejlesztése, megújulása a cél épületbővítés által. A Kerek Világ Általános Iskola területileg Pécs keleti városrészében található alapítványi fenntartású gyógypedagógiai iskola. Az épületben jelenleg 7 tanterem, és 4 egyéni foglalkoztató szoba van. Saját tornaterme, közösségi tere nincs, erre a célra a közeli közösségi házban bérel az intézmény termet. A közösségi programok lebonyolítása kb. 300 méter távolságra levő közösségi ház helységeinek bérlésével lehetséges. Jó idő esetén az egyéni és csoportfoglalkozások, szabadidős és közösségi programok színtere lehet az épülethez tartozó, több mint 6 000 m2-es zöld terület, ami jelenleg sajnos nem akadálymentesített, így a gyerekek számára nehezen megközelíthető, sokaknak segítség kell a kijutáshoz. Amennyiben a jelen pályázattal az iskolaépület bővítésére sor kerül, akkor a terápiás foglalkozások helyszíneit is kialakítjuk, valamint minden programunkat saját infrastruktúrában lehet megoldania a pályázónak. A projekt a pályázati felhívás 1. részcéljához kapcsolódik. A bővítéssel létrejön az iskolának egy új, 2 szintes szárnya a kellő előírások és akadálymentesítési szabályok betartásával. Ez infrastrukturális fejlesztés, de az infrastruktúra az egyik alapja az oktatás minőségének. Az iskola fő célja, hogy a gyerekek továbbra is a családjukban élve, részesülhessenek a képességeiknek legmegfelelőbb oktatásban és fejlesztésben, nyitottak legyenek a világra, hogy felnőve minél teljesebb értékű tagjai lehessenek a társadalomnak. Ezen a ponton is kapcsolódik a fejlesztés a szervezet az EFOP-3.1.6-16-os projektjéhez, hisz annak is, annak a majdani eredményeinek kellő infrastrukturális alapot nyújt. Fő projektelemek: 1. Épületbővítés által létrejött épület – Ezzel létrejön egy nettó 330.16 m2-es alapterületű 2 szintes akadálymentesített bővítmény, amiben fejlesztő szobák, közösségi tér, illetve tárgyaló/tanári is helyet kap annak kiszolgáló egységeivel. 3 csoportszoba/tanterem – Jelenleg a négy fejlesztő nevelés-oktatást ellátó csoport négy tanteremben működik, melyek közül egy tanteremben tudják az optimális feltételeket biztosítani, a másik három elsősorban alapterületében nem ad erre lehetőséget. A tervezett bővítést az teszi szükségessé, hogy mind a négy csoportunk számára nélkülözhetetlen a megfelelő feltételek biztosítása. Egyéni fejlesztőszoba – Snoezelen terápiás szoba (eszköz-feltétele a másik pályázatból kerül beszerzésre): A multiszenzoros szoba, olyan biztonságos, harmonikus, esztétikus, nyugalmat árasztó környezet, ahol több érzékszerv stimulálása valósulhat meg különböző ingerek: a fény-, a színek-, a hanghatások, a zene, és az illatok által. Többfunkciós közösségi tér: Az épületnek nincs közösségi tere, azt jelenleg az épülettől távolabb bérelnie kell. Ennek a közösségi térnek a mindennapokban is a maximális lesz a kihasználhatósága. Ezért mozgatható falaival, a tér leválasztásával kiválóan alkalmas lesz a súlyosan-halmozottan sérült gyermekek hatékony és az eddiginél több lehetőséget biztosító egyéni és csoportos mozgásfejlesztésére. Tárgyaló/tanári szoba: Az iskola működésének kezdete óta nem volt lehetőség tárgyaló, illetve tanári szoba kialakítására. Ez abból adódott, hogy elsősorban a gyermekek fejlesztéséhez szükséges helyiségek számát igyekeztek gyarapítani, háttérbe helyezve – a nevelőtestület egyetértésével - a saját érdekeiket szolgáló tárgyaló illetve tanári szoba kialakítását. 2. Felújított udvar – A beruházás által létrejön egy 1200 m2-es felújított, akadálymentesített udvarrész, amivel ez a terület a rekreáció mellett a nevelésbe is bekapcsolható. 3. Beszerzendő eszközök – Ezek az eszközök szorosan az infrastrukturális fejlesztéshez tartoznak, azok berendezései. Köztük van 2 db, összesen több mint 30 m2-es hangszigetelt mobilfal a közösségi hely jobb kihasználhatósága miatt, illetve a fejlesztő termek bútorzata, kellékei. A többi projektelem az ezekhez kapcsolódó projekt-előkészítési és megvalósítás alatt szükséges tevékenységek, szolgáltatások képezik, mint tervezés, közbeszerzés, menedzsment, nyilvánosság, könyvvizsgálat, műszaki ellenőrzés. Számszerűsíthető mutatók átfogóan: Bővítendő épület, fejlesztési hely (intézmény) száma: 1 db Bővítés alapterülete: 330,16 m2 (386 bruttó m2) Udvarfelújítás (ak. ment.) alapterülete: 1200 m2. Támogatott projekt által közvetlenül érintett tanulók száma: 49 fő Támogatott projekt által közvetlenül érintett fejlesztő nevelés-oktatásban részt vevő tanulók száma: 26 fő. A projekt keretében igényelt támogatás tartalékkal együtt 157.674.798 Ft. Projektköltség tartalék nélkül: 149.824.798 Ft. (Hungarian)
    0 references
    The overall work of the applicant, the overall objective of this project, is the same as the general objective of the Call, which is to improve access to inclusive, equitable and quality education and education, to reduce educational inequalities and to create an appropriate infrastructure background. In particular, the infrastructural development and renewal of the institution with severe and multiple disabilities through the expansion of the building. The Round World Primary School is a foundation-run special education school located in the eastern part of Pécs. The building currently has 7 classrooms and 4 individual employment rooms. It has its own gym, no community space, for this purpose the institution’s room is rented in the nearby community house. The organisation of the community programs is possible by renting the rooms of a community house located approximately 300 metres away. In case of good weather, individual and group activities, leisure and community programs can be the scene of more than 6 000 m² green space, which is unfortunately not accessible at the moment, so it is difficult for children to get out, many need help to get out. If this application involves the extension of the school building, we will also set up the locations of the therapy sessions, and all of our programs can be implemented by the applicant in its own infrastructure. The project relates to milestone 1 of the call for proposals. The enlargement will create a new 2-storey wing of the school with due standards and accessibility rules. This is infrastructure development, but infrastructure is one of the foundations for the quality of education. The main goal of the school is to enable children to continue living in their families, to receive the education and development that is best suited to their abilities, to be open to the world so that they can grow up to become full-fledged members of society. At this point, the development is linked to the project EFOP-3.1.6-16, which provides an adequate infrastructure basis for its future results. Main project elements: 1. Building created by building expansion — This creates a net 330.16 m² 2-storey barrier-free add-on in which development rooms, community space and meeting/teachers are located with its service units. 3 group rooms/classrooms — Currently, the four developing educational groups operate in four classrooms, one of which can provide optimal conditions, and the other three do not offer the opportunity to do so mainly in their floor area. The planned enlargement is necessary because it is essential for all four of our groups to ensure the right conditions. Individual development room — Snoezelen therapy room (the device condition will be purchased from the other tender): The multisensor room is a safe, harmonious, aesthetic, relaxing environment where various stimuli can be realised: by the light, the colours, the sound effects, the music, and the fragrances. Multifunctional Community Space: The building does not have a public space and it is currently required to rent it further away from the building. This community space will be maximised in everyday life. Therefore, with its movable walls, separating the space, it will be perfect for the effective and collective development of severely damaged children, providing more opportunities than ever before. Meeting room/teacher room: Since the beginning of the school’s operation, it has not been possible to set up a meeting room or a teaching room. This was mainly due to the attempt to increase the number of rooms needed for the development of children, putting in the background, with the agreement of the educational body, the establishment of a meeting room or a teaching room for their own interests. 2. Refurbished courtyard — The investment creates a renovated, barrier-free yard of 1 200 m², with which this area can be connected to recreation as well as to the upbringing. 3. Assets to be procured — These assets are closely related to infrastructure development and their equipment. Among them, there are 2 soundproof mobile walls with a total of more than 30 m² due to better use of the community space and furniture and accessories of the development rooms. The other project elements are the related activities and services required during project preparation and implementation, such as planning, procurement, management, publicity, auditing, technical inspection. Quantifiable indicators comprehensively: Number of building, development site (institution) to be expanded: 1 expansion floor area: 330.16 m² (386 gross m²) 1 200 m². Number of pupils directly affected by the supported project: 49 participants in development education directly affected by the project supported: 26 people. The aid requested under the project, including the reserve, is HUF 157 674 798. Project cost without reserve: 149 824 798 HUF. (English)
    8 February 2022
    0 references
    Die Gesamtarbeit des Antragstellers, das übergeordnete Ziel dieses Projekts, entspricht dem allgemeinen Ziel der Aufforderung, den Zugang zu inklusiver, gerechter und hochwertiger Bildung und Bildung zu verbessern, Ungleichheiten im Bildungswesen zu verringern und einen angemessenen Infrastrukturhintergrund zu schaffen. Insbesondere die infrastrukturelle Entwicklung und Erneuerung der Einrichtung mit schweren und Mehrfachbehinderungen durch die Erweiterung des Gebäudes. Die Round World Primary School ist eine stiftungsgeführte Sonderschule im östlichen Teil von Pécs. Das Gebäude verfügt derzeit über 7 Klassenzimmer und 4 individuelle Arbeitsräume. Es verfügt über einen eigenen Fitnessraum, keinen Gemeinschaftsraum, zu diesem Zweck wird das Zimmer der Institution im nahegelegenen Gemeindehaus vermietet. Die Organisation der Gemeinschaftsprogramme ist möglich, indem die Zimmer eines ca. 300 m entfernten Gemeinschaftshauses gemietet werden. Bei gutem Wetter, Einzel- und Gruppenaktivitäten, Freizeit- und Community-Programmen können mehr als 6 000 m² Grünfläche zum Schauplatz werden, was derzeit leider nicht zugänglich ist, so dass es für Kinder schwierig ist, auszukommen, viele brauchen Hilfe, um rauszukommen. Wenn diese Anwendung die Erweiterung des Schulgebäudes beinhaltet, werden wir auch die Orte der Therapiesitzungen einrichten, und alle unsere Programme können vom Antragsteller in seiner eigenen Infrastruktur umgesetzt werden. Das Projekt bezieht sich auf Meilenstein 1 der Aufforderung zur Einreichung von Vorschlägen. Mit der Erweiterung wird ein neuer zweistöckiger Flügel der Schule mit den entsprechenden Standards und Regeln für die Zugänglichkeit geschaffen. Dies ist die Infrastrukturentwicklung, aber die Infrastruktur ist eine der Grundlagen für die Qualität der Bildung. Das Hauptziel der Schule ist es, Kindern zu ermöglichen, weiterhin in ihren Familien zu leben, die Bildung und Entwicklung zu erhalten, die ihren Fähigkeiten am besten entspricht, offen für die Welt zu sein, damit sie erwachsen können, um vollwertige Mitglieder der Gesellschaft zu werden. An dieser Stelle ist die Entwicklung mit dem Projekt EFOP-3,1,6-16 verbunden, das eine angemessene Infrastrukturbasis für seine zukünftigen Ergebnisse bietet. Wichtigste Projektelemente: 1. Gebäude geschaffen durch Gebäudeerweiterung – Dies schafft ein Netz 330,16 m² 2-stöckiges barrierefreies Add-on, in dem sich Entwicklungsräume, Gemeinschaftsräume und Tagungs-/Lehrer mit seinen Serviceeinheiten befinden. 3 Gruppenräume/Klassenräume – Zur Zeit arbeiten die vier sich entwickelnden Bildungsgruppen in vier Klassenzimmern, von denen einer optimale Bedingungen bieten kann, und die anderen drei bieten nicht die Möglichkeit, dies hauptsächlich in ihrem Bodenbereich zu tun. Die geplante Erweiterung ist notwendig, weil es für alle vier unserer Fraktionen unerlässlich ist, die richtigen Bedingungen zu gewährleisten. Individueller Entwicklungsraum – Therapieraum Snoezelen (der Gerätezustand wird bei der anderen Ausschreibung erworben): Der Multisensorraum ist eine sichere, harmonische, ästhetische und entspannende Umgebung, in der verschiedene Reize realisiert werden können: durch das Licht, die Farben, die Soundeffekte, die Musik und die Düfte. Multifunktionaler Gemeinschaftsraum: Das Gebäude verfügt nicht über einen öffentlichen Raum und es ist derzeit erforderlich, es weiter weg vom Gebäude zu mieten. Dieser Gemeinschaftsraum wird im Alltag maximiert. Daher wird es mit seinen beweglichen Wänden, die den Raum trennen, perfekt für die effektive und kollektive Entwicklung von schwer beschädigten Kindern sein und mehr Möglichkeiten bieten als je zuvor. Tagungsraum/Lehrerraum: Seit Beginn des Schulbetriebs war es nicht möglich, einen Sitzungssaal oder einen Unterrichtsraum einzurichten. Dies war vor allem auf den Versuch zurückzuführen, die Anzahl der für die Entwicklung von Kindern benötigten Räume zu erhöhen, indem sie mit Zustimmung der Bildungseinrichtung, der Einrichtung eines Sitzungssaals oder eines Unterrichtsraums für ihre eigenen Interessen in den Hintergrund gestellt wurde. 2. Renovierter Innenhof – Die Investition schafft einen renovierten, barrierefreien Hof von 1 200 m², mit dem dieser Bereich sowohl mit Erholung als auch mit der Erziehung verbunden werden kann. 3. Zu beschaffende Vermögenswerte – Diese Vermögenswerte stehen in engem Zusammenhang mit der Infrastrukturentwicklung und deren Ausrüstung. Unter ihnen gibt es 2 schallisolierte mobile Wände mit insgesamt mehr als 30 m² aufgrund der besseren Nutzung des Gemeinschaftsraums und Möbel und Zubehör der Entwicklungsräume. Die anderen Projektelemente sind die bei der Projektvorbereitung und -durchführung erforderlichen Tätigkeiten und Dienstleistungen, wie z. B. Planung, Beschaffung, Verwaltung, Publizität, Audit, technische Kontrolle. Quantifizierbare Indikatoren umfassend: Zahl der zu erweiternden Gebäude, Baustelle (Institution): 1 Erweiterungsfläche: 330,16 m² (386 brutto m²) 1 200 m... (German)
    9 February 2022
    0 references
    Le travail global du demandeur, l’objectif général de ce projet, est le même que l’objectif général de l’appel, qui est d’améliorer l’accès à une éducation et à une éducation inclusives, équitables et de qualité, de réduire les inégalités en matière d’éducation et de créer un cadre approprié en matière d’infrastructures. En particulier, le développement et le renouvellement des infrastructures de l’établissement souffrant de handicaps graves et multiples grâce à l’agrandissement du bâtiment. L’école primaire Round World est une école d’éducation spécialisée gérée par une fondation située dans la partie orientale de Pécs. Le bâtiment compte actuellement 7 salles de classe et 4 salles de travail individuelles. Il a sa propre salle de sport, pas d’espace communautaire, à cette fin, la chambre de l’institution est louée dans la maison communautaire voisine. L’organisation des programmes communautaires est possible en louant les chambres d’une maison communautaire située à environ 300 mètres. En cas de beau temps, les activités individuelles et de groupe, les loisirs et les programmes communautaires peuvent être la scène de plus de 6 000 m² d’espace vert, qui n’est malheureusement pas accessible pour le moment, il est donc difficile pour les enfants de sortir, beaucoup ont besoin d’aide pour sortir. Si cette demande implique l’extension du bâtiment de l’école, nous allons également mettre en place les lieux des séances de thérapie, et tous nos programmes peuvent être mis en œuvre par le demandeur dans sa propre infrastructure. Le projet concerne l’étape 1 de l’appel à propositions. L’élargissement créera une nouvelle aile de 2 étages de l’école avec les normes et les règles d’accessibilité requises. Il s’agit du développement des infrastructures, mais l’infrastructure est l’un des fondements de la qualité de l’éducation. L’objectif principal de l’école est de permettre aux enfants de continuer à vivre dans leur famille, de recevoir l’éducation et le développement qui conviennent le mieux à leurs capacités, d’être ouverts au monde afin qu’ils puissent grandir pour devenir des membres à part entière de la société. À ce stade, le développement est lié au projet EFOP-3.1.6-16, qui fournit une infrastructure adéquate pour ses résultats futurs. Principaux éléments du projet: 1. Bâtiment créé par l’agrandissement du bâtiment — Cela crée un add-on net de 330,16 m² sans barrière de 2 étages dans lequel les salles de développement, l’espace communautaire et les réunions/enseignants sont situés avec ses unités de service. 3 salles de groupe/salles de classe — Actuellement, les quatre groupes éducatifs en développement fonctionnent dans quatre salles de classe, dont l’une peut fournir des conditions optimales, et les trois autres n’offrent pas la possibilité de le faire principalement dans leur surface au sol. L’élargissement prévu est nécessaire parce qu’il est essentiel pour les quatre groupes de garantir les conditions adéquates. Salle de développement individuelle — salle de thérapie Snoezelen (l’état de l’appareil sera acheté auprès de l’autre appel d’offres): La salle multisensor est un environnement sûr, harmonieux, esthétique, relaxant où différents stimuli peuvent être réalisés: par la lumière, les couleurs, les effets sonores, la musique et les parfums. Espace communautaire multifonctionnel: Le bâtiment n’a pas d’espace public et il est actuellement tenu de le louer plus loin du bâtiment. Cet espace communautaire sera maximisé dans la vie quotidienne. Par conséquent, avec ses murs mobiles, séparant l’espace, il sera parfait pour le développement efficace et collectif des enfants gravement endommagés, offrant plus d’opportunités que jamais auparavant. Salle de réunion/salle d’enseignants: Depuis le début du fonctionnement de l’école, il n’a pas été possible d’installer une salle de réunion ou une salle d’enseignement. Cela s’explique principalement par la tentative d’augmenter le nombre de salles nécessaires au développement des enfants, en mettant en arrière-plan, avec l’accord de l’organisme éducatif, la création d’une salle de réunion ou d’une salle d’enseignement pour leurs propres intérêts. 2. Cour rénovée — L’investissement crée une cour rénovée et sans barrière de 1 200 m², avec laquelle cette zone peut être reliée aux loisirs ainsi qu’à l’éducation. 3. Biens à acquérir — Ces actifs sont étroitement liés au développement de l’infrastructure et à leur équipement. Parmi eux, il y a 2 murs mobiles insonorisés d’un total de plus de 30 m² grâce à une meilleure utilisation de l’espace communautaire et des meubles et accessoires des salles de développement. Les autres éléments du projet sont les activités et services connexes requis lors de la préparation et de la mise en œuvre du projet, tels que la planification, l’approvisionnement, la gestion, la publicité, l’audit, l’inspection technique. Indicateurs quantifiables de manière exhaustive: Nombre de bâtiments, de sites d’aménagement (institution) à agrand... (French)
    10 February 2022
    0 references
    Pécs, Baranya
    0 references

    Identifiers

    EFOP-4.1.6-16-2017-00009
    0 references