Green gate (Q3953224): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding French translations) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 69.291338 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,659,126.0 Euro / rank | |||||||||||||||
Property / EU contribution: 1,659,126.0 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,659,126.0 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 600,000,000 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 2,367,082.825 Euro / rank | |||||||||||||||
Property / budget: 2,367,082.825 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 2,367,082.825 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 865,913,322.076 forint / rank | |||||||||||||||
Revision as of 17:48, 13 February 2022
Project Q3953224 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Green gate |
Project Q3953224 in Hungary |
Statements
1 December 2017
0 references
16 November 2020
0 references
PÉCS MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
0 references
Pécs Megyei Jogú Város Önkormányzata egy olyan integrált fejlesztést kíván megvalósítani, amely az alábbi célokra-kihívásokra kíván válaszokat, megoldást megfogalmazni: 1. A belváros funkcionális fejlesztése, alapvetően olyan közösségi terekkel való bővítése, melyek új tér- és területhasználatot eredményeznek a belvárosi közterületeken. 2. A belváros Széchenyi tértől nyugatra eső részének fejlesztése, a Kórház tér és a Jókai tér vonalán. 3. Belvárosi zöldfelületek fejlesztése a „zöld város” koncepciójának megfelelően a belváros zöldfelületi arányának növelése, a belváros élhetőségének javítása. 4. A Tünde ház kihasználatlan emeleti szintjének, továbbá a Hild udvar fejlesztése. 5. Új közösségi tér kialakítása a Jókai tér – Kórház tér vonalon a Memi pasa fürdő és a pécsi villamos környezetének fejlesztésével. 6. Jókai tér használhatóságának javítása a járműforgalom korlátozása révén és elektromos gépkocsi töltőberendezés telepítése. A fejlesztések pontos műszaki tartalma az engedélyezési és kiviteli tervek készítése során kerül meghatározásra. Részletes tartalom: Tünde ház és a Hild udvar fejlesztése: A Tünde ház épülete műemlék, utolsó átalakítására 2003-ban került sor. Emeleti szintjére a feljutást egy sötét felső lépcsőház biztosítja, az utca felől nincs megnyitva, akadálymentes megközelítése jelenleg nincs, amely okok miatt kihasználhatósága korlátozott. Az emeleten 250m2 területen helyezkednek el helyiségek továbbá a galéria, amelyet a pályázat során hasznosítani lehet. Az épületben szükség van energetikai fejlesztésre, amelynek egyik legnagyobb eleme az üveg tetőbevilágító cseréje- átalakítása, továbbá a tető szigetelése és a teljes fűtéskorszerűsítés. Az épület akadálymentesítése lehetőséget adhat arra, hogy az emelet közvetlenül kerüljön összeköttetésre a Széchenyi- és a Jókai térrel. Az egykor impozáns belső tér a Hild udvar jelenleg kihasználatlan, de annak fejlesztésével és lefedésével egy új közösségi tér alakulhat ki. A belső udvar lefedését követően 235m2 nagyságú a városban egyedülálló tér jön létre. Átszellőztettetett kétrétegű tető kialakításával télen és nyáron is biztosítani lehet a megfelelő klímát az udvarban. Ferencesek utcája fejlesztése: Ferencesek utcájában a Jókai tértől a Váradi Antal utcáig a meglévő rossz állapotú burkolat cseréje valósulna meg. A jelenlegi arculat megtartásával a hossz és keresztirányú kockakövek megmaradnak így a közöttük lévő jelenleg rossz állapotú aszfalt helyett kerülne beépítésre térkő burkolat. Az utcában jelenleg nincs növényzet. A projekt keretén belül „zöld szigetekbe” kerülne telepítésre többszintes növényállomány, amely révén zöld szigetek alakulnak ki, javítva az utca klimatikus állapotát. Memi pasa fürdőjének fejlesztése: A Memi pasa fürdője a Ferencesek utcája elején található, állapota erősen leromlott, jelenlegi formájában hasznosításra nem alkalmas. A fürdő nem műemléki jellegű állagmegóvási falazásainak visszabontása után, a jelenlegi térszinttel egy magasságban lehetne lefedni a területet, amely során egy új közösségi tér kerülhet kialakításra. A 160m2 területen üvegfödém kialakításával a műemlék bemutatása mellett a területet hasznosítani is lehet. Pécsi villamos környezetének rendezése: A Memi pasa fürdő és a Ferences templom közötti területen került elhelyezésre a pécsi villamos. A jármű elhelyezése ideiglenesen történt, de legalább a következő 10 évben a villamos maradhat a jelenlegi helyén, így annak rendezése feltétlenül szükséges. Elektromos gépjármű töltő elhelyezése: Váradi Antal utca északi oldalán, amely jelenleg zsákutca, kettő gépjármű töltését biztosító elektromos töltőberendezés kerülne elhelyezésre. Jókai tér fejlesztése: A Jókai téren burkolatba süllyeszthető forgalomcsillapító berendezés kerülne beépítésre, így a jelenlegi árufeltöltő és áruszállító gépjárművek kitilthatók lennének a térről. A Jókai utcában a térburkolatot a Jókai térnek megfelelően szükséges megtervezni egészen a Zrínyi Miklós utcai kereszteződésig. (Hungarian)
0 references
The Municipality of Pécs aims to implement an integrated development that aims to formulate answers and solutions to the following challenges: 1. The functional development of the city centre is basically an extension of public spaces that lead to new spatial and spatial use in public spaces in the city centre. 2. Development of the part of the downtown west of Széchenyi Square, along the line of Hospital Square and Jókai Square. 3. Development of downtown green surfaces in accordance with the concept of “green city” to increase the green surface ratio of the city centre and improve the liveability of the city centre. 4. The unutilised floor level of the Tünde house, as well as the development of the Hild courtyard. 5. The development of a new community space on the line Jókai Square — Hospital Square with the development of the Memi Passa Bath and the tram environment in Pécs. 6. Improve the usability of Jókai space by limiting vehicle traffic and install electric car charging equipment. The exact technical content of the developments will be determined during the preparation of the licensing and construction plans. Detailed content: The development of the elf house and the Hild courtyard: The building of the Tünde house is a monument, the last refurbishment took place in 2003. Access to the upper floor is provided by a dark upper staircase, it is not opened from the street, there is currently no barrier-free access, which is limited for reasons. There are also 250 m² floors of the gallery, which can be used during the tender. There is a need for energy development in the building, one of the main elements of which is the replacement of the glass roof light, as well as roof insulation and complete heating modernisation. The accessibility of the building can provide a direct connection to the Széchenyi and Jókai squares. The once imposing interior of the Hild Court is currently underutilised, but with its development and coverage a new community space may emerge. After the inner courtyard is covered, a unique space of 235 m² will be created in the city. With the design of a ventilated double-layer roof, it is possible to provide the right climate in the courtyard in winter and summer. Development of the street of Franciscans: In the street of Franciscans, from Jókai Square to Váradi Antal Street, there would be a replacement of the existing unfavourable pavement. By retaining the current image, the length and transverse cubes will be retained so that the currently poor asphalt between them would be replaced by a pavement of square stone. There is currently no vegetation in the street. Under the project, a multi-storey plant stock would be planted in “green islands” to form green islands, improving the climate of the street. Development of Memi Pasha’s bath: The bath of Memi Pasha is located at the beginning of the street of Ferences, its condition has deteriorated considerably, it is not suitable for use in its current form. After the restoration of the conservation walls of the bath, it would be possible to cover the area at the same height as the current space level, during which a new public space could be created. With the creation of a glass slab on the 160 m² area, the area can be used in addition to the monument. Organising the tram environment of Pécs: The tram from Pécs was placed in the area between the Memi Pasha bath and the Franciscan church. The vehicle has been temporarily located, but the tram can remain in its current location for at least the next 10 years, so it is absolutely necessary to arrange it. Installation of electric vehicle chargers: On the north side of Antal Váradi street, which is currently a dead end, an electric charging system for charging two vehicles would be installed. Development of Jókai Square: In Jókai Square, a recessable traffic damping device would be installed, so the current vehicles for loading and transporting goods could be banned from the space. In Jókai street, it is necessary to plan the square covering according to Jókai Square until the intersection of Miklós Zrínyi Street. (English)
9 February 2022
0 references
La municipalité de Pécs vise à mettre en œuvre un développement intégré qui vise à formuler des réponses et des solutions aux défis suivants: 1. Le développement fonctionnel du centre-ville est essentiellement une extension des espaces publics qui conduisent à une nouvelle utilisation spatiale et spatiale dans les espaces publics du centre-ville. 2. Développement de la partie du centre-ville à l’ouest de la place Széchenyi, le long de la ligne de la place de l’hôpital et de la place Jókai. 3. Développement de surfaces vertes du centre-ville conformément au concept de «ville verte» afin d’augmenter le rapport de surface verte du centre-ville et d’améliorer la convivialité du centre-ville. 4. Le plancher inutilisé de la maison Tünde, ainsi que le développement de la cour Hild. 5. Le développement d’un nouvel espace communautaire sur la ligne Place Jókai — Place de l’Hôpital avec le développement du bain Memi Passa et l’environnement du tramway à Pécs. 6. Améliorer la facilité d’utilisation de l’espace Jókai en limitant le trafic des véhicules et en installant des équipements de recharge de voiture électrique. Le contenu technique exact des travaux sera déterminé lors de l’élaboration des plans d’octroi de licences et de construction. Contenu détaillé: Le développement de la maison elfe et de la cour Hild: Le bâtiment de la maison Tünde est un monument, la dernière rénovation a eu lieu en 2003. L’accès à l’étage supérieur est assuré par un escalier supérieur sombre, il n’est pas ouvert de la rue, il n’y a actuellement pas d’accès sans obstacle, ce qui est limité pour des raisons. Il y a également 250 m² de planchers de la galerie, qui peuvent être utilisés lors de l’appel d’offres. Il y a un besoin de développement énergétique dans le bâtiment, dont l’un des principaux éléments est le remplacement de la lumière de toit en verre, ainsi que l’isolation du toit et la modernisation complète du chauffage. L’accessibilité du bâtiment peut fournir une connexion directe aux places Széchenyi et Jókai. L’intérieur imposant de la cour Hild est actuellement sous-utilisé, mais avec son développement et sa couverture, un nouvel espace communautaire pourrait émerger. Une fois la cour intérieure couverte, un espace unique de 235 m² sera créé dans la ville. Avec la conception d’un toit à double couche ventilé, il est possible d’assurer le bon climat dans la cour en hiver et en été. Développement de la rue franciscaine: Dans la rue franciscaine, de la place Jókai à la rue Váradi Antal, il y aurait un remplacement du trottoir défavorable existant. En conservant l’image actuelle, la longueur et les cubes transversaux seront conservés afin que l’asphalte actuellement pauvre entre eux soit remplacé par un trottoir de pierre carrée. Il n’y a actuellement aucune végétation dans la rue. Dans le cadre du projet, un stock de plantes à plusieurs étages serait planté dans des «îlots verts» pour former des îles vertes, améliorant ainsi le climat de la rue. Développement du bain de Memi Pacha: Le bain de Memi Pacha est situé au début de la rue de Ferences, son état s’est considérablement détérioré, il ne convient pas pour une utilisation dans sa forme actuelle. Après la restauration des murs de conservation du bain, il serait possible de couvrir la zone à la même hauteur que le niveau actuel de l’espace, au cours de laquelle un nouvel espace public pourrait être créé. Avec la création d’une dalle de verre sur la surface de 160 m², la surface peut être utilisée en plus du monument. Organisation de l’environnement tram de Pécs: Le tramway de Pécs a été placé dans la zone entre le bain Memi Pacha et l’église franciscaine. Le véhicule a été temporairement situé, mais le tramway peut rester dans son emplacement actuel pendant au moins les 10 prochaines années, il est donc absolument nécessaire de l’arranger. Installation de chargeurs de véhicules électriques: Sur le côté nord de la rue Antal Váradi, qui est actuellement une impasse, un système de recharge électrique pour recharger deux véhicules serait installé. Développement de la place Jókai: Sur la place Jókai, un dispositif d’amortissement de la circulation serait installé, de sorte que les véhicules actuels pour le chargement et le transport de marchandises pourraient être interdits de l’espace. Dans la rue Jókai, il est nécessaire de planifier le revêtement de la place selon la place Jókai jusqu’à l’intersection de la rue Miklós Zrínyi. (French)
10 February 2022
0 references
Pécs, Baranya
0 references
Identifiers
TOP-6.3.2-16-PC1-2017-00001
0 references