Building energy development in the village of Erdőkürt (Q3951174): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
100.0 percent
Amount100.0 percent
Unitpercent
Property / co-financing rate: 100.0 percent / rank
 
Normal rank
Property / budget
 
23,751,080.0 forint
Amount23,751,080.0 forint
Unitforint
Property / budget: 23,751,080.0 forint / rank
 
Normal rank
Property / budget
 
67,144.3 Euro
Amount67,144.3 Euro
UnitEuro
Property / budget: 67,144.3 Euro / rank
 
Preferred rank
Property / budget: 67,144.3 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 67,144.3 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
23,751,080.0 forint
Amount23,751,080.0 forint
Unitforint
Property / EU contribution: 23,751,080.0 forint / rank
 
Normal rank
Property / EU contribution
 
67,144.3 Euro
Amount67,144.3 Euro
UnitEuro
Property / EU contribution: 67,144.3 Euro / rank
 
Preferred rank
Property / EU contribution: 67,144.3 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 67,144.3 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:02, 13 February 2022

Project Q3951174 in Hungary
Language Label Description Also known as
English
Building energy development in the village of Erdőkürt
Project Q3951174 in Hungary

    Statements

    0 references
    23,751,080.0 forint
    0 references
    67,144.3 Euro
    0.002827 Euro
    13 February 2022
    0 references
    23,751,080.0 forint
    0 references
    67,144.3 Euro
    0.002827 Euro
    13 February 2022
    0 references
    100.0 percent
    0 references
    1 May 2018
    0 references
    30 November 2019
    0 references
    ERDŐKÜRT KÖZSÉG ÖNKORMÁNYZATA
    0 references
    0 references

    47°46'29.17"N, 19°27'14.29"E
    0 references
    A projekt közvetett célja és várt eredménye, hogy hosszú évek során megtakarított energiával hozzájáruljon az üvegházhatás káros következményeinek csökkentéséhez. Közvetett célként fogalmazható meg az a példamutatás, mely rávilágít arra, hogy egy közszolgálati intézmény is megfelelő szervezéssel, előkészítéssel, ésszerű gazdálkodással, valamint el nem hanyagolhatóan külső - EU és központi költségvetési - támogatással képes tenni a jövő megőrzése érdekében. A projekt közvetlen céljai az alábbiakban foglalhatók össze: • Hazai és EU irányelvek előírásainak, elvárásainak való megfelelés • A fenntartható fejlődés elősegítése • Szemléletváltás elősegítése a fenntartható fejlődés területén • ÜHG kibocsátás csökkentése • Közreműködés az éghajlatváltozás mérséklésében • Energiafüggőség csökkentése • Az ország versenyképességének javítása A projekt a környezetvédelmi prioritásokat szem előtt tartva törekszik a települési környezetvédelem erősítésére és a környezetbiztonság növelésére. A projekt a tervezett beruházás megvalósítása révén a környezeti terhelés mérséklésével hozzájárul a helyi, tágabb értelemben a regionális környezeti állapot javulásához. Erdőkürt Község Önkormányzata a pályázat keretében egy óvodaépület energetikai korszerűsítését kívánja megoldani. A fejlesztés közvetlen célcsoportja Erdőkürt érintett épületeinek dolgozói és használói. A projekt közvetett célcsoportja Erdőkürt állandó lakossága, a településre látogató turisták, valamint az elért ÜHG kibocsátás csökkenésen keresztül az ország teljes lakossága. Óvoda: A fejlesztés célja, hogy az erdőkürti óvoda energetikai felújításával a fenntartási költségek minimalizálódjanak. Az épület két részre tagozódik, egy régi parasztházra és egy 1975-ben hozzátoldott lapostetős épületrészre. Az épület önkormányzati tulajdonú és fenntartású, energetikai szempontból rendkívül elavult. Tervezett beavatkozások: 1. Utólagos hőszigetelések Az átalakított épület mindkét részének teljes külső homlokzata 15,0 cm külső EPS hőszigetelést (DRYVIT) kap. Az átalakított épület energetikai paramétereinek javítása érdekében a zárófödémekben a parasztháznál 20,00 cm vastag kőzetgyapot hőszigetelő réteg elhelyezése tervezett, míg a lapostetős épületben a 20,0 cm EPS hőszigetelést kap (vízszigeteléssel együtt). 2. Nyílászárók Az átalakítás, felújítás során az összes nyílászáró kicserélésre kerül, a jelenlegi elavult nyílászárók helyett korszerű hőszigetelt műanyag nyílászárókra kerülnek beépítésre az alábbiak szerint. Ablakok: Műanyag ablakrendszer kerül beépítésre, ahol a magas hőszigetelési értékű ablakszerkezet hő átbocsátási tényezője U=1,15 W/m2K. Az alábbi ablakok kerülnek beszerelésre: 2 darab 120 cm * 40 cm méretű ablak 4 darab 40 cm * 60 cm méretű ablak 5 darab 185 cm * 180 cm méretű ablak 3 darab 90 cm * 200 cm méretű ablak 6 darab 120 cm * 140 cm méretű ablak Ajtók: Az ablakrendszerrel kompatibilis műanyag ajtók kerülnek beépítésre. (U=1,15 W/m2K.) Az elavult kazánt 22 kW-os modern kondenzációs gázkazánra cseréljük, amely a használati melegvizet is elő tudja állítani. Ezzel egyidejűleg a radiátorokat termosztatikus szeleppel látjuk el, így helyiségenként szabályozás megoldott lesz az épületben. Akadálymentesítés: A fejlesztés eredményeképpen az épület főbejáratának akadálymentesítése is megvalósul. Ennek részeként a bejárat akadálymentes útvonallal, logikusan összekötésre kerül az épület környékén fellelhető összes akadálymentesen kialakított térrel és elemmel. Az ajtók mindkét oldalán a mozgáshoz - manőverezéshez - megfelelő méretű (1,50x1,50m), vízszintes helyet biztosítsunk. A kivitelezés során a küszöbök kialakítását megpróbáljuk elkerülni, amennyiben erre mindenképp szüksége van, akkor az legfeljebb 2 cm magas legömbölyített küszöb lesz. A bejárattól az illemhelyig vezető út teljes mértékben akadálymentesítésre kerül. A beruházás megvalósulásával olyan méretű illemhely kerül kialakításra, amely lehetővé teszi a kerekesszéket használó személy részére a 360 fokos megfordulást. A WC csésze úgy kerül elhelyezésre, hogy egy aktív használó kerekesszékből történő átülése legalább háromféle módon meg tudja közelíteni, továbbá az esetleges segítő személy számára is megfelelő hely legyen biztosítva a WC mögött illetve a WC mellett. Rehabilitációs környezettervező szakmérnök/szakértő kerül bevonásra az akadálymentes előírásoknak való megfelelőség és a megfelelő kivitelezés érdekében. A projekt műszaki előkészítésében, a tervezés során és a projekt műszaki megvalósításában is bevonásra a rehabilitációs környezettervező szakmérnök/szakértő. Napelemes rendszer Ezek mellett kiépítésre kerül egy tetőre telepített 4 kW teljesítményű napelemes rendszer 16 db 250 Wp-s napelem modul felszerelésével, illetve a rendszer teljesítményéhez megfelelő inverterrel. A napelemes rendszer az elmúlt évek adatai alapján úgy lett méretezve, hogy annak termelése az adott épületben felhasználásra kerül, így villamos energia értékesítés nem történik. (Hungarian)
    0 references
    The indirect objective and expected result of the project is to contribute to reducing the adverse consequences of the greenhouse effect with energy saved over many years. It is an indirect objective to set an example to show that a public service institution can also act with proper organisation, preparation, rational management and unnecessarily external support — EU and central budget — to preserve the future. The direct objectives of the project can be summarised as follows: • Meeting the requirements and expectations of domestic and EU directives • Promoting sustainable development • Promoting a change of attitude in the field of sustainable development • Reducing greenhouse gas emissions • Reducing energy dependence • Improving the competitiveness of the country The project aims to strengthen local environmental protection and improve environmental security with environmental priorities in mind. The project contributes to the improvement of local and wider regional environmental status by reducing environmental pressure through the implementation of the planned investment. The Municipality of Erdőkürt intends to implement the energy renovation of a kindergarten building in the framework of the tender. The direct target group of the development is the employees and users of the affected buildings of Erdőkürt. The indirect target group of the project is the permanent population of Erdőkürt, tourists visiting the settlement and the entire population of the country through the reduction of greenhouse gas emissions achieved. Kindergarten: The aim of the development is to minimise the maintenance costs through the energy renovation of the nursery in the forest. The building is divided into two parts, an old farmhouse and a flat-roofed building in 1975. The building is owned and maintained by local governments and is extremely outdated from the energy point of view. Planned interventions: 1. The entire exterior facade of both parts of the converted building receives 15.0 cm external EPS insulation (dryvit). In order to improve the energy parameters of the converted building, it is planned to install a heat-insulating layer of 20.00 cm thick rock wool in the closing slabs, while in the flat roofed building 20.0 cm EPS is provided (including waterproofing). 2. All doors and windows will be replaced during the refurbishment and renovation, instead of the current outdated windows, they will be installed on modern thermally insulated plastic doors and windows as follows. Windows: A plastic window system is installed where the heat transmission factor of a window structure with high insulation value is U=1,15 W/m2K. The following windows are installed: 2 pieces 120 cm*40 cm size window 4 pieces 40 cm*60 cm size window 5 pieces 185 cm* 180 cm size window 3 pieces 90 cm*200 cm size window 6 pieces 120 cm * 140 cm window Doors: Plastic doors compatible with the window system are installed. (U=1,15 W/m2K.) The outdated boiler is replaced by a 22 kW modern condensation gas boiler, which can also produce domestic hot water. At the same time, the radiators are equipped with thermostatic valves, so each room will be regulated in the building. Accessibility: As a result of the development, the main entrance of the building will be made accessible. As part of this, the entrance is logically connected to all the accessible spaces and elements around the building with an obstacle-free route. On both sides of the doors provide a level space of sufficient size (1,50x1.50 m) for movement — manoeuvring. During the construction, we try to avoid the construction of the thresholds. If you need it, it will be a rounded threshold no more than 2 cm high. The road from the entrance to the toilet will be fully accessible. With the realisation of the investment, a toilet of a size that allows the wheelchair user to turn 360 degrees is created. The toilet cup is placed in such a way that the transfer of an active user from a wheelchair can be approached in at least three ways, and that suitable space is provided for any assistance person behind the toilet or next to the toilet. Rehabilitation environmental planning engineer/expert will be involved in order to comply with accessible regulations and to ensure proper implementation. In the technical preparation of the project, during planning and in the technical implementation of the project, the specialist/expert for rehabilitation environmental planning is involved. In addition, a 4 kW solar system installed on the roof is installed with the installation of 16 250 Wp solar modules and an inverter suitable for system performance. Based on data from recent years, the solar system has been scaled in such a way that its production is used in the given building, so no electricity is sold. (English)
    9 February 2022
    0 references
    L’objectif indirect et le résultat attendu du projet sont de contribuer à réduire les conséquences négatives de l’effet de serre grâce à des économies d’énergie sur de nombreuses années. Il s’agit d’un objectif indirect de montrer qu’une institution de service public peut également agir avec une organisation appropriée, une préparation, une gestion rationnelle et un soutien externe inutilement — budget de l’UE et budget central — pour préserver l’avenir. Les objectifs directs du projet peuvent être résumés comme suit: • Répondre aux exigences et aux attentes des directives nationales et européennes • Promouvoir le développement durable • Promouvoir un changement d’attitude dans le domaine du développement durable • Réduire les émissions de gaz à effet de serre • Réduire la dépendance énergétique • Améliorer la compétitivité du pays Le projet vise à renforcer la protection de l’environnement local et à améliorer la sécurité environnementale en tenant compte des priorités environnementales. Le projet contribue à l’amélioration de l’état environnemental local et régional en réduisant la pression environnementale par la mise en œuvre des investissements prévus. La municipalité d’Erdőkürt a l’intention de mettre en œuvre la rénovation énergétique d’un bâtiment de maternelle dans le cadre de l’appel d’offres. Le groupe cible direct du développement est les employés et les utilisateurs des bâtiments concernés d’Erdőkürt. Le groupe cible indirect du projet est la population permanente d’Erdőkürt, les touristes visitant l’établissement et l’ensemble de la population du pays grâce à la réduction des émissions de gaz à effet de serre. Jardin d’enfants: L’objectif du développement est de minimiser les coûts d’entretien par la rénovation énergétique de la pépinière dans la forêt. Le bâtiment est divisé en deux parties, une ancienne ferme et un bâtiment à toit plat en 1975. Le bâtiment est détenu et entretenu par les autorités locales et est extrêmement dépassé du point de vue énergétique. Interventions prévues: 1. Toute la façade extérieure des deux parties du bâtiment converti reçoit une isolation EPS externe de 15,0 cm (Dryvit). Afin d’améliorer les paramètres énergétiques du bâtiment converti, il est prévu d’installer une couche isolante thermique de 20,00 cm d’épaisseur de laine de roche dans les dalles de fermeture, tandis que dans le bâtiment à toit plat 20,0 cm EPS est fourni (y compris l’étanchéité). 2. Toutes les portes et fenêtres seront remplacées lors de la rénovation et de la rénovation, au lieu des fenêtres obsolètes actuelles, elles seront installées sur les portes et fenêtres en plastique thermosolées modernes comme suit. Fenêtres: Un système de fenêtres en plastique est installé lorsque le facteur de transmission de la chaleur d’une structure de fenêtre à haute valeur d’isolation est U=1,15 W/m2K. Les fenêtres suivantes sont installées: 2 pièces 120 cm * 40 cm fenêtre de taille 4 pièces 40 cm * 60 cm fenêtre de taille 5 pièces 185 cm* 180 cm fenêtre de taille 3 pièces 90 cm * 200 cm fenêtre de taille 6 pièces 120 cm * 140 cm fenêtre Portes: Des portes en plastique compatibles avec le système de fenêtres sont installées. (U=1,15 W/m2K.) La chaudière périmée est remplacée par une chaudière à gaz à condensation moderne de 22 kW, qui peut également produire de l’eau chaude domestique. Dans le même temps, les radiateurs sont équipés de vannes thermostatiques, de sorte que chaque pièce sera régulée dans le bâtiment. Accessibilité: Grâce à l’aménagement, l’entrée principale du bâtiment sera accessible. Dans ce cadre, l’entrée est logiquement reliée à tous les espaces et éléments accessibles autour du bâtiment avec un parcours sans obstacle. Des deux côtés des portes fournissent un espace de niveau de taille suffisante (1,50x1,50 m) pour le mouvement — manœuvre. Pendant la construction, nous essayons d’éviter la construction des seuils. Si vous en avez besoin, ce sera un seuil arrondi ne dépassant pas 2 cm de hauteur. La route de l’entrée aux toilettes sera entièrement accessible. Avec la réalisation de l’investissement, une toilette d’une taille qui permet à l’utilisateur de fauteuil roulant de tourner 360 degrés est créée. La tasse de toilette est placée de telle sorte que le transfert d’un utilisateur actif à partir d’un fauteuil roulant puisse être approché d’au moins trois manières, et qu’un espace approprié soit prévu pour toute personne d’assistance derrière la toilette ou à côté de la toilette. Un ingénieur/expert en planification environnementale de réhabilitation sera impliqué afin de se conformer à la réglementation accessible et d’assurer une mise en œuvre adéquate. Dans la préparation technique du projet, lors de la planification et de la mise en œuvre technique du projet, le spécialiste/expert de la planification environnementale de réhabilitation est impliqué. En outre, un système solaire de 4 kW installé sur le toit est installé avec l’installation de modules solaires de 16 250 Wp e... (French)
    10 February 2022
    0 references
    Erdőkürt, Nógrád
    0 references

    Identifiers

    TOP-3.2.1-16-NG1-2017-00027
    0 references