Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 78.944084 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 107,843.19 Euro / rank | |||||||||||||||
Property / EU contribution: 107,843.19 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 107,843.19 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 39,000,000 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 135,046.867 Euro / rank | |||||||||||||||
Property / budget: 135,046.867 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 135,046.867 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 49,402,107.823 forint / rank | |||||||||||||||
Revision as of 17:01, 13 February 2022
Project Q3951130 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the seat of the Roma Nationality Municipality of Jászalsószentgyörgy |
Project Q3951130 in Hungary |
Statements
1 February 2018
0 references
31 July 2019
0 references
JÁSZALSÓSZENTGYÖRGY KÖZSÉGI ÖNKORMÁNYZAT
0 references
a.) A projekt célja : a 100%-ban önkormányzati tulajdonban lévő Roma Nemzetiségi Önkormányzat székhelyének energiahatékonyságot célzó felújítása és fejlesztése, amely a fosszilis energiahordozókból származó üvegházhatású gázok (ÜHG) kibocsátásának csökkentését szolgálja, valamint az épület működtetési és fenntartási költségeit jelentősen csökkenti. b.) A projekt szakmai-műszaki tartalma: A projekt elsősorban az épület energetikai javítására, valamint az érintett épületrész akadálymentes kialakítás biztosítására törekszik. 1. Az épület fűtött teret határoló falainak külső oldali hőszigetelése Hőszigetelő homlokzati bevonat készítése, előkészített felületre,(150 mm vtg.,EPS hőszigetelő tábla felhasználásával, TERRANOVA weber.therm15 vagy ezzel egyenértékű homlokzati hőszigetelő rendszerrel, a homlokzati alapfelületeken. Hőszigetelő homlokzati bevonat készítése, előkészített felületre, 30 mm vtg. EPS hőszigetelő tábla felhasználásával, TERRANOVA weber.therm15 vagy ezzel egyenértékű homlokzati hőszigetelő rendszerrel, ablaknyílások külső káváin, 23 cm szélességig, az előírások betartásával. Lábazati hőszigetelési rendszer készítése, fagyálló lábazati hőszigetelő rendszer alkalmazásával, zártcellás hőszigetelés 70 mm vtg-ban, lábazati alapfelületekre. 2. Zárófödém hőszigetelése a megfelelő értékre A zárófödémre 20 cm vastag kőzetgyapot hőszigetelés (pl. :URSA HF-HL vagy Rockwool Airrock LD (40kg/m3) kőzetgyapot hőszigetelés, illetve ezzel egyenértékű) terítés készül. A tetőn bejutó csapadékvizek elleni védelemként a hőszigetelés páraáteresztő fólia terítést kap. 3. Az épület külső nyílászáróinak energia-megtakarítást eredményező cseréje eredeti méretekben 5 kamrás, műanyag ablak, 70 mm-es profil. A kapcsolódó falszerkezethez dübeles befogással,tömítéssel, takarásokkal kompletten. Uw• 1,15 W/m2K. Üvegezés: 4+16 argon+4 super low-e üveg Ug• 1,0 W/m2K. 5 légkamrás 70 mm vtg profil. Kívül-belül fehér színben, horganyzott acél merevítéssel, kettős EPDM anyagú szürke színű tömítéssel, ROTO NT (ezüst színű) vasalattal, fehér színű kilincsekkel, hőszigetelt stadúr panellel. Nyílászárók hő átbocsátási tényezője: Uw<1,35 W/m2K, léghang gátlás: LH 4 kategória. 4. FŰTÉSKORSZERŰSÍTÉS: Az épület fűtésére az eddig használt gázkazán teljes egészében elbontásra kerülnek, helyére 1 db Viessmann Vitodens Gázüzemű kondenzációs földgáz tüzelésű, 26 kW névleges egységteljesítményű kazán kerül elhelyezésre. A kazán külső időjárásfüggő vezérlésére szabályozó és kiegészítő berendezések kerülnek beépítésére. Kicserélésrekerülnek a raditárorok ill új termosztátfejes szelepek kerülnek fel. 5. MEGÚJULÓ ENERGIAFORRÁS: Komplett 3 kW-os napelemes (fotovoltaikus) rendszer telepítése 6. Az épület projektarányos akadálymentesítése c.) A felhívás 3.4 pontjában előírt feltételek teljesülése: A támogatást igénylő vállalja a Felhívás 3.4.1. pontjában meghatározott előírások teljesítését. A Felhívás 3.4.1.2. pontjában szereplő esélyegyenlőségi és környezetvédelmi előírásoknak a projekt megfelel. A projektnek előrelátható klímakockázata nincs. A projektnek a vizek állapotára nincs hatása, vízjogi létesítési engedély nem szükséges. A műszaki tervdokumentáció elkészítése és a teljes projekt előkészítés a fejezetben bemutatott projekt kidolgozására vonatkozó feltételek alapján készült. d) a felhívás tartalmi értékelési szempontok pontjában előírt feltételek teljesülése: A projekt az 1.1-1.5, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1-4.4, 5.1,7.2, 9.1-9.2, 10.1-10.6, 10.8 értékelési szempontok mindegyikének megfelel. A tervezett projekt illeszkedik a TOP céljaihoz, szakmai indokoltság igény és kihasználtság megfelelő. A projekt megalapozottsága megfelelő. Az esetleges kockázatok elemzésre kerültek. Műemléki vagy helyi védelem alatt álló épület felújítására nem kerül sor. A fenntarthatósági kritériumoknak megfelel a projekt. A projekt illeszkedik más OP-k projektjeihez. A beruházás nem kirekesztő egyetlen társadalmi csoport számára sem. e) standard eljárás esetén a projekt terület-specifikus értékelési szempontok általi minősítése: A megvalósuló fejlesztés beavatkozási szinten illeszkedik a hatályos Jász-Nagykun-Szolnok Megyei Területfejlesztési Programhoz (6.1 intézkedés). A beavatkozások során az épület energiahatékonyságának növelése fontos elemként jelenik meg. Településünk a kedvezményezett járások besorolásáról szóló 290/2014. (XI.26.) számú Korm. rendelet alapján a komplex programmal fejlesztendő Jászapáti járásban található. A fejlesztés eredményeként elért energiamegtak. mértéke az elmúlt 3 év átlagához viszonyítva 20% felett van (50%). A fejlesztéshez nem kapcsolódik élőmun (Hungarian)
0 references
a.) The aim of the project is to: refurbishment and development of the seat of the Roma Nationality Municipality, which is 100 % municipally owned, to reduce greenhouse gas (GHG) emissions from fossil fuels and significantly reduce the operating and maintenance costs of the building. B.) The technical and technical content of the project: The project primarily aims to improve the energy of the building and to ensure the unobstructed design of the affected part of the building. 1. The external thermal insulation of the walls of the building’s heated space is made of thermal insulation facade coating for a prepared surface, using a 150 mm vtg.,EPS thermal insulation board, TERRANOVA weber.therm15 or equivalent façade thermal insulation system on the facade base surfaces. Preparation of thermal insulating facade coating, prepared surface, 30 mm vtg. Using EPS thermal insulation board, TERRANOVA weber.therm15 or equivalent facade thermal insulation system, on the outer casings of window openings, up to 23 cm width, in compliance with the specifications. Preparation of a pedestal thermal insulation system using antifreeze pedestal thermal insulation system, closed cell thermal insulation in 70 mm vtg, on pedestal base surfaces. 2. A 20 cm thick rock wool thermal insulation (e.g.:URSA HF-HL or Rockwool Airrock LD (40 kg/m³) rock wool thermal insulation or equivalent) is made for the closing floor. As protection against rainwater entering the roof, thermal insulation is provided with permeable film spreading. 3. Replacement of the exterior doors of the building with energy savings in original sizes of 5 chambers, plastic window, 70 mm profile. For the related wall structure, complete with dummy capture, sealing and coverings. UW• 1.15 W/m2K. Glazing: 4+ 16 argon+ 4 super low-e glass Ug • 1.0 W/m2K. 5 air chamber 70 mm vtg profile. White inside and outside, galvanised steel stiffening, double EPDM grey seal, ROTO NT (silver color) iron, white handles, heat insulated staple panel. Heat transmission factor for doors and windows: UW<1,35 W/m2K, air volume inhibition: Category LH 4. 4. HEATING MODERNISATION: For heating the building, the gas boiler used so far will be completely dismantled, replaced by one Viessmann Vitodens Gas-fired Condensation Natural Gas boiler with a rated capacity of 26 kW. Regulating and auxiliary equipment for external weather-dependent control of the boiler is installed. Raditars are replaced and new thermostat valves are added. 5. RENEWABLE ENERGY: Installation of a complete 3 kW solar panel (photovoltaic) system 6. (C) Compliance with the conditions set out in point 3.4 of the call: The applicant undertakes to comply with the requirements set out in point 3.4.1 of the Call. The project complies with the equal opportunities and environmental standards set out in point 3.4.1.2 of the Call. The project has no foreseeable climate risk. The project has no impact on the status of the water, and no water rights permit is required. The preparation of the technical design documentation and the preparation of the complete project were based on the criteria for the development of the project described in this chapter. D) compliance with the conditions laid down in the substantive assessment criteria of the call: The project meets all evaluation criteria 1.1-1.5, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1-4.4, 5.1,7.2, 9.1-9.2, 10.1-10.6, 10.8. The planned project fits the objectives of the TOP, and the need for professional justification and utilisation is appropriate. The project is well founded. Potential risks have been analysed. No renovation of a monumental or locally protected building will take place. The project meets the sustainability criteria. The project fits with projects of other OPs. Investment is not exclusionary for any social group. in the case of a standard procedure, the qualification of the project by area-specific assessment criteria: The resulting development is in line with the current Jász-Nagykun-Szolnok County Regional Development Programme (measure 6.1) at the level of intervention. During interventions, increasing the energy efficiency of the building is an important element. Our settlement is 290/2014 on the classification of the beneficiary districts. It is located in the district of Jászapáti, which is to be developed with the complex programme, on the basis of Government Decree (XI.26.) (XI.26.). The energy consumption achieved as a result of the development is above 20 % (50 %) compared to the average over the last 3 years. The development is not linked to live work (English)
9 February 2022
0 references
a) Le but du projet est de: rénovation et développement du siège de la municipalité de nationalité rom, détenue à 100 % par les municipalités, afin de réduire les émissions de gaz à effet de serre (GES) provenant des combustibles fossiles et de réduire considérablement les coûts d’exploitation et d’entretien du bâtiment. B.) Le contenu technique et technique du projet: Le projet vise principalement à améliorer l’énergie du bâtiment et à assurer la conception sans entrave de la partie concernée du bâtiment. 1. L’isolation thermique externe des murs de l’espace chauffé du bâtiment est faite d’un revêtement de façade isolant thermique pour une surface préparée, à l’aide d’un panneau d’isolation thermique de 150 mm, EPS, TERRANOVA weber.therm15 ou système équivalent d’isolation thermique de façade sur les surfaces de base de façade. Préparation de revêtement de façade isolant thermique, surface préparée, 30 mm vtg. Avec panneau d’isolation thermique EPS, TERRANOVA weber.therm15 ou système d’isolation thermique de façade équivalent, sur les enveloppes extérieures des ouvertures de fenêtre, jusqu’à 23 cm de largeur, conformément aux spécifications. Préparation d’un système d’isolation thermique piédestal à l’aide d’un système d’isolation thermique des piédestaux antigel, isolation thermique à cellules fermées en vtg de 70 mm, sur les surfaces de base des piédestaux. 2. Une isolation thermique en laine de roche de 20 cm d’épaisseur (par exemple: URSA HF-HL ou Rockwool Airrock LD (40 kg/m³) isolant thermique en laine de roche ou équivalent) est faite pour le plancher de fermeture. Comme protection contre l’eau de pluie entrant dans le toit, l’isolation thermique est fournie avec l’épandage de film perméable. 3. Remplacement des portes extérieures du bâtiment par des économies d’énergie dans des tailles originales de 5 chambres, fenêtre en plastique, profil 70 mm. Pour la structure murale correspondante, avec capture de mannequins, étanchéité et revêtements. UW• 1,15 W/m2K. Vitrage: 4+ 16 argon+ 4 super low-e verre Ug • 1,0 W/m2K. 5 chambre d’air 70 mm profil vtg. Intérieur et extérieur blanc, raidissement en acier galvanisé, double joint gris EPDM, fer ROTO NT (couleur argentée), poignées blanches, panneau d’agrafe isolé thermiquement. Facteur de transmission de chaleur pour portes et fenêtres: UW<1,35 W/m2K, inhibition du volume d’air: Catégorie LH 4. 4. MODERNISATION DU CHAUFFAGE: Pour le chauffage du bâtiment, la chaudière à gaz utilisée jusqu’à présent sera complètement démontée, remplacée par une chaudière à gaz à condensation alimentée au gaz Viessmann Vitodens d’une puissance nominale de 26 kW. Des équipements de régulation et auxiliaires pour la commande externe dépendante des intempéries de la chaudière sont installés. Les Raditars sont remplacés et de nouvelles vannes thermostat sont ajoutées. 5. ÉNERGIES RENOUVELABLES: Installation d’un panneau solaire complet de 3 kW (photovoltaïque) 6. (C) Respect des conditions énoncées au point 3.4 de l’appel: Le demandeur s’engage à respecter les exigences énoncées au point 3.4.1 de l’appel. Le projet respecte les normes en matière d’égalité des chances et d’environnement énoncées au point 3.4.1.2 de l’appel à propositions. Le projet ne présente aucun risque climatique prévisible. Le projet n’a pas d’incidence sur l’état de l’eau et aucun permis d’accès à l’eau n’est requis. La préparation de la documentation de conception technique et la préparation du projet complet ont été fondées sur les critères d’élaboration du projet décrits dans le présent chapitre. D) le respect des conditions fixées dans les critères d’évaluation de fond de l’appel: Le projet répond à tous les critères d’évaluation 1.1-1.5, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1-4.4, 5.1,7.2, 9.1-9.2, 10.1-10.6 et 10.8. Le projet prévu correspond aux objectifs du TOP, et la nécessité d’une justification et d’une utilisation professionnelles est appropriée. Le projet est bien fondé. Les risques potentiels ont été analysés. Aucune rénovation d’un bâtiment monumental ou protégé localement n’aura lieu. Le projet répond aux critères de durabilité. Le projet s’inscrit dans le cadre des projets d’autres PO. L’investissement n’est pas exclu pour aucun groupe social. dans le cas d’une procédure standard, la qualification du projet selon les critères d’évaluation spécifiques à la zone: Le développement qui en résulte est conforme à l’actuel programme de développement régional du comté de Jász-Nagykun-Szolnok (mesure 6.1) au niveau de l’intervention. Lors des interventions, l’amélioration de l’efficacité énergétique du bâtiment est un élément important. Notre règlement est 290/2014 sur la classification des districts bénéficiaires. Il est situé dans le district de Jászapáti, qui doit être développé avec le programme complexe, sur la base du décret gouvernemental (XI.26.) (XI.26.). La consommation d’énergie obtenue grâce au développement est supérieure à 20 % (50 %) par rapport à la moyenne des 3 dernières années. Le d... (French)
10 February 2022
0 references
Jászalsószentgyörgy, Jász-Nagykun-Szolnok
0 references
Identifiers
TOP-3.2.1-16-JN1-2017-00005