INDUSTRIAL PARK DEVELOPMENT IN MEZŐTÚR (Q3946757): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding French translations)
(‎Removed claims)
Property / co-financing rate
70.089916 percent
Amount70.089916 percent
Unitpercent
 
Property / co-financing rate: 70.089916 percent / rank
Normal rank
 
Property / EU contribution
1,189,040.3 Euro
Amount1,189,040.3 Euro
UnitEuro
 
Property / EU contribution: 1,189,040.3 Euro / rank
Preferred rank
 
Property / EU contribution: 1,189,040.3 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 1,189,040.3 Euro / qualifier
point in time: 6 December 2021
Timestamp+2021-12-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
430,000,000 forint
Amount430,000,000 forint
Unitforint
 
Property / EU contribution: 430,000,000 forint / rank
Normal rank
 
Property / budget
1,677,070.92 Euro
Amount1,677,070.92 Euro
UnitEuro
 
Property / budget: 1,677,070.92 Euro / rank
Preferred rank
 
Property / budget: 1,677,070.92 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 1,677,070.92 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
613,496,932.515 forint
Amount613,496,932.515 forint
Unitforint
 
Property / budget: 613,496,932.515 forint / rank
Normal rank
 

Revision as of 15:22, 13 February 2022

Project Q3946757 in Hungary
Language Label Description Also known as
English
INDUSTRIAL PARK DEVELOPMENT IN MEZŐTÚR
Project Q3946757 in Hungary

    Statements

    0 references
    1 March 2018
    0 references
    31 March 2021
    0 references
    Mezőtúr Város Önkormányzata
    0 references
    Q3961955 (Deleted Item)
    0 references

    47°0'1.69"N, 20°37'47.82"E
    0 references
    Az infrastrukturális fejlesztés rövid összefoglalása: A mezőtúri Ipari park fejlesztése két építéssel összefüggő infrastrukturális fejlesztést tartalmaz: 1. Közmű infrastruktúra kialakítása Az ipari park meglévő úthálózatából három útszakasz kerül kiépítésre szükséges a megrendelői igények alapján. A terület központi útját 223 m hosszan kerül meghosszabbításra. A meglévő útszakaszról nyugati irányban 175 m hosszú feltáró út, a tervezett meghosszabbított szakaszról szintén nyugati irányban egy 205 m hosszú feltáró út kerül kialakításra. A fejlesztés során a kiépítésre kerülő útburkolatok 6,0 m burkolat szélességgel és kétrétegű aszfaltburkolatú pályaszerkezettel kerülnek kialakításra. A tervezett bekötő utakkal párhuzamosan lefektetésre kerülő víz-, szennyvíz- és gázvezeték hálózatokat úgy kell elhelyezni, hogy lehetőség legyen a későbbiekben azok meghosszabbítására, valamint földmedrű vízelvezető árok kiépítésére az úttal párhuzamosan. A tervezési területen összesen 3995 m2 aszfaltburkolatú útburkolat kerül kiépítésre. A kiépítésre kerülő utakkal párhuzamosan az ingatlanok ellátását biztosító közműhálózatok épülnek melyek a következők: - 829 m ivóvíz vezeték - 842 m gravitációs szennyvíz vezeték - 750 gázelosztó vezeték - 440 m elektromos földkábel az új 1,6 MW-os trafóállomás megtáplálásához - 65 m elektromos bekötő földkábel trafóállomástól védőcsőben - 1025 m közvilágítási elektromos földkábel + 39 db kandeláber - 1140 m földmedrű csapadékvíz elvezető árok (A műszaki tartalom részletes kifejtésre kerül az engedélyes tervek összeállításakor az I. mérföldkőig.) 2. A szolgáltató és kiszolgáló műhely kialakítása: A fejlesztéshez kapcsolódó szakipari tevékenységek részletes műszaki leírását az engedélyes tervek fogják tartalmazni. Ebben részletezésre kerülnek a szerkezeti, az alapozási, külső és belső falazati, tetőszerkezeti, padozati, padló burkolattal és hőszigeteléssel összefüggő munkálatok. Az engedélyes tervekben pontosításra kerül továbbá a vízszigetelés, nyílászárók kialakítása, bádogos szerkezetek, belső felület képzés, álmennyezetek, térburkolatok, rámpák, valamint parkoló helyek kialakításának műszaki tartalma. Tartalmi értékelési szempontok: A felhívás terület specifikus mellékletének 1.2 pontjában szereplő elkülönített forrás felhasználási keretei közül a fejlesztés a Nagykunság–Tisza-tavi térség (Karcagi, Kunhegyesi és Tiszafüredi járások) és Mezőtúr térsége–Tiszazug (Mezőtúri és Kunszentmártoni járások) számára elkülönített indikatív keretösszegre irányul. A projekt a pályázati felhívás 3.1.1/A pontja alapján önállóan támogatható tevékenységeket tartalmaz: a.) Meglévő ipari parkok telek határon belüli alap infrastruktúra kiépítése, bővítése, korszerűsítése, közlekedő felület kialakítása, illetve telekhatáron kívüli alap infrastruktúra beruházás. b.) Szolgáltató tevékenységekhez kapcsolódó új épület építése A projekt a pályázati felhívás 3.1.2 pontja alapján önállóan nem támogatható tevékenységeket tartalmaz: a.) Akadály mentesítés b.) – c.) Energiahatékonysági intézkedés d.) Nyilvánosság biztosítása A felhívás 3.4.1.1. b.) pontja alapján a zöldmezős beruházást az alábbi indokok teszik szükségessé: • A beruházás által az ipari park teljes területe 100% -os mértékben közművesítésre kerül. A fejlesztési zónában található zöldmezős területek a város település rendezési terve alapján Gksz és Gip terület felhasználási besorolásúak. • Az így kialakított ipari területek értékesíthetővé, vonzó befektetési célponttá válnak, mivel képesek lesznek minden előzetes befektetői igény kielégítésére. • A fejlesztés révén új munkahelyek kerülnek létrehozásra. A felhívás 3.4 pontja alapján a beruházás a műszaki-szakmai elvárásoknak megfelel, a releváns előírások betartására a projektgazda vállalást tesz: A fejlesztéssel érintett területek 100 %-ban a pályázó szervezet tulajdonát képezik. A fejlesztési területen szolgáltató ház jelenleg nincs. A teljes műszaki dokumentáció, a tervezői költségvetéssel az I. mérföldkőig kerül összeállításra. A támogatási kérelemhez Üzleti tervet és költség-haszon elemzést csatoltunk. A felhívás 3.4.1.2 pontja alapján a beruházás a környezetvédelmi és az esélyegyenlőségi szempontoknak maximálisan megfelel: A projekt szegregációt nem közvetít. A projektgazda rendelkezik Helyi Esélyegyenlőségi Programmal (HEP). Az infrastrukturális beruházás érvényesíti az egyetemes tervezés elveit. Az időjárási viszonyokkal összefüggő kockázatok a kockázat elemzés során figyelembe lettek véve. A zöldmezős területekkel összefüggésben az I. mérföldkőig az ökológiai állapot felmérés elkészítésre kerül. (Hungarian)
    0 references
    Brief summary of infrastructure development: The development of the Agricultural Park includes two construction-related infrastructure developments: 1. Construction of utilities infrastructure The three sections of the existing road network of the industrial park need to be built based on the customer’s needs. The central road of the area is extended for a length of 223 m. A 175 m long exploratory mission from the existing road section to the west and a 205 m long exploratory mission from the planned extended section to the west. During the development, the pavings to be built will be constructed with a surface width of 6.0 m and a two-layer asphalt pavement structure. Water, sewage and gas pipeline networks to be laid in parallel to the planned access roads shall be located in such a way as to allow for their extension at a later stage and the construction of ground-bed drainage ditches in parallel to the road. A total of 3 995 m² of asphalt pavement will be built in the design area. In parallel to the roads to be built, the public utility networks for the provision of real estate are: — 829 m drinking water pipe — 842 m gravitational sewage pipeline — 750 gas distribution lines — 440 m electric ground cable for supplying the new 1.6 MW transformer station — 65 m electric input ground cable in protective pipe from a transformer station — 1 025 m public lighting electric earth cable + 39 candebade — 1 140 m rainwater drainage ditches (The technical content will be explained in detail when drawing up the permit plans up to milestone I.) 2. Establishment of the service and service workshop: A detailed technical description of the development-related professional activities will be included in the licensee’s plans. The works related to structural, foundation, external and internal masonry, roof structure, flooring, floor covering and thermal insulation are detailed in this section. The technical content of the construction of waterproofing, doors and windows, tin structures, inner surface training, suspended ceilings, floor coverings, ramps and parking spaces are also specified in the licensee’s plans. Content assessment criteria: Among the allocations for the specific funding set out in point 1.2 of the specific annex to the call area, the development concerns the indicative allocation for the Nagykunság-Tisza Lake region (Karcagi, Kunhegyesi and Tiszafüred districts) and Mezőtúre-Tiszazug (districts of Mezőtúr and Kunszentmárton). The project includes activities that can be independently supported under point 3.1.1/A of the call for proposals: a.) Existing industrial parks are building, expanding and modernising basic infrastructure within the boundary, creating a circulating surface, or investing in basic infrastructure outside the boundary. b.) Construction of a new building related to service activities The project includes activities that are ineligible independently on the basis of point 3.1.2 of the call for proposals: a.) Obstacle exemption b) — c) Energy efficiency measure d) Publication Based on point 3.4.1.1(b) of the call, greenfield investment is necessary for the following reasons: • 100 % of the total area of the industrial park will be improved by the investment. The greenfield areas in the development zone are classified as Gksz and Gip area according to the town’s planning plan. • The industrial areas thus designed will become marketable, attractive investment destinations, as they will be able to meet all ex ante investor needs. • New jobs will be created through development. According to point 3.4 of the call, the investment meets the technical and professional requirements, and the developer undertakes to comply with the relevant requirements: The applicant organisation owns 100 % of the areas covered by the development. There is currently no house service in the development area. The complete technical documentation, with the design budget, will be compiled up to milestone I. A business plan and a cost-benefit analysis are attached to the grant application. According to point 3.4.1.2 of the call, the investment is in full compliance with environmental and equal opportunities aspects: The project does not mediate segregation. The project promoter has a Local Equal Opportunities Programme (HEP). Investment in infrastructure implements the principles of universal design. The risks associated with weather conditions have been taken into account in the risk analysis. In relation to greenfield areas, the ecological status assessment will be carried out up to milestone I. (English)
    9 February 2022
    0 references
    Bref résumé du développement des infrastructures: Le développement du parc agricole comprend deux projets d’infrastructure liés à la construction: 1. Construction de l’infrastructure des services publics Les trois tronçons du réseau routier existant du parc industriel doivent être construits en fonction des besoins du client. La route centrale de la zone est prolongée sur une longueur de 223 m. Une mission exploratoire de 175 m de long depuis le tronçon routier existant vers l’ouest et une mission exploratoire de 205 m de long depuis le tronçon planifié vers l’ouest. Pendant le développement, les revêtements à construire seront construits avec une largeur de surface de 6,0 m et une structure asphaltée à deux couches. Les réseaux d’aqueduc, d’égouts et de gazoducs qui doivent être installés parallèlement aux routes d’accès prévues doivent être situés de manière à permettre leur extension à un stade ultérieur et la construction de fossés de drainage au sol parallèles à la route. Un total de 3 995 m² de chaussée asphaltée sera construit dans la zone de conception. Parallèlement aux routes à construire, les réseaux d’utilité publique pour la fourniture de biens immobiliers sont: — Conduite d’eau potable de 829 m — conduite d’égout gravitationnelle de 842 m — 750 lignes de distribution de gaz — Câble de terre électrique de 440 m pour l’alimentation de la nouvelle station de transformation de 1,6 MW — câble de terre d’entrée électrique de 65 m dans un tuyau de protection d’une station de transformateur — câble de terre électrique d’éclairage public de 1 025 m + 39 fossés de drainage des eaux de pluie de 1 140 m (Le contenu technique sera expliqué en détail lors de l’élaboration des plans d’autorisation jusqu’à l’étape I.) 2. Mise en place de l’atelier de service et de service: Une description technique détaillée des activités professionnelles liées au développement sera incluse dans les plans du titulaire de permis. Les travaux relatifs à la structure, la fondation, la maçonnerie externe et interne, la structure du toit, le revêtement de sol, le revêtement de sol et l’isolation thermique sont détaillés dans cette section. Le contenu technique de la construction d’imperméabilisation, de portes et de fenêtres, de structures d’étain, d’entraînement de surface intérieure, de plafonds suspendus, de revêtements de sol, de rampes et de places de stationnement est également précisé dans les plans du titulaire de permis. Critères d’évaluation du contenu: Parmi les dotations pour le financement spécifique visées au point 1.2 de l’annexe spécifique à la zone d’appel, le développement concerne l’allocation indicative pour la région du lac Nagykunság-Tisza (districts de Karcagi, Kunhegyesi et Tiszafüred) et Mezőtúre-Tiszazug (districts de Mezőtúr et de Kunszentmárton). Le projet comprend des activités pouvant bénéficier d’un soutien indépendant au titre du point 3.1.1/A de l’appel à propositions: a) Les parcs industriels existants construisent, agrandissent et modernisent l’infrastructure de base à l’intérieur de la frontière, créent une surface circulante ou investissent dans des infrastructures de base à l’extérieur de la frontière. b. Construction d’un nouveau bâtiment lié aux activités de services Le projet comprend des activités qui ne sont pas admissibles indépendamment sur la base du point 3.1.2 de l’appel à propositions: a) Exonération des obstacles b) — c) Mesure de l’efficacité énergétique d) Publication Sur la base du point 3.4.1.1 b) de l’appel, des investissements nouveaux sont nécessaires pour les raisons suivantes: • 100 % de la superficie totale du parc industriel sera améliorée par l’investissement. Les zones vierges de la zone de développement sont classées comme zones Gksz et Gip selon le plan d’aménagement de la ville. • Les zones industrielles ainsi conçues deviendront des destinations d’investissement commercialisables et attrayantes, car elles seront en mesure de répondre à tous les besoins ex ante des investisseurs. • Le développement créera de nouveaux emplois. Conformément au point 3.4 de l’appel, l’investissement répond aux exigences techniques et professionnelles et le maître d’ouvrage s’engage à respecter les exigences pertinentes: L’organisme demandeur possède 100 % des zones couvertes par le développement. Il n’y a actuellement aucun service domestique dans la zone de développement. La documentation technique complète, avec le budget de conception, sera compilée jusqu’à l’étape I. Un plan d’affaires et une analyse coûts-avantages sont joints à la demande de subvention. Selon le point 3.4.1.2 de l’appel à propositions, l’investissement est pleinement conforme aux aspects environnementaux et de l’égalité des chances: Le projet ne médie pas la ségrégation. Le promoteur du projet dispose d’un programme local d’égalité des chances (HEP). L’investissement dans les infrastructures met en œuvre les principes de conception universelle. Les risques associés aux conditions météorologiques o... (French)
    10 February 2022
    0 references
    Mezőtúr, Jász-Nagykun-Szolnok
    0 references

    Identifiers

    TOP-1.1.1-16-JN1-2017-00005
    0 references