Installation of solar panel system at Csirmaz and Partner Ltd. (Q3935692): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
55.0 percent
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
3,519,120.0 forint
| |||||||||||||||
Property / budget: 3,519,120.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
9,948.55 Euro
| |||||||||||||||
Property / budget: 9,948.55 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 9,948.55 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 9,948.55 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
1,935,516.0 forint
| |||||||||||||||
Property / EU contribution: 1,935,516.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
5,471.7 Euro
| |||||||||||||||
Property / EU contribution: 5,471.7 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 5,471.7 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 5,471.7 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
|
Revision as of 11:50, 13 February 2022
Project Q3935692 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of solar panel system at Csirmaz and Partner Ltd. |
Project Q3935692 in Hungary |
Statements
1,935,516.0 forint
0 references
3,519,120.0 forint
0 references
55.0 percent
0 references
1 January 2021
0 references
31 December 2021
0 references
Csirmaz és Társa Épületgépészeti és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A projekt keretében egy 8,8 kWp névleges teljesítményű napelemrendszer kerül telepítésre és beüzemelésre. A projekt főbb műszaki adatai: Napelem: SHARP ND-AK275 típusú polikristályos napelem, 275 Wp, 32 db Inverter: Solaredge SE9K-ER-01 háromfázisú, 9 kW, 1 db Teljesítmény optimalizáló: Solaredge P600-5R M4M RL, 16 db A projekt megvalósításának ütemezése: Helyszíni felmérés: Egy helyszíni bejárás során a kivitelező szakemberei rögzítették a megvalósítási helyszín paramétereit, megvizsgálták a hálózati csatlakozási pont, a mérőórák alkalmasságát, megfelelőségét. Igények meghatározása: Az áramszámlák áttekintésével meghatározásra került a korábbi fogyasztás, a megrendelővel való egyeztetést követően pedig a telepítendő rendszer kapacitása, teljesítménye. Az így körvonalazott igény a szükséges műszaki és tulajdonosi nyilatkozatok megtételét követően az ingatlan adataival bejelentésre kerül az NKM Áramhálózat Kft-hez. Követelmények meghatározása: A benyújtott igénybejelentést az NKM Áramhálózat Kft. megválaszolja: levélben tájékoztat a hálózatra csatlakozás lehetőségéről, követelményeiről, meghatározza a készítendő csatlakozási dokumentáció tartalmát. Csatlakozási tervdokumentáció elkészítése: A követelményeknek megfelelő csatlakozási tervdokumentációt a kivitelező megfelelő jogosultsággal rendelkező munkatársai készítik el. Csatlakozási tervdokumentáció jóváhagyása: A csatlakozási tervdokumentációt a meghatalmazott kivitelező nyújtja be az NKM Áramhálózat Kft-hez, aki azt az esetlegesen szükséges korrekciók végrehajtását követően, megfelelőség esetén jóváhagyja. Hálózati csatlakozási szerződés megkötése: A jóváhagyott csatlakozási tervdokumentáció után kerülhet sor a Hálózati csatlakozási szerződés megkötésére, amely biztosítja a hálózatba történő betáplálás lehetőségét. A Hálózati csatlakozási szerződéssel egy időben az NKM Áramhálózat Kft. kiküldi a Hálózathasználati igénybejelentőt, melyen a választott villamos-energia kereskedő cég igazolja, hogy a vételezett energiát szolgáltatja és a megtermeltet átveszi. Kivitelezés: A jóváhagyott tervdokumentáció alapján a kivitelező telepíti a napelemes rendszert: tartószerkezet telepítése; napelem táblák felszerelése; egyenáramú kábelezés és védelmi eszközök kiépítése; váltakozóáramú kábelezés és védelmi eszközök kiépítése; inverter felszerelése; rendszer összekapcsolása (egyelőre hálózatra kapcsolás nélkül!). A háztartási méretű kiserőmű készre jelentése: A kiserőmű és a villamos hálózat kiépítését követően a kivitelező elkészíti a megvalósult villamos bekötés műszaki rajzát, valamint a megfelelőségéről nyilatkozik, majd a dokumentációt megküldi az NKM Áramhálózat Kft-nek. A háztartási méretű kiserőmű üzembe helyezése: Előzetesen az NKM Áramhálózat Kft. szerelői ellenőrzik a jóváhagyott csatlakozási tervdokumentációnak és a szabványoknak történő megfelelést, majd végrehajtják a fogyasztásmérő cseréjét. A Hálózathasználati szerződés megküldése: Az üzembe helyezést követően az NKM Áramhálózat Kft. megküldi megrendelőnek a vételezésre és betáplálásra szolgáló Hálózathasználati szerződést. A projekt menedzselését Csirmaz András, a Csirmaz és Társa Kft. tulajdonos-ügyvezetője fogja ellátni, akinek több tízéves szakmai tapasztalata van beruházási projektek végrehajtásában nemcsak az ügyfelek esetében a cég szolgáltatásának részeként, hanem a saját telephely korábbi fejlesztéseiben is. (Hungarian)
0 references
As part of the project, a solar panel system with a rated output of 8.8 kWp will be installed and installed. Main technical data of the project: Solar panel: Sharp ND-AK275 polycrystalline solar panel, 275 Wp, 32 pcs Inverter: SolarEdge SE9K-ER-01 three-phase, 9 kW, 1 pcs Power Optimiser: SolarEdge P600-5R M4M RL, 16 pcs Project implementation schedule: Field survey: During an on-site visit, the contractor’s experts fixed the parameters of the implementation site, examined the suitability and appropriateness of the network connection point, the meters. Identification of needs: By reviewing the electricity bills, the previous consumption was determined, and after consultation with the customer, the capacity and performance of the system to be installed was determined. After making the necessary technical and proprietary declarations, the demand outlined in this way will be reported to NKM Power Network Kft. with the property data. Definition of requirements: NKM Electricity Network Kft. responds to the submitted request: by letter, you will inform us about the possibility and requirements of the network, and specify the content of the connection documentation to be drawn up. Preparation of accession plan documentation: The installation plan documentation that meets the requirements is prepared by the contractor’s authorised staff. Approval of accession plan documentation: The connection plan documentation shall be submitted by the authorised contractor to the NKM Power Network Kft, who shall approve it after any necessary corrections have been made, in case of conformity. Conclusion of network connection contract: After the approved accession plan documentation, the Network Connection Treaty may be concluded, which provides for the possibility of entering into the network. At the same time as the Network Connection Agreement, NKM Power Network Kft. sends out the Network Usage Applicant, where the chosen electricity-energy trading company certifies that it delivers the energy received and takes over the production. Execution: Based on the approved design documentation, the contractor installs the solar system: installation of a support structure; installation of solar panel boards; the construction of DC cabling and protective devices; installation of AC cabling and protective devices; installation of an inverter; system interconnection (for now without connection to the network!). Household-sized small power plant is ready to report: After the construction of the small power plant and the electricity network, the contractor shall draw up a technical drawing of the completed electrical connection and declare its conformity, and then send the documentation to NKM Power Network Kft. Installation of a small household-sized power plant: In advance, the installers of NKM power grid Kft. check compliance with the approved connection plan documentation and standards, and then perform the replacement of the meter. Transmission of the Network Use Contract: After commissioning, NKM Power Network Kft. sends to the customer the network usage contract for off-take and feed-in. The project will be managed by András Csirmaz, owner-manager of Csirmaz and Társa Kft., who has tens of years of professional experience in implementing investment projects not only as part of the company’s service, but also in previous developments of their own site. (English)
8 February 2022
0 references
Dans le cadre du projet, un système de panneaux solaires d’une puissance nominale de 8,8 kWp sera installé et installé. Principales données techniques du projet: Panneau solaire: Panneau solaire polycristallin ND-AK275, 275 Wp, 32 pcs Inverter: SolarEdge SE9K-ER-01 triphasé, 9 kW, 1 pcs Optimisateur de puissance: SolarEdge P600-5R M4M RL, 16 PCs Calendrier de mise en œuvre du projet: Enquête sur le terrain: Lors d’une visite sur place, les experts du contractant ont fixé les paramètres du site de mise en œuvre, examiné l’adéquation et l’adéquation du point de connexion réseau, des compteurs. Identification des besoins: En examinant les factures d’électricité, la consommation précédente a été déterminée et, après consultation du client, la capacité et les performances du système à installer ont été déterminées. Après avoir fait les déclarations techniques et de propriété nécessaires, la demande décrite de cette manière sera communiquée à NKM Power Network Kft. avec les données de propriété. Définition des exigences: NKM Electricity Network Kft. répond à la demande présentée: par lettre, vous nous informerez de la possibilité et des exigences du réseau et préciserez le contenu de la documentation de connexion à établir. Préparation de la documentation relative au plan d’adhésion: La documentation du plan d’installation qui répond aux exigences est préparée par le personnel autorisé de l’entrepreneur. Approbation de la documentation relative au plan d’adhésion: La documentation relative au plan de raccordement est soumise par le contractant agréé au réseau électrique NKM Kft, qui l’approuve après que les corrections nécessaires auront été apportées, en cas de conformité. Conclusion du contrat de connexion au réseau: Après l’approbation de la documentation relative au plan d’adhésion, le traité sur la connexion au réseau peut être conclu, qui prévoit la possibilité d’entrer dans le réseau. En même temps que l’accord de connexion au réseau, NKM Power Network Kft. envoie à la requérante l’utilisation du réseau, où la société de négoce d’électricité-énergie choisie certifie qu’elle fournit l’énergie reçue et reprend la production. Exécution: Sur la base de la documentation de conception approuvée, le contractant installe le système solaire: l’installation d’une structure de soutènement; installation de panneaux solaires; la construction de câbles en courant continu et de dispositifs de protection; installation de câblage en courant alternatif et de dispositifs de protection; installation d’un onduleur; interconnexion du système (pour l’instant sans connexion au réseau!). Une petite centrale électrique de taille domestique est prête à déclarer: Après la construction de la petite centrale et du réseau électrique, le contractant établit un plan technique du raccordement électrique achevé et déclare sa conformité, puis transmet la documentation à NKM Power Network Kft. Installation d’une petite centrale électrique de taille domestique: À l’avance, les installateurs du réseau électrique NKM Kft. vérifient la conformité avec la documentation et les normes du plan de raccordement approuvé, puis effectuent le remplacement du compteur. Transmission du contrat d’utilisation du réseau: Après la mise en service, NKM Power Network Kft. envoie au client le contrat d’utilisation du réseau pour l’enlèvement et le rachat. Le projet sera géré par András Csirmaz, propriétaire-gestionnaire de Csirmaz et Társa Kft., qui a des dizaines d’années d’expérience professionnelle dans la mise en œuvre de projets d’investissement non seulement dans le cadre du service de l’entreprise, mais aussi dans les développements antérieurs de leur propre site. (French)
10 February 2022
0 references
Mezőkövesd, Borsod-Abaúj-Zemplén
0 references
Identifiers
GINOP-4.1.4-19-2020-02858
0 references